HomeMy WebLinkAboutTRUSSCUTS - revisionAlpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 1:
Customer: Central Florida Truss, Inc.Job Number: 21-0330
Job Description: /GROZA BUILDERS, INC. / /WELLS RESIDENCE
Address: XXXX BROCKSMITH ROAD, St. Lucie, FL
Job Engineering Criteria:
Design Code: FBC 7th Ed. 2020 Res IntelliVIEW Version: 20.02.00A
JRef #: 1X4V7610002
Wind Standard: ASCE 7-16 Wind Speed (mph): 170 Design Loading (psf): 37.00
Building Type: Closed
This package contains general notes pages, 89 truss drawing(s) and 4 detail(s).
Item Drawing Number Truss Item Drawing Number Truss
1 116.21.0941.18047 T1 2 116.21.0941.28150 T2
3 116.21.0941.57010 T3 4 116.21.0942.54473 T4
5 116.21.0946.39237 T5 6 116.21.0946.41640 T6
7 116.21.0946.44487 T7 8 116.21.0946.49823 T8
9 116.21.0946.54487 T9 10 116.21.0946.57463 T10
11 116.21.0947.00517 T11 12 116.21.0947.03800 T12
13 116.21.0947.12133 T13 14 116.21.0947.19423 T14
15 116.21.0947.23330 T15 16 116.21.0947.29803 T16
17 116.21.0947.34903 T17 18 116.21.0947.42233 T18
19 116.21.0947.45847 T19 20 116.21.0948.44520 T20
21 116.21.0948.46620 T21 22 116.21.0948.48310 T22
23 116.21.0948.50130 T23 24 116.21.0948.52330 T24
25 116.21.0949.10567 T25 26 116.21.0949.12847 T26
27 116.21.0949.14877 T27 28 116.21.0949.17883 T28
29 116.21.0949.21280 T29 30 116.21.0949.23803 T30
31 116.21.1002.43447 T31 32 116.21.1006.12297 T32
33 116.21.1006.14553 T33 34 116.21.1006.22550 T34
35 116.21.1010.12473 T35 36 116.21.1010.24627 T36
37 116.21.1029.34257 T37 38 116.21.1010.32713 T38
39 116.21.1011.05490 T39 40 116.21.1011.08400 T40
41 116.21.1011.11770 T41 42 116.21.1011.25157 T42
43 116.21.1011.40730 T43 44 116.21.1011.52967 T44
45 116.21.1011.59220 T44 46 116.21.1012.01100 T45
47 116.21.1012.23283 T45 48 116.21.1012.38283 T46
49 116.21.1012.42753 T46 50 116.21.1012.45220 T47
51 116.21.1012.47873 T47 52 116.21.1012.49667 T48
Florida Certificate of Product Approval #FL1999 Printed 4/26/2021 10:40:17 AM
04/26/2021
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 2:
Customer: Central Florida Truss, Inc.Job Number: 21-0330
Job Description: /GROZA BUILDERS, INC. / /WELLS RESIDENCE
Address: XXXX BROCKSMITH ROAD, St. Lucie, FL
Item Drawing Number Truss Item Drawing Number Truss
53 116.21.1012.51957 T48 54 116.21.1012.57113 T49
55 116.21.1016.28850 T49 56 116.21.1016.32890 T50
57 116.21.1016.34810 V1 58 116.21.1016.36537 V2
59 116.21.1016.38190 V3 60 116.21.1016.42890 V4
61 116.21.1016.44443 V5 62 116.21.1016.46503 V6
63 116.21.1016.48300 V7 64 116.21.1016.49883 V8
65 116.21.1016.51480 J1 66 116.21.1016.52983 J2
67 116.21.1016.54387 J3 68 116.21.1016.55660 J4
69 116.21.1016.57583 J5 70 116.21.1016.59907 J6
71 116.21.1017.15350 J6G 72 116.21.1017.16900 K1
73 116.21.1017.28023 K2 74 116.21.1017.29967 K3
75 116.21.1017.32113 K4 76 116.21.1018.03930 K5
77 116.21.1018.43897 K6 78 116.21.1023.03773 C1
79 116.21.1023.08323 C1A 80 116.21.1023.10853 C2
81 116.21.1023.13727 C2A 82 116.21.1023.57337 C3
83 116.21.1024.06870 C4 84 116.21.1024.52970 C5
85 116.21.1026.51293 C5A 86 116.21.1026.53067 C6
87 116.21.1026.54527 HJ7A 88 116.21.1026.55830 HJ7BL
89 116.21.1026.57123 HJ7BR 90 BRCLBSUB0119
91 DEFLCAMB1014 92 VAL180160118
93 VALTN160118
Florida Certificate of Product Approval #FL1999 Printed 4/26/2021 10:40:17 AM
04/26/2021
COA #0 278
General Notes
Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities:
The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1,
Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate
Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design
Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and
dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to
independently verify the accuracy or completeness of the information provided by others and may rely on that information
without liability. The responsibility for verification of that information remains with others neither employed nor controlled
by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page
listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component
designs and not for the technical information furnished by others which technical information and consequences thereof
remain their sole responsibility.
The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in
accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and
loads for each truss component match those required by the plans and by the actual use of the individual component, and
for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any
additional factors required in the particular application. Truss components using metal connector plates with integral teeth
shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to
exceed 19% and/or cause corrosion of connector plates and other metal fasteners.
The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set
forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss
component design loads, inspection of the truss components before or after installation, the design of temporary or
permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear
walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the
foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports,
installation of the truss components, observation of the truss component installation process, review of truss assembly
procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in
the installation of the truss components and/or its connections.
This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic
file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request.
Temporary Lateral Restraint and Bracing:
Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2,
B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or
other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these
drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to
and may not be relied upon for the temporary stability of the truss components during their installation.
Permanent Lateral Restraint and Bracing:
The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of
the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of
BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional.
These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building
stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building
Designer.
Connector Plate Information:
Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations,
gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60.
Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at
www.icc-es.org.
Fire Retardant Treated Lumber:
Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all
stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special
handling care must be taken to prevent breakage during all handling activities.
Page 1 of 3
General Notes (continued)
Key to Terms:
Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed
information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be
found in calculation sheets available upon written request.
BCDL = Bottom Chord standard design Dead Load in pounds per square foot.
BCLL = Bottom Chord standard design Live Load in pounds per square foot.
CL = Certified lumber.
Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot.
FRT = Fire Retardant Treated lumber.
FRT-DB = D-Blaze Fire Retardant Treated lumber.
FRT-DC = Dricon Fire Retardant Treated lumber.
FRT-FP = FirePRO Fire Retardant Treated lumber.
FRT-FL = FlamePRO Fire Retardant Treated lumber.
FRT-FT = FlameTech Fire Retardant Treated lumber.
FRT-PG = PYRO-GUARD Fire Retardant Treated lumber.
g = green lumber.
HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches.
HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep
adjustment.
HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds.
Ic = Incised lumber.
FJ = Finger Jointed lumber.
L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value.
L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the
referenced panel point. Reported as 999 if greater than or equal to 999.
Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection.
Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases.
Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases.
Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases.
NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot.
PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds.
PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds
PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds.
PP = Panel Point.
R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc).
-R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc).
Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the
indicated location (Loc).
RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic)
load cases, at the indicated location (Loc).
Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
identified location (Loc).
TCDL = Top Chord standard design Dead Load in pounds per square foot.
TCLL = Top Chord standard design Live Load in pounds per square foot.
U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
indicated location (Loc).
VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in
inches.
VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and
maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment.
VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load.
VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment.
W = Width of non-hanger bearing, in inches.
Refer to ASCE-7 for Wind and Seismic abbreviations.
Uppercase Acronyms not explained above are as defined in TPI 1.
Page 2 of 3
References:
1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org.
2. ICC: International Code Council; www.iccsafe.org.
3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO
63045; www.alpineitw.com.
4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org.
5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcindustry.com.
Page 3 of 3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W1,W9 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 16.92
BC: From 10 plf at 0.00 to 10 plf at 16.92
BC: 1573 lb Conc. Load at 1.67,13.67
BC: 1566 lb Conc. Load at 3.67
BC: 1575 lb Conc. Load at 5.67, 7.67, 9.67
BC: 1574 lb Conc. Load at 11.67
BC: 1587 lb Conc. Load at 15.67
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 6455 /-/-/-/3927 /-
F 6782 /-/-/-/4135 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =2.5
F Brg Width = 3.5 Min Req =2.7
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 811 -1331
B - C 1318 -2160
Chords Tens.Comp.
C - D 1133 -1859
D - E 1133 -1859
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 1223 -744
Chords Tens.Comp.
H - G 2144 -1309
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - J 1261 -2067
A - I 1961 -1193
B - I 311 -481
B - H 1340 -820
Webs Tens.Comp.
C - G 255 -415
G - E 2573 -1568
E - F 1105 -1801
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.89 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.055 H 999 360
VERT(CL):0.091 H 999 240
HORZ(LL):-0.019 B - -
HORZ(TL):0.031 B - -
Creep Factor: 2.0
Max TC CSI:0.245
Max BC CSI:0.821
Max Web CSI:0.581
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T1
Ply: 3
Qty:1
SEQN:166393 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T62
DrwNo:116.21.0941.18047
AK /WHK 04/26/2021
3 Complete Trusses Required
W1
W9
1"16'9"1"
2'9"2
2'9"2
7'7"7
4'10"5
12'0"7
4'5"1
16'11"
4'10"9
2'9"2
2'9"2
7'3"15
4'6"13
12'0"7
4'8"9
16'11"
4'10"93'10"125'0"811'5"
A
B C D E
FGHIJ
5 12
5X5
3X10
4X8
5X5 5X6
3X4 1.5X4
7X8
5X6
3X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W1,W9 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 16.92
BC: From 10 plf at 0.00 to 10 plf at 16.92
BC: 1573 lb Conc. Load at 1.67,13.67
BC: 1566 lb Conc. Load at 3.67
BC: 1575 lb Conc. Load at 5.67, 7.67, 9.67
BC: 1574 lb Conc. Load at 11.67
BC: 1587 lb Conc. Load at 15.67
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 6455 /-/-/-/3927 /-
F 6782 /-/-/-/4135 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =2.5
F Brg Width = 3.5 Min Req =2.7
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 811 -1331
B - C 1318 -2160
Chords Tens.Comp.
C - D 1133 -1859
D - E 1133 -1859
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 1223 -744
Chords Tens.Comp.
H - G 2144 -1309
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - J 1261 -2067
A - I 1961 -1193
B - I 311 -481
B - H 1340 -820
Webs Tens.Comp.
C - G 255 -415
G - E 2573 -1568
E - F 1105 -1801
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.89 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.055 H 999 360
VERT(CL):0.091 H 999 240
HORZ(LL):-0.019 B - -
HORZ(TL):0.031 B - -
Creep Factor: 2.0
Max TC CSI:0.245
Max BC CSI:0.821
Max Web CSI:0.581
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T1
Ply: 3
Qty:1
SEQN:166393 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T62
DrwNo:116.21.0941.18047
AK /WHK 04/26/2021
3 Complete Trusses Required
W1
W9
1"16'9"1"
2'9"2
2'9"2
7'7"7
4'10"5
12'0"7
4'5"1
16'11"
4'10"9
2'9"2
2'9"2
7'3"15
4'6"13
12'0"7
4'8"9
16'11"
4'10"93'10"125'0"811'5"
A
B C D E
FGHIJ
5 12
5X5
3X10
4X8
5X5 5X6
3X4 1.5X4
7X8
5X6
3X10
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 5.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 5.08
TC: From 28 plf at 5.08 to 28 plf at 13.71
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.08
BC: From 10 plf at 5.08 to 10 plf at 13.71
BC: 1312 lb Conc. Load at 5.08
BC: 689 lb Conc. Load at 7.08, 9.08
BC: 686 lb Conc. Load at 11.08
BC: 685 lb Conc. Load at 13.08
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 2037 /-/-/-/1260 /-
G 2789 /-/-/-/1751 /-
Wind reactions based on MWFRS
K Brg Width = 7.6 Min Req =1.5
G Brg Width = 3.5 Min Req =1.6
Bearings K & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1406 -2289
Chords Tens.Comp.
C - D 786 -1266
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 2091 -1277
J - I 2058 -1258
Chords Tens.Comp.
I - H 1076 -665
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - C 790 -445
C - I 613 -1017
Webs Tens.Comp.
I - D 1394 -840
D - H 898 -1453
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.054 J 999 360
VERT(CL):0.093 J 999 240
HORZ(LL):0.019 F - -
HORZ(TL):0.032 F - -
Creep Factor: 2.0
Max TC CSI:0.330
Max BC CSI:0.652
Max Web CSI:0.411
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T2
Ply: 2
Qty:1
SEQN:166280 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T38
DrwNo:116.21.0941.28150
AK /WHK 04/26/2021
2 Complete Trusses Required
13'8"8
5'2"15
5'2"15
9'5"6
4'2"6
13'6"
4'0"10
13'8"8
2"8
5'1"3
5'1"3
9'1"14
4'0"10
13'2"12
4'0"14
13'8"8
5"12
1'
4"1 6'0"106'5"59'5"A
B
C
D
E F
GHIJK
5 12
3X5(A1)4X4
3X4
4X5
3X8
1.5X4
10X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 5.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 5.08
TC: From 28 plf at 5.08 to 28 plf at 13.71
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.08
BC: From 10 plf at 5.08 to 10 plf at 13.71
BC: 1312 lb Conc. Load at 5.08
BC: 689 lb Conc. Load at 7.08, 9.08
BC: 686 lb Conc. Load at 11.08
BC: 685 lb Conc. Load at 13.08
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 2037 /-/-/-/1260 /-
G 2789 /-/-/-/1751 /-
Wind reactions based on MWFRS
K Brg Width = 7.6 Min Req =1.5
G Brg Width = 3.5 Min Req =1.6
Bearings K & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1406 -2289
Chords Tens.Comp.
C - D 786 -1266
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 2091 -1277
J - I 2058 -1258
Chords Tens.Comp.
I - H 1076 -665
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - C 790 -445
C - I 613 -1017
Webs Tens.Comp.
I - D 1394 -840
D - H 898 -1453
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.054 J 999 360
VERT(CL):0.093 J 999 240
HORZ(LL):0.019 F - -
HORZ(TL):0.032 F - -
Creep Factor: 2.0
Max TC CSI:0.330
Max BC CSI:0.652
Max Web CSI:0.411
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T2
Ply: 2
Qty:1
SEQN:166280 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T38
DrwNo:116.21.0941.28150
AK /WHK 04/26/2021
2 Complete Trusses Required
13'8"8
5'2"15
5'2"15
9'5"6
4'2"6
13'6"
4'0"10
13'8"8
2"8
5'1"3
5'1"3
9'1"14
4'0"10
13'2"12
4'0"14
13'8"8
5"12
1'
4"1 6'0"106'5"59'5"A
B
C
D
E F
GHIJK
5 12
3X5(A1)4X4
3X4
4X5
3X8
1.5X4
10X10
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T1 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 6.94
TC: From 28 plf at 6.94 to 28 plf at 35.17
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.97
BC: From 10 plf at 6.97 to 10 plf at 35.17
TC: 378 lb Conc. Load at 6.97
TC: 168 lb Conc. Load at 9.00,11.00,13.00,15.00
17.00,19.00,21.00,23.00,25.00,27.00,29.00,31.00
33.00,35.00
BC: 485 lb Conc. Load at 6.97
BC: 125 lb Conc. Load at 9.00,11.00,13.00,15.00
17.00,19.00,21.00,23.00,25.00,27.00,29.00,31.00
33.00,35.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 3196 /-/-/-/1956 /-
I 3406 /-/-/-/2093 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
I Brg Width = 3.5 Min Req =2.0
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2231 -3649
C - D 2864 -4688
D - E 3077 -5030
Chords Tens.Comp.
E - F 3077 -5030
F - G 2654 -4336
G - H 1651 -2699
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 3332 -2026
N - M 3347 -2028
M - L 4737 -2907
Chords Tens.Comp.
L - K 4399 -2705
K - J 2818 -1738
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 1514 -944
M - D 439 -491
L - F 717 -423
F - K 516 -644
Webs Tens.Comp.
K - G 1736 -1047
G - J 880 -1198
J - H 3031 -1854
H - I 1046 -1588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.399 E 999 360
VERT(CL):0.701 E 599 240
HORZ(LL):-0.078 I - -
HORZ(TL):0.138 I - -
Creep Factor: 2.0
Max TC CSI:0.590
Max BC CSI:0.849
Max Web CSI:0.684
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T3
Ply: 2
Qty:1
SEQN:166293 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T9
DrwNo:116.21.0941.57010
AK /WHK 04/26/2021
2 Complete Trusses Required
T1
B3
35'2"
6'11"4
6'11"4
12'9"13
5'10"9
18'3"2
5'5"5
23'8"6
5'5"5
29'3"7
5'7"1
35'2"
5'10"9
7'1"
7'1"
12'6"5
5'5"5
18'3"2
5'8"13
23'11"14
5'8"13
29'7"7
5'7"9
35'2"
5'6"91'
4"1 3'2"123'7"89'5"A
B
C D E F G H
IJKLMN
5
12
3X8(A1)
5X8
1.5X4 H0510
3X4 5X5
3X8
3X4
5X8
4X5
4X8
4X8
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T1 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 6.94
TC: From 28 plf at 6.94 to 28 plf at 35.17
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.97
BC: From 10 plf at 6.97 to 10 plf at 35.17
TC: 378 lb Conc. Load at 6.97
TC: 168 lb Conc. Load at 9.00,11.00,13.00,15.00
17.00,19.00,21.00,23.00,25.00,27.00,29.00,31.00
33.00,35.00
BC: 485 lb Conc. Load at 6.97
BC: 125 lb Conc. Load at 9.00,11.00,13.00,15.00
17.00,19.00,21.00,23.00,25.00,27.00,29.00,31.00
33.00,35.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 3196 /-/-/-/1956 /-
I 3406 /-/-/-/2093 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
I Brg Width = 3.5 Min Req =2.0
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2231 -3649
C - D 2864 -4688
D - E 3077 -5030
Chords Tens.Comp.
E - F 3077 -5030
F - G 2654 -4336
G - H 1651 -2699
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 3332 -2026
N - M 3347 -2028
M - L 4737 -2907
Chords Tens.Comp.
L - K 4399 -2705
K - J 2818 -1738
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 1514 -944
M - D 439 -491
L - F 717 -423
F - K 516 -644
Webs Tens.Comp.
K - G 1736 -1047
G - J 880 -1198
J - H 3031 -1854
H - I 1046 -1588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.399 E 999 360
VERT(CL):0.701 E 599 240
HORZ(LL):-0.078 I - -
HORZ(TL):0.138 I - -
Creep Factor: 2.0
Max TC CSI:0.590
Max BC CSI:0.849
Max Web CSI:0.684
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T3
Ply: 2
Qty:1
SEQN:166293 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T9
DrwNo:116.21.0941.57010
AK /WHK 04/26/2021
2 Complete Trusses Required
T1
B3
35'2"
6'11"4
6'11"4
12'9"13
5'10"9
18'3"2
5'5"5
23'8"6
5'5"5
29'3"7
5'7"1
35'2"
5'10"9
7'1"
7'1"
12'6"5
5'5"5
18'3"2
5'8"13
23'11"14
5'8"13
29'7"7
5'7"9
35'2"
5'6"91'
4"1 3'2"123'7"89'5"A
B
C D E F G H
IJKLMN
5
12
3X8(A1)
5X8
1.5X4 H0510
3X4 5X5
3X8
3X4
5X8
4X5
4X8
4X8
2X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1388 /-/-/843 /807 /244
I 1315 /-/-/649 /790 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
I Brg Width = 3.5 Min Req =1.6
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1684 -2829
C - D 1521 -2585
D - E 1868 -3054
Chords Tens.Comp.
E - F 1760 -2913
F - G 1760 -2913
G - H 1145 -1907
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2565 -1698
M - L 2354 -1459
Chords Tens.Comp.
L - K 3076 -1890
K - J 1981 -1201
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 810 -473
K - G 1084 -651
G - J 722 -962
Webs Tens.Comp.
J - H 2188 -1313
H - I 810 -1258
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.253 E 999 360
VERT(CL):0.473 E 889 240
HORZ(LL):0.062 I - -
HORZ(TL):0.115 I - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.845
Max Web CSI:0.752
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T4
Ply: 1
Qty:1
SEQN:166297 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T2
DrwNo:116.21.0942.54473
AK /WHK 04/26/2021
35'2"
4'9"8
4'9"8
8'11"4
4'1"12
15'8"9
6'9"5
22'0"10
6'4"1
28'4"11
6'4"1
35'2"
6'9"5
8'11"4
8'11"4
15'5"1
6'5"13
22'0"10
6'7"9
28'8"3
6'7"9
35'2"
6'5"131'
4"1 4'0"124'5"8(a)
9'5"A
B
C
D E F G H
IJKLM
5 12
3X6(A1)
1.5X4
5X8
3X4 5X5
3X4 5X5
4X7
3X4
5X8
5X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1388 /-/-/843 /807 /244
I 1315 /-/-/649 /790 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
I Brg Width = 3.5 Min Req =1.6
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1684 -2829
C - D 1521 -2585
D - E 1868 -3054
Chords Tens.Comp.
E - F 1760 -2913
F - G 1760 -2913
G - H 1145 -1907
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2565 -1698
M - L 2354 -1459
Chords Tens.Comp.
L - K 3076 -1890
K - J 1981 -1201
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 810 -473
K - G 1084 -651
G - J 722 -962
Webs Tens.Comp.
J - H 2188 -1313
H - I 810 -1258
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.253 E 999 360
VERT(CL):0.473 E 889 240
HORZ(LL):0.062 I - -
HORZ(TL):0.115 I - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.845
Max Web CSI:0.752
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T4
Ply: 1
Qty:1
SEQN:166297 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T2
DrwNo:116.21.0942.54473
AK /WHK 04/26/2021
35'2"
4'9"8
4'9"8
8'11"4
4'1"12
15'8"9
6'9"5
22'0"10
6'4"1
28'4"11
6'4"1
35'2"
6'9"5
8'11"4
8'11"4
15'5"1
6'5"13
22'0"10
6'7"9
28'8"3
6'7"9
35'2"
6'5"131'
4"1 4'0"124'5"8(a)
9'5"A
B
C
D E F G H
IJKLM
5 12
3X6(A1)
1.5X4
5X8
3X4 5X5
3X4 5X5
4X7
3X4
5X8
5X5
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1388 /-/-/869 /800 /295
I 1315 /-/-/662 /796 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
I Brg Width = 3.5 Min Req =1.6
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1615 -2834
C - D 1430 -2404
D - E 1565 -2532
Chords Tens.Comp.
E - F 1404 -2299
F - G 1404 -2299
G - H 887 -1465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2562 -1677
N - M 2559 -1679
M - L 2172 -1376
Chords Tens.Comp.
L - K 2542 -1577
K - J 1528 -933
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 338 -431
D - L 454 -265
K - G 983 -599
Webs Tens.Comp.
G - J 738 -994
J - H 1848 -1119
H - I 814 -1266
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.193 E 999 360
VERT(CL):0.361 E 999 240
HORZ(LL):0.057 J - -
HORZ(TL):0.106 J - -
Creep Factor: 2.0
Max TC CSI:0.616
Max BC CSI:0.666
Max Web CSI:0.938
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T5
Ply: 1
Qty:1
SEQN:166338 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T3
DrwNo:116.21.0946.39237
AK /WHK 04/26/2021
35'2"
5'11"4
5'11"4
10'11"4
5'
17'2"9
6'3"5
23'0"10
5'10"1
28'10"11
5'10"1
35'2"
6'3"5
5'9"8
5'9"8
10'11"4
5'1"12
16'11"1
5'11"13
23'0"10
6'1"9
29'2"3
6'1"9
35'2"
5'11"131'
4"1 4'10"125'3"8(a)
9'5"A
B
C
D E F G H
IJKLMN
5
12
3X6(A1)1.5X4
3X4
5X8
3X4 5X5
3X4 5X5
3X8
3X4
5X8
4X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1388 /-/-/869 /800 /295
I 1315 /-/-/662 /796 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
I Brg Width = 3.5 Min Req =1.6
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1615 -2834
C - D 1430 -2404
D - E 1565 -2532
Chords Tens.Comp.
E - F 1404 -2299
F - G 1404 -2299
G - H 887 -1465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2562 -1677
N - M 2559 -1679
M - L 2172 -1376
Chords Tens.Comp.
L - K 2542 -1577
K - J 1528 -933
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 338 -431
D - L 454 -265
K - G 983 -599
Webs Tens.Comp.
G - J 738 -994
J - H 1848 -1119
H - I 814 -1266
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.193 E 999 360
VERT(CL):0.361 E 999 240
HORZ(LL):0.057 J - -
HORZ(TL):0.106 J - -
Creep Factor: 2.0
Max TC CSI:0.616
Max BC CSI:0.666
Max Web CSI:0.938
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T5
Ply: 1
Qty:1
SEQN:166338 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T3
DrwNo:116.21.0946.39237
AK /WHK 04/26/2021
35'2"
5'11"4
5'11"4
10'11"4
5'
17'2"9
6'3"5
23'0"10
5'10"1
28'10"11
5'10"1
35'2"
6'3"5
5'9"8
5'9"8
10'11"4
5'1"12
16'11"1
5'11"13
23'0"10
6'1"9
29'2"3
6'1"9
35'2"
5'11"131'
4"1 4'10"125'3"8(a)
9'5"A
B
C
D E F G H
IJKLMN
5
12
3X6(A1)1.5X4
3X4
5X8
3X4 5X5
3X4 5X5
3X8
3X4
5X8
4X6
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1388 /-/-/891 /792 /345
H 1315 /-/-/677 /803 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
H Brg Width = 3.5 Min Req =1.6
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1572 -2798
C - D 1325 -2243
D - E 1315 -2117
Chords Tens.Comp.
E - F 917 -1494
F - G 917 -1494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 2522 -1677
L - K 2519 -1678
Chords Tens.Comp.
K - J 2013 -1291
J - I 2113 -1319
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 430 -560
D - K 451 -134
E - I 504 -778
Webs Tens.Comp.
I - G 1849 -1135
F - I 438 -452
G - H 826 -1255
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.162 K 999 360
VERT(CL):0.302 K 999 240
HORZ(LL):0.054 I - -
HORZ(TL):0.101 I - -
Creep Factor: 2.0
Max TC CSI:0.868
Max BC CSI:0.757
Max Web CSI:0.869
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T6
Ply: 1
Qty:1
SEQN:166342 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T4
DrwNo:116.21.0946.41640
AK /WHK 04/26/2021
35'2"
6'11"4
6'11"4
12'11"4
6'
20'6"8
7'7"4
27'8"8
7'2"
35'2"
7'5"8
6'9"8
6'9"8
12'11"4
6'1"12
20'3"
7'3"12
27'8"8
7'5"8
35'2"
7'5"81'
4"1 5'8"126'1"8(a)(a)
9'5"A
B
C
D E F G
HIJKL
5
12
3X6(A1)1.5X4
3X4
5X8
5X5 3X4
5X5 1.5X4
6X8
4X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1388 /-/-/891 /792 /345
H 1315 /-/-/677 /803 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
H Brg Width = 3.5 Min Req =1.6
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1572 -2798
C - D 1325 -2243
D - E 1315 -2117
Chords Tens.Comp.
E - F 917 -1494
F - G 917 -1494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 2522 -1677
L - K 2519 -1678
Chords Tens.Comp.
K - J 2013 -1291
J - I 2113 -1319
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 430 -560
D - K 451 -134
E - I 504 -778
Webs Tens.Comp.
I - G 1849 -1135
F - I 438 -452
G - H 826 -1255
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.162 K 999 360
VERT(CL):0.302 K 999 240
HORZ(LL):0.054 I - -
HORZ(TL):0.101 I - -
Creep Factor: 2.0
Max TC CSI:0.868
Max BC CSI:0.757
Max Web CSI:0.869
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T6
Ply: 1
Qty:1
SEQN:166342 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T4
DrwNo:116.21.0946.41640
AK /WHK 04/26/2021
35'2"
6'11"4
6'11"4
12'11"4
6'
20'6"8
7'7"4
27'8"8
7'2"
35'2"
7'5"8
6'9"8
6'9"8
12'11"4
6'1"12
20'3"
7'3"12
27'8"8
7'5"8
35'2"
7'5"81'
4"1 5'8"126'1"8(a)(a)
9'5"A
B
C
D E F G
HIJKL
5
12
3X6(A1)1.5X4
3X4
5X8
5X5 3X4
5X5 1.5X4
6X8
4X6
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 441 /-/-/309 /138 /396
S 1269 /-/0 /808 /864 /0
J 993 /-/-/490 /591 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
S Brg Width = 3.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B, S, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -434
D - E 684 -1316
E - F 940 -1578
Chords Tens.Comp.
F - G 809 -1345
G - H 806 -1338
H - I 318 -538
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 383 -304
P - O 1157 -699
Chords Tens.Comp.
O - L 1593 -958
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 337 -384
S - R 776 -1066
R - D 800 -1029
D - P 1059 -647
E - O 514 -335
Webs Tens.Comp.
L - H 1174 -713
L - K 640 -377
H - K 741 -1097
K - I 1020 -603
I - J 603 -962
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.109 F 999 360
VERT(CL):0.197 F 999 240
HORZ(LL):0.066 K - -
HORZ(TL):0.123 K - -
Creep Factor: 2.0
Max TC CSI:0.498
Max BC CSI:0.947
Max Web CSI:0.756
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T7
Ply: 1
Qty:1
SEQN:166348 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T1
DrwNo:116.21.0946.44487
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"6
4'1"13
14'11"4
5'11"14
21'3"10
6'4"6
27'6"4
6'2"10
31'1"8
3'7"4
35'2"
4'0"8
9'0"6
9'0"6
14'11"4
5'10"14
21'0"2
6'0"14
27'4"8
6'4"6
31'3"4
3'10"12
35'2"
3'10"121'
4"1 6'6"122'6'11"89'5"A
B
C
D
E F G H I
JK
L
MN
OP
Q
R
S
5
12
3X4(A1)
1.5X4
6X6
3X33X4
5X8
3X5 5X5
3X4 5X5
6X81.5X4
3X5
4X7
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 441 /-/-/309 /138 /396
S 1269 /-/0 /808 /864 /0
J 993 /-/-/490 /591 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
S Brg Width = 3.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B, S, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -434
D - E 684 -1316
E - F 940 -1578
Chords Tens.Comp.
F - G 809 -1345
G - H 806 -1338
H - I 318 -538
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 383 -304
P - O 1157 -699
Chords Tens.Comp.
O - L 1593 -958
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 337 -384
S - R 776 -1066
R - D 800 -1029
D - P 1059 -647
E - O 514 -335
Webs Tens.Comp.
L - H 1174 -713
L - K 640 -377
H - K 741 -1097
K - I 1020 -603
I - J 603 -962
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.109 F 999 360
VERT(CL):0.197 F 999 240
HORZ(LL):0.066 K - -
HORZ(TL):0.123 K - -
Creep Factor: 2.0
Max TC CSI:0.498
Max BC CSI:0.947
Max Web CSI:0.756
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T7
Ply: 1
Qty:1
SEQN:166348 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T1
DrwNo:116.21.0946.44487
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"6
4'1"13
14'11"4
5'11"14
21'3"10
6'4"6
27'6"4
6'2"10
31'1"8
3'7"4
35'2"
4'0"8
9'0"6
9'0"6
14'11"4
5'10"14
21'0"2
6'0"14
27'4"8
6'4"6
31'3"4
3'10"12
35'2"
3'10"121'
4"1 6'6"122'6'11"89'5"A
B
C
D
E F G H I
JK
L
MN
OP
Q
R
S
5
12
3X4(A1)
1.5X4
6X6
3X33X4
5X8
3X5 5X5
3X4 5X5
6X81.5X4
3X5
4X7
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 458 /-/-/314 /134 /446
T 1246 /-/0 /825 /855 /0
K 999 /-/-/499 /580 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
T Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
Bearings B, T, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -465
E - F 721 -1298
F - G 813 -1328
Chords Tens.Comp.
G - H 683 -1119
H - I 681 -1115
I - J 287 -479
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 414 -350
S - Q 1072 -724
Chords Tens.Comp.
Q - P 1159 -711
P - M 1336 -824
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 354 -387
T - S 759 -1039
S - E 833 -1201
M - I 1042 -643
Webs Tens.Comp.
M - L 569 -341
I - L 732 -1066
L - J 989 -592
J - K 591 -967
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.093 Q 999 360
VERT(CL):0.174 Q 999 240
HORZ(LL):0.065 K - -
HORZ(TL):0.121 K - -
Creep Factor: 2.0
Max TC CSI:0.488
Max BC CSI:0.944
Max Web CSI:0.945
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T8
Ply: 1
Qty:1
SEQN:166352 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T7
DrwNo:116.21.0946.49823
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"3
4'9"3
8'9"10
4'0"7
12'11"5
4'1"11
16'11"4
3'11"15
22'3"10
5'4"6
27'6"4
5'2"10
31'1"8
3'7"4
35'2"
4'0"8
9'0"6
9'0"6
16'11"4
7'10"14
22'0"2
5'0"14
27'4"8
5'4"6
31'3"4
3'10"12
35'2"
3'10"121'
4"1 7'4"122'7'9"89'5"A
B
C
D
E
F G H I J
KL
M
NO
PQ
R
S
T
5
12
3X4(A1)
5X5
6X6
1.5X45X5
3X4
5X8
5X5 3X4
3X4 5X5
6X81.5X4
3X5
4X7
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 458 /-/-/314 /134 /446
T 1246 /-/0 /825 /855 /0
K 999 /-/-/499 /580 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
T Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
Bearings B, T, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -465
E - F 721 -1298
F - G 813 -1328
Chords Tens.Comp.
G - H 683 -1119
H - I 681 -1115
I - J 287 -479
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 414 -350
S - Q 1072 -724
Chords Tens.Comp.
Q - P 1159 -711
P - M 1336 -824
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 354 -387
T - S 759 -1039
S - E 833 -1201
M - I 1042 -643
Webs Tens.Comp.
M - L 569 -341
I - L 732 -1066
L - J 989 -592
J - K 591 -967
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.093 Q 999 360
VERT(CL):0.174 Q 999 240
HORZ(LL):0.065 K - -
HORZ(TL):0.121 K - -
Creep Factor: 2.0
Max TC CSI:0.488
Max BC CSI:0.944
Max Web CSI:0.945
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T8
Ply: 1
Qty:1
SEQN:166352 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T7
DrwNo:116.21.0946.49823
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"3
4'9"3
8'9"10
4'0"7
12'11"5
4'1"11
16'11"4
3'11"15
22'3"10
5'4"6
27'6"4
5'2"10
31'1"8
3'7"4
35'2"
4'0"8
9'0"6
9'0"6
16'11"4
7'10"14
22'0"2
5'0"14
27'4"8
5'4"6
31'3"4
3'10"12
35'2"
3'10"121'
4"1 7'4"122'7'9"89'5"A
B
C
D
E
F G H I J
KL
M
NO
PQ
R
S
T
5
12
3X4(A1)
5X5
6X6
1.5X45X5
3X4
5X8
5X5 3X4
3X4 5X5
6X81.5X4
3X5
4X7
3X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 447 /-/-/294 /127 /437
U 1261 /-/0 /864 /866 /0
K 995 /-/-/481 /592 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
U Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
Bearings B, U, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -441
D - E 622 -1265
E - F 718 -1219
Chords Tens.Comp.
F - G 726 -1113
G - H 637 -956
H - I 636 -953
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 392 -326
R - Q 1134 -713
Chords Tens.Comp.
Q - P 1073 -652
P - M 1115 -671
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 359 -391
U - T 769 -1050
T - D 787 -1023
D - R 1037 -654
Webs Tens.Comp.
M - I 990 -609
L - I 589 -841
L - J 873 -509
J - K 594 -984
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 E 999 360
VERT(CL):0.165 E 999 240
HORZ(LL):0.057 L - -
HORZ(TL):0.107 L - -
Creep Factor: 2.0
Max TC CSI:0.491
Max BC CSI:0.946
Max Web CSI:0.934
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T9
Ply: 1
Qty:1
SEQN:166356 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T5
DrwNo:116.21.0946.54487
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"
4'1"7
14'1"1
5'2"1
18'11"4
4'10"3
23'5"6
4'6"2
27'6"4
4'0"14
32'8"12
5'2"8
35'2"
2'5"4
9'0"6
9'0"6
13'9"9
4'9"3
18'11"4
5'1"11
23'1"14
4'2"10
27'4"8
4'2"10
32'7"
5'2"8
35'2"
2'7"1'
4"1 7'2"92'8'2"128'7"89'5"A
B
C
D
E
F G H I
J
KL
M
NO
PQR
S
T
U
5
12
3X4(A1)
1.5X4
6X6
3X35X5
3X4
3X4
5X8
5X5 3X4
3X4 1.5X4
5X81.5X4 3X8
5X8
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 447 /-/-/294 /127 /437
U 1261 /-/0 /864 /866 /0
K 995 /-/-/481 /592 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
U Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
Bearings B, U, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -441
D - E 622 -1265
E - F 718 -1219
Chords Tens.Comp.
F - G 726 -1113
G - H 637 -956
H - I 636 -953
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 392 -326
R - Q 1134 -713
Chords Tens.Comp.
Q - P 1073 -652
P - M 1115 -671
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 359 -391
U - T 769 -1050
T - D 787 -1023
D - R 1037 -654
Webs Tens.Comp.
M - I 990 -609
L - I 589 -841
L - J 873 -509
J - K 594 -984
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 E 999 360
VERT(CL):0.165 E 999 240
HORZ(LL):0.057 L - -
HORZ(TL):0.107 L - -
Creep Factor: 2.0
Max TC CSI:0.491
Max BC CSI:0.946
Max Web CSI:0.934
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T9
Ply: 1
Qty:1
SEQN:166356 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T5
DrwNo:116.21.0946.54487
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"
4'1"7
14'1"1
5'2"1
18'11"4
4'10"3
23'5"6
4'6"2
27'6"4
4'0"14
32'8"12
5'2"8
35'2"
2'5"4
9'0"6
9'0"6
13'9"9
4'9"3
18'11"4
5'1"11
23'1"14
4'2"10
27'4"8
4'2"10
32'7"
5'2"8
35'2"
2'7"1'
4"1 7'2"92'8'2"128'7"89'5"A
B
C
D
E
F G H I
J
KL
M
NO
PQR
S
T
U
5
12
3X4(A1)
1.5X4
6X6
3X35X5
3X4
3X4
5X8
5X5 3X4
3X4 1.5X4
5X81.5X4 3X8
5X8
3X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 414 /-/-/256 /107 /437
AA 1309 /-/1 /921 /892 /0
L 983 /-/-/477 /584 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
AA Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings B, AA, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 32 -388
D - E 898 -1707
E - F 1014 -1789
F - G 833 -1358
Chords Tens.Comp.
G - H 787 -1148
H - I 784 -1143
I - J 582 -808
J - K 331 -514
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -U 1564 -980
U - T 1563 -977
Chords Tens.Comp.
T - Q 1201 -712
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AA 375 -402
AA- Z 793 -1104
Z - D 743 -1032
D - W 1625 -1047
F - T 316 -431
Q - I 970 -584
Q - N 984 -572
Webs Tens.Comp.
I - N 640 -1012
N - M 508 -291
N - J 870 -518
M - J 585 -855
M - K 792 -456
K - L 599 -946
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.123 U 999 360
VERT(CL):0.219 U 999 240
HORZ(LL):0.088 M - -
HORZ(TL):0.165 M - -
Creep Factor: 2.0
Max TC CSI:0.519
Max BC CSI:0.986
Max Web CSI:0.819
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T10
Ply: 1
Qty:1
SEQN:166360 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T41
DrwNo:116.21.0946.57463
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"
4'1"7
10'7"2
1'8"2
15'10"1
5'2"15
20'11"4
5'1"3
25'6"12
4'7"8
27'4"8
1'9"12
30'8"12
3'4"4
35'2"
4'5"4
9'0"6
9'0"6
11'0"6
2'
15'10"1
4'9"11
20'11"4
5'1"3
25'5"
4'5"12
27'4"8
1'11"8
30'7"
3'2"8
35'2"
4'7"1'
4"1 7'2"92'3'4"9'0"129'5"8(a)
9'5"A
B
C
D
E
F
G H I J
K
LM
N
OP
Q
RS
TU
VWX
Y
Z
AA
5 12
3X4(A1)6X6
5X55X6
6X8
3X8
5X8
3X4
6X8
4X4
6X8 3X8
5X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 414 /-/-/256 /107 /437
AA 1309 /-/1 /921 /892 /0
L 983 /-/-/477 /584 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
AA Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings B, AA, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 32 -388
D - E 898 -1707
E - F 1014 -1789
F - G 833 -1358
Chords Tens.Comp.
G - H 787 -1148
H - I 784 -1143
I - J 582 -808
J - K 331 -514
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -U 1564 -980
U - T 1563 -977
Chords Tens.Comp.
T - Q 1201 -712
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AA 375 -402
AA- Z 793 -1104
Z - D 743 -1032
D - W 1625 -1047
F - T 316 -431
Q - I 970 -584
Q - N 984 -572
Webs Tens.Comp.
I - N 640 -1012
N - M 508 -291
N - J 870 -518
M - J 585 -855
M - K 792 -456
K - L 599 -946
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.123 U 999 360
VERT(CL):0.219 U 999 240
HORZ(LL):0.088 M - -
HORZ(TL):0.165 M - -
Creep Factor: 2.0
Max TC CSI:0.519
Max BC CSI:0.986
Max Web CSI:0.819
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T10
Ply: 1
Qty:1
SEQN:166360 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T41
DrwNo:116.21.0946.57463
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"
4'1"7
10'7"2
1'8"2
15'10"1
5'2"15
20'11"4
5'1"3
25'6"12
4'7"8
27'4"8
1'9"12
30'8"12
3'4"4
35'2"
4'5"4
9'0"6
9'0"6
11'0"6
2'
15'10"1
4'9"11
20'11"4
5'1"3
25'5"
4'5"12
27'4"8
1'11"8
30'7"
3'2"8
35'2"
4'7"1'
4"1 7'2"92'3'4"9'0"129'5"8(a)
9'5"A
B
C
D
E
F
G H I J
K
LM
N
OP
Q
RS
TU
VWX
Y
Z
AA
5 12
3X4(A1)6X6
5X55X6
6X8
3X8
5X8
3X4
6X8
4X4
6X8 3X8
5X8
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 430 /-/-/269 /119 /437
W 1283 /-/0 /903 /876 /0
K 990 /-/-/481 /588 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
W Brg Width = 3.5 Min Req =1.5
K Brg Width = -Min Req =-
Bearings B & W are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 18 -414
D - E 700 -1407
E - F 811 -1476
F - G 798 -1300
Chords Tens.Comp.
G - H 758 -1094
H - I 757 -1091
I - J 415 -662
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - Q 1454 -911
Q - P 1454 -909
Chords Tens.Comp.
P - M 1147 -680
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 381 -411
W -V 772 -1069
V - D 774 -1075
D - S 1323 -852
F - P 281 -377
Webs Tens.Comp.
M - L 555 -317
M - I 781 -481
L - I 472 -624
L - J 843 -484
J - K 601 -955
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.102 Q 999 360
VERT(CL):0.191 Q 999 240
HORZ(LL):0.054 L - -
HORZ(TL):0.100 L - -
Creep Factor: 2.0
Max TC CSI:0.502
Max BC CSI:0.967
Max Web CSI:0.502
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T11
Ply: 1
Qty:1
SEQN:166364 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T8
DrwNo:116.21.0947.00517
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"
4'1"7
10'7"2
1'8"2
15'10"1
5'2"15
20'11"4
5'1"3
25'6"12
4'7"8
30'8"12
5'2"
35'2"
4'5"4
9'0"6
9'0"6
11'0"6
2'
15'10"1
4'9"11
20'11"4
5'1"3
25'5"
4'5"12
30'7"
5'2"
35'2"
4'7"1'
4"1 2'5'2"93'9'0"129'5"89'5"
11'5"
A
B
C
D
E
F
G H I
J
KL
MNOPQ
RST
U
V
W
5
12
3X4(A1)6X6
5X55X5
6X8
3X8
5X8
3X4
5X8 3X8
5X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 430 /-/-/269 /119 /437
W 1283 /-/0 /903 /876 /0
K 990 /-/-/481 /588 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
W Brg Width = 3.5 Min Req =1.5
K Brg Width = -Min Req =-
Bearings B & W are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 18 -414
D - E 700 -1407
E - F 811 -1476
F - G 798 -1300
Chords Tens.Comp.
G - H 758 -1094
H - I 757 -1091
I - J 415 -662
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - Q 1454 -911
Q - P 1454 -909
Chords Tens.Comp.
P - M 1147 -680
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 381 -411
W -V 772 -1069
V - D 774 -1075
D - S 1323 -852
F - P 281 -377
Webs Tens.Comp.
M - L 555 -317
M - I 781 -481
L - I 472 -624
L - J 843 -484
J - K 601 -955
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.102 Q 999 360
VERT(CL):0.191 Q 999 240
HORZ(LL):0.054 L - -
HORZ(TL):0.100 L - -
Creep Factor: 2.0
Max TC CSI:0.502
Max BC CSI:0.967
Max Web CSI:0.502
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T11
Ply: 1
Qty:1
SEQN:166364 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T8
DrwNo:116.21.0947.00517
AK /WHK 04/26/2021
8'10"10 26'3"6
4'9"9
4'9"9
8'11"
4'1"7
10'7"2
1'8"2
15'10"1
5'2"15
20'11"4
5'1"3
25'6"12
4'7"8
30'8"12
5'2"
35'2"
4'5"4
9'0"6
9'0"6
11'0"6
2'
15'10"1
4'9"11
20'11"4
5'1"3
25'5"
4'5"12
30'7"
5'2"
35'2"
4'7"1'
4"1 2'5'2"93'9'0"129'5"89'5"
11'5"
A
B
C
D
E
F
G H I
J
KL
MNOPQ
RST
U
V
W
5
12
3X4(A1)6X6
5X55X5
6X8
3X8
5X8
3X4
5X8 3X8
5X8
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 37.17
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 37.17
TC: 26 lb Conc. Load at 1.64
BC: 24 lb Conc. Load at 1.64
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 478 /-/-/-/284 /-
Y 1476 /-/0 /-/867 /-
N 976 /-/-/-/569 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Y Brg Width = 7.6 Min Req =1.7
N Brg Width = -Min Req =-
Bearings B & Y are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 389 -714
C - D 482 -1149
D - E 630 -1407
F - G 713 -1238
G - H 897 -1528
Chords Tens.Comp.
H - I 612 -981
I - J 479 -826
J - K 474 -819
K - L 465 -797
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 639 -341
AA- Z 633 -341
U - S 1186 -681
Chords Tens.Comp.
S - P 1344 -774
O - N 515 -323
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 553 -152
Z - D 366 -642
Z - E 1110 -435
E - Y 326 -469
Y - X 734 -1175
X - F 654 -1032
F - U 1357 -809
Webs Tens.Comp.
U - G 337 -413
H - P 322 -586
P - O 1029 -537
P - K 898 -633
O - K 615 -769
L - N 609 -970
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.060 H 999 360
VERT(CL):0.114 H 999 240
HORZ(LL):-0.034 V - -
HORZ(TL):0.064 V - -
Creep Factor: 2.0
Max TC CSI:0.620
Max BC CSI:0.879
Max Web CSI:0.643
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T12
Ply: 1
Qty:1
SEQN:166368 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T24
DrwNo:116.21.0947.03800
AK /WHK 04/26/2021
10'7"13 26'6"3
1'7"4
1'7"4
3'7"4
2'
7'1"9
3'6"5
10'11"6
3'9"13
12'8"8
1'9"2
19'11"13
7'3"5
26'11"4
6'11"7
28'8"12
1'9"8
32'11"6
4'2"10
37'2"
4'2"10
11'0"6
11'0"6
13'0"6
2'
19'8"5
6'7"15
27'5"
7'8"11
28'7"
1'2"
37'2"
8'7"1'
4"1 2'5'2"91'0"13'10'8"1211'1"8(a)
(a)
(a)
9'5"
11'5"
A
B
C D
E
F
G
H
I J K
L
M
NO
PQRS
TUV
W
X
YZAA
5 12
3X4(A1)
5X8
4X7
5X5
3X4
6X6
5X53X5
6X8
5X5
3X4
3X4
5X5
5X144X7
5X8
3X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 37.17
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 37.17
TC: 26 lb Conc. Load at 1.64
BC: 24 lb Conc. Load at 1.64
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 478 /-/-/-/284 /-
Y 1476 /-/0 /-/867 /-
N 976 /-/-/-/569 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Y Brg Width = 7.6 Min Req =1.7
N Brg Width = -Min Req =-
Bearings B & Y are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 389 -714
C - D 482 -1149
D - E 630 -1407
F - G 713 -1238
G - H 897 -1528
Chords Tens.Comp.
H - I 612 -981
I - J 479 -826
J - K 474 -819
K - L 465 -797
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 639 -341
AA- Z 633 -341
U - S 1186 -681
Chords Tens.Comp.
S - P 1344 -774
O - N 515 -323
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 553 -152
Z - D 366 -642
Z - E 1110 -435
E - Y 326 -469
Y - X 734 -1175
X - F 654 -1032
F - U 1357 -809
Webs Tens.Comp.
U - G 337 -413
H - P 322 -586
P - O 1029 -537
P - K 898 -633
O - K 615 -769
L - N 609 -970
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.060 H 999 360
VERT(CL):0.114 H 999 240
HORZ(LL):-0.034 V - -
HORZ(TL):0.064 V - -
Creep Factor: 2.0
Max TC CSI:0.620
Max BC CSI:0.879
Max Web CSI:0.643
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T12
Ply: 1
Qty:1
SEQN:166368 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T24
DrwNo:116.21.0947.03800
AK /WHK 04/26/2021
10'7"13 26'6"3
1'7"4
1'7"4
3'7"4
2'
7'1"9
3'6"5
10'11"6
3'9"13
12'8"8
1'9"2
19'11"13
7'3"5
26'11"4
6'11"7
28'8"12
1'9"8
32'11"6
4'2"10
37'2"
4'2"10
11'0"6
11'0"6
13'0"6
2'
19'8"5
6'7"15
27'5"
7'8"11
28'7"
1'2"
37'2"
8'7"1'
4"1 2'5'2"91'0"13'10'8"1211'1"8(a)
(a)
(a)
9'5"
11'5"
A
B
C D
E
F
G
H
I J K
L
M
NO
PQRS
TUV
W
X
YZAA
5 12
3X4(A1)
5X8
4X7
5X5
3X4
6X6
5X53X5
6X8
5X5
3X4
3X4
5X5
5X144X7
5X8
3X4
6X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 434 /-/-/447 /333 /461
X 1470 /-/0 /1207 /903 /0
M 977 /-/-/477 /575 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
X Brg Width = 7.6 Min Req =1.7
M Brg Width = -Min Req =-
Bearings B & X are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 487 -585
C - D 579 -595
D - E 371 -428
E - F 605 -1245
F - G 826 -1529
Chords Tens.Comp.
G - H 645 -981
H - I 654 -827
I - J 650 -819
J - K 565 -798
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 614 -429
Z - Y 620 -432
Y - X 673 -528
Chords Tens.Comp.
T - R 1189 -756
R - O 1345 -823
N - M 515 -318
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - X 536 -749
X - W 875 -1226
W -E 812 -1102
E - T 1349 -859
T - F 330 -397
Webs Tens.Comp.
G - O 421 -587
O - N 1029 -493
O - J 898 -600
N - J 524 -770
K - M 599 -970
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.061 G 999 360
VERT(CL):0.115 G 999 240
HORZ(LL):-0.037 M - -
HORZ(TL):0.062 M - -
Creep Factor: 2.0
Max TC CSI:0.596
Max BC CSI:0.879
Max Web CSI:0.609
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T13
Ply: 1
Qty:1
SEQN:166372 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T31
DrwNo:116.21.0947.12133
AK /WHK 04/26/2021
10'7"13 26'6"3
3'7"4
3'7"4
5'7"4
2'
10'11"6
5'4"2
12'8"8
1'9"2
19'11"13
7'3"5
26'11"4
6'11"7
28'8"12
1'9"8
32'11"6
4'2"10
37'2"
4'2"10
3'9"
3'9"
5'3"12
1'6"12
11'0"6
5'8"10
13'0"6
2'
19'8"5
6'7"15
27'5"
7'8"11
28'7"
1'2"
37'2"
8'7"1'
4"1 2'5'2"91'10"13'10'8"1211'1"8(a)
(a)
(a)
9'5"
11'5"
A
B
C D
E
F
G
H I J
K
L
MN
O
P
QR
STU
V
W
XYZ
5
12
3X4(A1)
5X8
3X4
5X5
6X6
5X53X5
6X8
5X5
3X4
3X4
5X5
5X144X7
5X8
3X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 434 /-/-/447 /333 /461
X 1470 /-/0 /1207 /903 /0
M 977 /-/-/477 /575 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
X Brg Width = 7.6 Min Req =1.7
M Brg Width = -Min Req =-
Bearings B & X are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 487 -585
C - D 579 -595
D - E 371 -428
E - F 605 -1245
F - G 826 -1529
Chords Tens.Comp.
G - H 645 -981
H - I 654 -827
I - J 650 -819
J - K 565 -798
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 614 -429
Z - Y 620 -432
Y - X 673 -528
Chords Tens.Comp.
T - R 1189 -756
R - O 1345 -823
N - M 515 -318
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - X 536 -749
X - W 875 -1226
W -E 812 -1102
E - T 1349 -859
T - F 330 -397
Webs Tens.Comp.
G - O 421 -587
O - N 1029 -493
O - J 898 -600
N - J 524 -770
K - M 599 -970
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.061 G 999 360
VERT(CL):0.115 G 999 240
HORZ(LL):-0.037 M - -
HORZ(TL):0.062 M - -
Creep Factor: 2.0
Max TC CSI:0.596
Max BC CSI:0.879
Max Web CSI:0.609
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T13
Ply: 1
Qty:1
SEQN:166372 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T31
DrwNo:116.21.0947.12133
AK /WHK 04/26/2021
10'7"13 26'6"3
3'7"4
3'7"4
5'7"4
2'
10'11"6
5'4"2
12'8"8
1'9"2
19'11"13
7'3"5
26'11"4
6'11"7
28'8"12
1'9"8
32'11"6
4'2"10
37'2"
4'2"10
3'9"
3'9"
5'3"12
1'6"12
11'0"6
5'8"10
13'0"6
2'
19'8"5
6'7"15
27'5"
7'8"11
28'7"
1'2"
37'2"
8'7"1'
4"1 2'5'2"91'10"13'10'8"1211'1"8(a)
(a)
(a)
9'5"
11'5"
A
B
C D
E
F
G
H I J
K
L
MN
O
P
QR
STU
V
W
XYZ
5
12
3X4(A1)
5X8
3X4
5X5
6X6
5X53X5
6X8
5X5
3X4
3X4
5X5
5X144X7
5X8
3X4
6X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 442 /-/-/247 /137 /435
X 1458 /-/0 /1023 /949 /0
L 978 /-/-/475 /580 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
X Brg Width = 7.6 Min Req =1.7
L Brg Width = -Min Req =-
Bearings B & X are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 55 -510
E - F 629 -1238
F - G 852 -1544
G - H 721 -1134
Chords Tens.Comp.
H - I 679 -917
I - J 678 -914
J - K 491 -779
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 425 -318
Z - Y 432 -318
T - R 1175 -784
Chords Tens.Comp.
R - Q 1366 -857
Q - N 983 -565
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - X 260 -436
X - W 809 -1168
W -E 751 -1052
E - T 1323 -878
T - F 323 -382
G - Q 356 -465
Webs Tens.Comp.
N - M 684 -380
N - J 591 -342
M - J 469 -606
M - K 830 -467
K - L 602 -924
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 G 999 360
VERT(CL):0.103 G 999 240
HORZ(LL):-0.023 M - -
HORZ(TL):0.037 M - -
Creep Factor: 2.0
Max TC CSI:0.578
Max BC CSI:0.509
Max Web CSI:0.617
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T14
Ply: 1
Qty:1
SEQN:166376 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T27
DrwNo:116.21.0947.19423
AK /WHK 04/26/2021
10'7"13 26'6"3
5'7"4
5'7"4
7'7"4
2'
10'11"6
3'4"2
12'8"8
1'9"2
18'11"13
6'3"5
24'11"4
5'11"7
27'6"12
2'7"8
30'8"12
3'2"
37'2"
6'5"4
5'9"
5'9"
7'3"12
1'6"12
11'0"6
3'8"10
13'0"6
2'
18'8"5
5'7"15
24'11"4
6'2"15
27'5"
2'5"12
30'7"
3'2"
37'2"
6'7"1'
4"1 2'5'2"92'8"13'9'10"1210'3"89'5"
11'5"
A
B
C D
E
F
G
H I J
K
LM
NOPQR
STU
V
W
XYZ
5 12
3X4(A1)1.5X4 3X4
5X5
6X6
5X53X5
6X81.5X4
5X5
3X4
3X4
3X4
1.5X4
1.5X4 3X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 442 /-/-/247 /137 /435
X 1458 /-/0 /1023 /949 /0
L 978 /-/-/475 /580 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
X Brg Width = 7.6 Min Req =1.7
L Brg Width = -Min Req =-
Bearings B & X are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 55 -510
E - F 629 -1238
F - G 852 -1544
G - H 721 -1134
Chords Tens.Comp.
H - I 679 -917
I - J 678 -914
J - K 491 -779
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 425 -318
Z - Y 432 -318
T - R 1175 -784
Chords Tens.Comp.
R - Q 1366 -857
Q - N 983 -565
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - X 260 -436
X - W 809 -1168
W -E 751 -1052
E - T 1323 -878
T - F 323 -382
G - Q 356 -465
Webs Tens.Comp.
N - M 684 -380
N - J 591 -342
M - J 469 -606
M - K 830 -467
K - L 602 -924
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 G 999 360
VERT(CL):0.103 G 999 240
HORZ(LL):-0.023 M - -
HORZ(TL):0.037 M - -
Creep Factor: 2.0
Max TC CSI:0.578
Max BC CSI:0.509
Max Web CSI:0.617
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T14
Ply: 1
Qty:1
SEQN:166376 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T27
DrwNo:116.21.0947.19423
AK /WHK 04/26/2021
10'7"13 26'6"3
5'7"4
5'7"4
7'7"4
2'
10'11"6
3'4"2
12'8"8
1'9"2
18'11"13
6'3"5
24'11"4
5'11"7
27'6"12
2'7"8
30'8"12
3'2"
37'2"
6'5"4
5'9"
5'9"
7'3"12
1'6"12
11'0"6
3'8"10
13'0"6
2'
18'8"5
5'7"15
24'11"4
6'2"15
27'5"
2'5"12
30'7"
3'2"
37'2"
6'7"1'
4"1 2'5'2"92'8"13'9'10"1210'3"89'5"
11'5"
A
B
C D
E
F
G
H I J
K
LM
NOPQR
STU
V
W
XYZ
5 12
3X4(A1)1.5X4 3X4
5X5
6X6
5X53X5
6X81.5X4
5X5
3X4
3X4
3X4
1.5X4
1.5X4 3X8
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 447 /-/-/492 /300 /435
X 1452 /-/-/1152 /885 /-
L 978 /-/-/473 /584 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
X Brg Width = 7.6 Min Req =1.7
L Brg Width = -Min Req =-
Bearings B & X are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 282 -409
E - F 641 -1227
F - G 865 -1548
G - H 788 -1267
Chords Tens.Comp.
H - I 751 -1075
I - J 750 -1072
J - K 412 -653
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 387 -254
Z - Y 414 -270
T - R 1157 -796
Chords Tens.Comp.
R - Q 1382 -883
Q - N 1118 -668
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 609 -365
C - Y 397 -720
Y - D 501 -318
X - W 757 -1134
W -E 707 -1027
E - T 1297 -879
Webs Tens.Comp.
N - M 548 -314
N - J 764 -475
M - J 469 -614
M - K 832 -480
K - L 597 -944
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 Q 999 360
VERT(CL):0.104 Q 999 240
HORZ(LL):-0.026 M - -
HORZ(TL):0.042 M - -
Creep Factor: 2.0
Max TC CSI:0.554
Max BC CSI:0.633
Max Web CSI:0.494
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T15
Ply: 1
Qty:1
SEQN:166379 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T37
DrwNo:116.21.0947.23330
AK /WHK 04/26/2021
10'7"13 26'6"3
7'7"4
7'7"4
9'7"4
2'
10'11"6
1'4"2
12'8"14
1'9"8
17'11"13
5'2"15
22'11"4
4'11"7
27'6"12
4'7"8
32'8"12
5'2"
37'2"
4'5"4
7'9"
7'9"
9'3"12
1'6"12
11'0"6
1'8"10
13'0"6
2'
17'8"5
4'7"15
22'11"4
5'2"15
27'5"
4'5"12
32'7"
5'2"
37'2"
4'7"1'
4"1 2'5'2"93'6"13'9'0"129'5"89'5"
11'5"
A
B
C D
E
F
G
H I J
K
LM
NOPQR
STU
V
W
XYZ
5 12
3X4(A1)
5X8
2X4
5X5
6X6
5X53X5
6X81.5X4
5X8 1.5X4
5X81.5X4 3X8
5X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 447 /-/-/492 /300 /435
X 1452 /-/-/1152 /885 /-
L 978 /-/-/473 /584 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
X Brg Width = 7.6 Min Req =1.7
L Brg Width = -Min Req =-
Bearings B & X are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 282 -409
E - F 641 -1227
F - G 865 -1548
G - H 788 -1267
Chords Tens.Comp.
H - I 751 -1075
I - J 750 -1072
J - K 412 -653
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 387 -254
Z - Y 414 -270
T - R 1157 -796
Chords Tens.Comp.
R - Q 1382 -883
Q - N 1118 -668
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 609 -365
C - Y 397 -720
Y - D 501 -318
X - W 757 -1134
W -E 707 -1027
E - T 1297 -879
Webs Tens.Comp.
N - M 548 -314
N - J 764 -475
M - J 469 -614
M - K 832 -480
K - L 597 -944
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 Q 999 360
VERT(CL):0.104 Q 999 240
HORZ(LL):-0.026 M - -
HORZ(TL):0.042 M - -
Creep Factor: 2.0
Max TC CSI:0.554
Max BC CSI:0.633
Max Web CSI:0.494
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T15
Ply: 1
Qty:1
SEQN:166379 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T37
DrwNo:116.21.0947.23330
AK /WHK 04/26/2021
10'7"13 26'6"3
7'7"4
7'7"4
9'7"4
2'
10'11"6
1'4"2
12'8"14
1'9"8
17'11"13
5'2"15
22'11"4
4'11"7
27'6"12
4'7"8
32'8"12
5'2"
37'2"
4'5"4
7'9"
7'9"
9'3"12
1'6"12
11'0"6
1'8"10
13'0"6
2'
17'8"5
4'7"15
22'11"4
5'2"15
27'5"
4'5"12
32'7"
5'2"
37'2"
4'7"1'
4"1 2'5'2"93'6"13'9'0"129'5"89'5"
11'5"
A
B
C D
E
F
G
H I J
K
LM
NOPQR
STU
V
W
XYZ
5 12
3X4(A1)
5X8
2X4
5X5
6X6
5X53X5
6X81.5X4
5X8 1.5X4
5X81.5X4 3X8
5X8
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 444 /-/-/510 /283 /435
Y 1456 /-/-/1128 /897 /0
M 978 /-/-/470 /582 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Y Brg Width = 7.6 Min Req =1.7
M Brg Width = -Min Req =-
Bearings B & Y are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 194 -502
F - G 552 -1179
G - H 656 -1264
H - I 824 -1406
Chords Tens.Comp.
I - J 852 -1291
J - K 849 -1286
K - L 277 -459
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 466 -322
T - R 1391 -917
Chords Tens.Comp.
R - O 1261 -750
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 388 -406
D - Z 1003 -592
D - Y 545 -918
Y - X 667 -1132
X - F 492 -866
F - T 1176 -768
Webs Tens.Comp.
J - O 399 -415
O - K 1062 -673
N - K 553 -722
N - L 902 -521
L - M 579 -984
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.065 Q 999 360
VERT(CL):0.117 J 999 240
HORZ(LL):-0.023 V - -
HORZ(TL):0.043 V - -
Creep Factor: 2.0
Max TC CSI:0.542
Max BC CSI:0.929
Max Web CSI:0.849
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T16
Ply: 1
Qty:1
SEQN:166382 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T18
DrwNo:116.21.0947.29803
AK /WHK 04/26/2021
10'7"13 26'6"3
5'1"8
5'1"8
9'7"4
4'5"12
11'7"4
2'
16'10"1
5'2"13
20'11"4
4'1"3
27'6"12
6'7"8
34'8"12
7'2"
37'2"
2'5"4
9'7"4
9'7"4
11'0"6
1'5"2
11'7"4
6"14
13'0"6
1'5"2
20'11"4
7'10"14
27'5"
6'5"12
34'7"
7'2"
37'2"
2'7"1'
4"1 2'5'2"94'4"13'8'2"128'7"89'5"
11'5"
A
B
C
D E F G
H
I J K
L
MN
OPQR
STUV
W
X
YZ
5
12
3X4(A1)
5X8
3X4 6X6
5X55X10(SRS)
3X4
7X8
3X4
5X8
3X4
5X8 3X8
5X8
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 444 /-/-/510 /283 /435
Y 1456 /-/-/1128 /897 /0
M 978 /-/-/470 /582 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Y Brg Width = 7.6 Min Req =1.7
M Brg Width = -Min Req =-
Bearings B & Y are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 194 -502
F - G 552 -1179
G - H 656 -1264
H - I 824 -1406
Chords Tens.Comp.
I - J 852 -1291
J - K 849 -1286
K - L 277 -459
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 466 -322
T - R 1391 -917
Chords Tens.Comp.
R - O 1261 -750
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 388 -406
D - Z 1003 -592
D - Y 545 -918
Y - X 667 -1132
X - F 492 -866
F - T 1176 -768
Webs Tens.Comp.
J - O 399 -415
O - K 1062 -673
N - K 553 -722
N - L 902 -521
L - M 579 -984
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.065 Q 999 360
VERT(CL):0.117 J 999 240
HORZ(LL):-0.023 V - -
HORZ(TL):0.043 V - -
Creep Factor: 2.0
Max TC CSI:0.542
Max BC CSI:0.929
Max Web CSI:0.849
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T16
Ply: 1
Qty:1
SEQN:166382 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T18
DrwNo:116.21.0947.29803
AK /WHK 04/26/2021
10'7"13 26'6"3
5'1"8
5'1"8
9'7"4
4'5"12
11'7"4
2'
16'10"1
5'2"13
20'11"4
4'1"3
27'6"12
6'7"8
34'8"12
7'2"
37'2"
2'5"4
9'7"4
9'7"4
11'0"6
1'5"2
11'7"4
6"14
13'0"6
1'5"2
20'11"4
7'10"14
27'5"
6'5"12
34'7"
7'2"
37'2"
2'7"1'
4"1 2'5'2"94'4"13'8'2"128'7"89'5"
11'5"
A
B
C
D E F G
H
I J K
L
MN
OPQR
STUV
W
X
YZ
5
12
3X4(A1)
5X8
3X4 6X6
5X55X10(SRS)
3X4
7X8
3X4
5X8
3X4
5X8 3X8
5X8
3X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 432 /-/-/289 /109 /445
Z 1483 /-/0 /956 /989 /0
M 969 /-/-/476 /557 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Z Brg Width = 7.6 Min Req =1.8
M Brg Width = -Min Req =-
Bearings B & Z are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -492
E - F 270 -725
F - G 281 -753
G - H 793 -1480
Chords Tens.Comp.
H - I 920 -1536
I - J 902 -1499
J - K 897 -1491
K - L 465 -783
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 409 -263
AA- Z 405 -264
U - S 1280 -776
Chords Tens.Comp.
S - R 1316 -792
R - O 1551 -934
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 395 -533
Z - Y 835 -1205
Y - D 813 -1164
D - W 785 -415
E - W 463 -856
E - U 1207 -683
Webs Tens.Comp.
U - G 666 -973
O - K 901 -547
O - N 799 -477
K - N 647 -893
N - L 1122 -665
L - M 571 -930
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.077 I 999 360
VERT(CL):0.145 I 999 240
HORZ(LL):-0.028 W --
HORZ(TL):0.052 W --
Creep Factor: 2.0
Max TC CSI:0.351
Max BC CSI:0.504
Max Web CSI:0.542
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T17
Ply: 1
Qty:1
SEQN:166386 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T25
DrwNo:116.21.0947.34903
AK /WHK 04/26/2021
10'7"13 26'6"3
5'11"5
5'11"5
11'7"4
5'7"15
12'7"2
11"14
13'7"4
1'0"2
18'11"4
5'4"
23'5"10
4'6"6
27'6"12
4'1"2
32'1"12
4'7"
37'2"
5'0"4
5'9"9
5'9"9
11'0"6
5'2"13
11'9"
8"10
13'0"6
1'3"6
18'11"4
5'10"14
23'2"2
4'2"14
27'5"
4'2"14
32'3"8
4'10"8
37'2"
4'10"81'
4"1 2'5'4"125'2"13'7'4"127'9"89'5"
11'5"
A
B
C
D E F G
H I J K L
MN
OPQRS
TUVW
X
Y
ZAA
5 12
3X4(A1)1.5X4
6X6
3X3
3X55X8
3X8
1.5X4
10X101.5X4
5X5
5X8 5X5
5X81.5X4 4X7
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 432 /-/-/289 /109 /445
Z 1483 /-/0 /956 /989 /0
M 969 /-/-/476 /557 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Z Brg Width = 7.6 Min Req =1.8
M Brg Width = -Min Req =-
Bearings B & Z are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -492
E - F 270 -725
F - G 281 -753
G - H 793 -1480
Chords Tens.Comp.
H - I 920 -1536
I - J 902 -1499
J - K 897 -1491
K - L 465 -783
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 409 -263
AA- Z 405 -264
U - S 1280 -776
Chords Tens.Comp.
S - R 1316 -792
R - O 1551 -934
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 395 -533
Z - Y 835 -1205
Y - D 813 -1164
D - W 785 -415
E - W 463 -856
E - U 1207 -683
Webs Tens.Comp.
U - G 666 -973
O - K 901 -547
O - N 799 -477
K - N 647 -893
N - L 1122 -665
L - M 571 -930
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.077 I 999 360
VERT(CL):0.145 I 999 240
HORZ(LL):-0.028 W --
HORZ(TL):0.052 W --
Creep Factor: 2.0
Max TC CSI:0.351
Max BC CSI:0.504
Max Web CSI:0.542
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T17
Ply: 1
Qty:1
SEQN:166386 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T25
DrwNo:116.21.0947.34903
AK /WHK 04/26/2021
10'7"13 26'6"3
5'11"5
5'11"5
11'7"4
5'7"15
12'7"2
11"14
13'7"4
1'0"2
18'11"4
5'4"
23'5"10
4'6"6
27'6"12
4'1"2
32'1"12
4'7"
37'2"
5'0"4
5'9"9
5'9"9
11'0"6
5'2"13
11'9"
8"10
13'0"6
1'3"6
18'11"4
5'10"14
23'2"2
4'2"14
27'5"
4'2"14
32'3"8
4'10"8
37'2"
4'10"81'
4"1 2'5'4"125'2"13'7'4"127'9"89'5"
11'5"
A
B
C
D E F G
H I J K L
MN
OPQRS
TUVW
X
Y
ZAA
5 12
3X4(A1)1.5X4
6X6
3X3
3X55X8
3X8
1.5X4
10X101.5X4
5X5
5X8 5X5
5X81.5X4 4X7
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 436 /-/-/303 /135 /394
Z 1471 /-/0 /915 /966 /0
M 975 /-/-/470 /578 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Z Brg Width = 7.6 Min Req =1.7
M Brg Width = -Min Req =-
Bearings B & Z are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -503
D - E 304 -671
E - F 312 -654
F - G 690 -1235
G - H 835 -1467
Chords Tens.Comp.
H - I 1137 -1932
I - J 1140 -1915
J - K 1132 -1900
K - L 554 -941
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 420 -275
AA- Z 415 -276
V - T 815 -486
Chords Tens.Comp.
T - S 1310 -768
S - R 1367 -808
R - O 1959 -1163
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 398 -538
Z - Y 809 -1187
Y - D 766 -1092
D - V 906 -515
V - F 388 -600
F - T 797 -447
T - G 427 -701
Webs Tens.Comp.
H - R 671 -420
O - K 1122 -672
O - N 954 -565
K - N 668 -936
N - L 1251 -736
L - M 592 -936
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.101 I 999 360
VERT(CL):0.190 I 999 240
HORZ(LL):-0.026 W --
HORZ(TL):0.049 W --
Creep Factor: 2.0
Max TC CSI:0.397
Max BC CSI:0.525
Max Web CSI:0.500
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T18
Ply: 1
Qty:1
SEQN:166390 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T23
DrwNo:116.21.0947.42233
AK /WHK 04/26/2021
10'7"13 26'6"3
5'11"5
5'11"5
10'11"6
5'0"1
12'7"2
1'7"12
13'7"4
1'0"2
15'7"4
2'
16'11"4
1'4"
22'5"10
5'6"6
27'6"12
5'1"2
32'1"12
4'7"
37'2"
5'0"4
5'9"9
5'9"9
11'0"6
5'2"13
13'0"6
2'
15'3"12
2'3"6
16'11"4
1'7"8
22'2"2
5'2"14
27'5"
5'2"14
32'3"8
4'10"8
37'2"
4'10"81'
4"1 2'4'6"126'0"13'6'6"126'11"89'5"
11'5"
A
B
C
D
E F G
H I J K L
MN
OPQRST
UVW
X
Y
ZAA
5 12
3X4(A1)1.5X4 6X65X5
1.5X4
5X81.5X4
5X5 5X5
5X8 5X5
5X81.5X4
3X5
3X10
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 436 /-/-/303 /135 /394
Z 1471 /-/0 /915 /966 /0
M 975 /-/-/470 /578 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
Z Brg Width = 7.6 Min Req =1.7
M Brg Width = -Min Req =-
Bearings B & Z are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -503
D - E 304 -671
E - F 312 -654
F - G 690 -1235
G - H 835 -1467
Chords Tens.Comp.
H - I 1137 -1932
I - J 1140 -1915
J - K 1132 -1900
K - L 554 -941
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 420 -275
AA- Z 415 -276
V - T 815 -486
Chords Tens.Comp.
T - S 1310 -768
S - R 1367 -808
R - O 1959 -1163
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 398 -538
Z - Y 809 -1187
Y - D 766 -1092
D - V 906 -515
V - F 388 -600
F - T 797 -447
T - G 427 -701
Webs Tens.Comp.
H - R 671 -420
O - K 1122 -672
O - N 954 -565
K - N 668 -936
N - L 1251 -736
L - M 592 -936
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.72 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.101 I 999 360
VERT(CL):0.190 I 999 240
HORZ(LL):-0.026 W --
HORZ(TL):0.049 W --
Creep Factor: 2.0
Max TC CSI:0.397
Max BC CSI:0.525
Max Web CSI:0.500
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T18
Ply: 1
Qty:1
SEQN:166390 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T23
DrwNo:116.21.0947.42233
AK /WHK 04/26/2021
10'7"13 26'6"3
5'11"5
5'11"5
10'11"6
5'0"1
12'7"2
1'7"12
13'7"4
1'0"2
15'7"4
2'
16'11"4
1'4"
22'5"10
5'6"6
27'6"12
5'1"2
32'1"12
4'7"
37'2"
5'0"4
5'9"9
5'9"9
11'0"6
5'2"13
13'0"6
2'
15'3"12
2'3"6
16'11"4
1'7"8
22'2"2
5'2"14
27'5"
5'2"14
32'3"8
4'10"8
37'2"
4'10"81'
4"1 2'4'6"126'0"13'6'6"126'11"89'5"
11'5"
A
B
C
D
E F G
H I J K L
MN
OPQRST
UVW
X
Y
ZAA
5 12
3X4(A1)1.5X4 6X65X5
1.5X4
5X81.5X4
5X5 5X5
5X8 5X5
5X81.5X4
3X5
3X10
4X4
1.5X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/334 /219 /287
E 390 /-/-/287 /284 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 3.6 Min Req =1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 200 -598
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 510 -374
Chords Tens.Comp.
F - E 505 -375
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 418 -563
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.011 F 999 360
VERT(CL):0.020 F 999 240
HORZ(LL):-0.005 F - -
HORZ(TL):0.008 E - -
Creep Factor: 2.0
Max TC CSI:0.377
Max BC CSI:0.359
Max Web CSI:0.280
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T19
Ply: 1
Qty:2
SEQN:166408 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T22
DrwNo:116.21.0947.45847
AK /WHK 04/26/2021
10'7"9
5'9"7
5'9"7
10'7"9
4'10"2
5'7"11
5'7"11
10'7"9
4'11"141'
4"1 4'9"35'1"159'5"A
B
C
D
EF
5
12
2X4(A1)1.5X4
3X4
1.5X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/334 /219 /287
E 390 /-/-/287 /284 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 3.6 Min Req =1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 200 -598
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 510 -374
Chords Tens.Comp.
F - E 505 -375
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 418 -563
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.011 F 999 360
VERT(CL):0.020 F 999 240
HORZ(LL):-0.005 F - -
HORZ(TL):0.008 E - -
Creep Factor: 2.0
Max TC CSI:0.377
Max BC CSI:0.359
Max Web CSI:0.280
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T19
Ply: 1
Qty:2
SEQN:166408 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T22
DrwNo:116.21.0947.45847
AK /WHK 04/26/2021
10'7"9
5'9"7
5'9"7
10'7"9
4'10"2
5'7"11
5'7"11
10'7"9
4'11"141'
4"1 4'9"35'1"159'5"A
B
C
D
EF
5
12
2X4(A1)1.5X4
3X4
1.5X4
5X5
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/336 /236 /244
F 390 /-/-/256 /269 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = 3.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 294 -583
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 511 -428
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 425 -95
Webs Tens.Comp.
D - F 225 -434
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.013 C 999 360
VERT(CL):0.031 G 999 240
HORZ(LL):0.005 G - -
HORZ(TL):0.014 G - -
Creep Factor: 2.0
Max TC CSI:0.298
Max BC CSI:0.562
Max Web CSI:0.148
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:166405 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T21
DrwNo:116.21.0948.44520
AK /WHK 04/26/2021
10'7"9
4'9"8
4'9"8
8'11"4
4'1"12
10'7"9
1'8"5
8'11"4
8'11"4
10'7"9
1'8"51'
4"1 4'0"124'5"89'5"A
B
C
D E
FG
5
12
2X4(A1)
1.5X4
4X7
3X4
1.5X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/336 /236 /244
F 390 /-/-/256 /269 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = 3.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 294 -583
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 511 -428
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 425 -95
Webs Tens.Comp.
D - F 225 -434
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.013 C 999 360
VERT(CL):0.031 G 999 240
HORZ(LL):0.005 G - -
HORZ(TL):0.014 G - -
Creep Factor: 2.0
Max TC CSI:0.298
Max BC CSI:0.562
Max Web CSI:0.148
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:166405 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T21
DrwNo:116.21.0948.44520
AK /WHK 04/26/2021
10'7"9
4'9"8
4'9"8
8'11"4
4'1"12
10'7"9
1'8"5
8'11"4
8'11"4
10'7"9
1'8"51'
4"1 4'0"124'5"89'5"A
B
C
D E
FG
5
12
2X4(A1)
1.5X4
4X7
3X4
1.5X4
5X5
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/332 /252 /194
E 390 /-/-/227 /254 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 3.6 Min Req =1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 177 -455
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 286 -457
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.028 F 999 360
VERT(CL):0.044 F 999 240
HORZ(LL):-0.015 F - -
HORZ(TL):0.022 F - -
Creep Factor: 2.0
Max TC CSI:0.618
Max BC CSI:0.449
Max Web CSI:0.154
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T21
Ply: 1
Qty:1
SEQN:166402 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T20
DrwNo:116.21.0948.46620
AK /WHK 04/26/2021
10'7"9
6'11"4
6'11"4
10'7"9
3'8"5
7'1"
7'1"
10'7"9
3'6"91'
4"1 3'2"123'7"89'5"A
B
C D
EF
5
12
2X4(A1)
4X7
1.5X4
1.5X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/332 /252 /194
E 390 /-/-/227 /254 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 3.6 Min Req =1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 177 -455
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 286 -457
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.028 F 999 360
VERT(CL):0.044 F 999 240
HORZ(LL):-0.015 F - -
HORZ(TL):0.022 F - -
Creep Factor: 2.0
Max TC CSI:0.618
Max BC CSI:0.449
Max Web CSI:0.154
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T21
Ply: 1
Qty:1
SEQN:166402 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T20
DrwNo:116.21.0948.46620
AK /WHK 04/26/2021
10'7"9
6'11"4
6'11"4
10'7"9
3'8"5
7'1"
7'1"
10'7"9
3'6"91'
4"1 3'2"123'7"89'5"A
B
C D
EF
5
12
2X4(A1)
4X7
1.5X4
1.5X4
5X5
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.94
TC: From 28 plf at 4.94 to 28 plf at 10.63
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.97
BC: From 10 plf at 4.97 to 10 plf at 10.63
TC: 308 lb Conc. Load at 4.97
TC: 116 lb Conc. Load at 7.00, 9.00
BC: 176 lb Conc. Load at 4.97
BC: 87 lb Conc. Load at 7.00, 9.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 774 /-/-/-/480 /-
E 762 /-/-/-/459 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 3.6 Min Req =1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 800 -1367
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1212 -691
Chords Tens.Comp.
F - E 1237 -688
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 701 -1273
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.032 F 999 360
VERT(CL):0.059 F 999 240
HORZ(LL):0.011 E - -
HORZ(TL):0.020 E - -
Creep Factor: 2.0
Max TC CSI:0.873
Max BC CSI:0.645
Max Web CSI:0.728
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T22
Ply: 1
Qty:1
SEQN:166399 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T71
DrwNo:116.21.0948.48310
AK /WHK 04/26/2021
10'7"9
4'11"4
4'11"4
10'7"9
5'8"5
5'1"
5'1"
10'7"9
5'6"91'
4"1 2'4"122'9"89'5"A
B
C D
EF
5
12
2X5(A1)
6X8
1.5X4
2X5
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.94
TC: From 28 plf at 4.94 to 28 plf at 10.63
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.97
BC: From 10 plf at 4.97 to 10 plf at 10.63
TC: 308 lb Conc. Load at 4.97
TC: 116 lb Conc. Load at 7.00, 9.00
BC: 176 lb Conc. Load at 4.97
BC: 87 lb Conc. Load at 7.00, 9.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 774 /-/-/-/480 /-
E 762 /-/-/-/459 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 3.6 Min Req =1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 800 -1367
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1212 -691
Chords Tens.Comp.
F - E 1237 -688
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 701 -1273
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.032 F 999 360
VERT(CL):0.059 F 999 240
HORZ(LL):0.011 E - -
HORZ(TL):0.020 E - -
Creep Factor: 2.0
Max TC CSI:0.873
Max BC CSI:0.645
Max Web CSI:0.728
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T22
Ply: 1
Qty:1
SEQN:166399 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T71
DrwNo:116.21.0948.48310
AK /WHK 04/26/2021
10'7"9
4'11"4
4'11"4
10'7"9
5'8"5
5'1"
5'1"
10'7"9
5'6"91'
4"1 2'4"122'9"89'5"A
B
C D
EF
5
12
2X5(A1)
6X8
1.5X4
2X5
6X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/394 /278 /295
J 535 /-/0 /333 /354 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 335 -797
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 690 -502
Chords Tens.Comp.
L - K 686 -504
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 406 -541
D - K 437 -221
Webs Tens.Comp.
D - J 407 -588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.023 L 999 360
VERT(CL):0.043 L 999 240
HORZ(LL):-0.007 C - -
HORZ(TL):0.012 J - -
Creep Factor: 2.0
Max TC CSI:0.307
Max BC CSI:0.398
Max Web CSI:0.314
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T23
Ply: 1
Qty:1
SEQN:166423 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T33
DrwNo:116.21.0948.50130
AK /WHK 04/26/2021
13'8"8
5'11"4
5'11"4
10'11"4
5'
12'11"
1'11"12
13'8"8
9"8
5'9"8
5'9"8
10'11"4
5'1"12
13'
2'0"12
13'8"8
8"8
1'
4"1 4'10"122'5'3"89'5"A
B
C
D E F
G
H
I
JKL
5
12
2X4(A1)1.5X4
3X4
4X7
3X4
6X6
3X3
3X41.5X4
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/394 /278 /295
J 535 /-/0 /333 /354 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 335 -797
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 690 -502
Chords Tens.Comp.
L - K 686 -504
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 406 -541
D - K 437 -221
Webs Tens.Comp.
D - J 407 -588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.023 L 999 360
VERT(CL):0.043 L 999 240
HORZ(LL):-0.007 C - -
HORZ(TL):0.012 J - -
Creep Factor: 2.0
Max TC CSI:0.307
Max BC CSI:0.398
Max Web CSI:0.314
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T23
Ply: 1
Qty:1
SEQN:166423 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T33
DrwNo:116.21.0948.50130
AK /WHK 04/26/2021
13'8"8
5'11"4
5'11"4
10'11"4
5'
12'11"
1'11"12
13'8"8
9"8
5'9"8
5'9"8
10'11"4
5'1"12
13'
2'0"12
13'8"8
8"8
1'
4"1 4'10"122'5'3"89'5"A
B
C
D E F
G
H
I
JKL
5
12
2X4(A1)1.5X4
3X4
4X7
3X4
6X6
3X3
3X41.5X4
3X3
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/391 /258 /345
L 534 /-/0 /370 /373 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 25 -421
Chords Tens.Comp.
D - E 412 -937
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - R 753 -526
R - P 864 -629
Chords Tens.Comp.
P - M 860 -631
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 503 -585
E - M 513 -703
M - G 613 -457
Webs Tens.Comp.
L - K 436 -591
K - G 439 -582
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.177 Q 873 360
VERT(CL):0.296 Q 521 240
HORZ(LL):-0.088 L - -
HORZ(TL):0.141 L - -
Creep Factor: 2.0
Max TC CSI:0.518
Max BC CSI:0.597
Max Web CSI:0.288
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T24
Ply: 1
Qty:1
SEQN:166438 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T39
DrwNo:116.21.0948.52330
AK /WHK 04/26/2021
T2
13'8"8
1'4"13
1'4"13
6'8"4
5'3"7
10'11"12
4'3"8
12'11"4
1'11"8
13'8"8
9"4
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
6'6"8
3'10"2
10'10"
4'3"8
13'
2'2"
13'8"8
8"8
1'
4"1 5'8"128"2'6'1"89'5"A
B
C D
E
F
G H
I
J
K
L
M
N
OP
QRST
5 12
2X4(A1)
3X3
2X41.5X6(**)
3X4
5X8
6X6
3X3
5X10
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/391 /258 /345
L 534 /-/0 /370 /373 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 25 -421
Chords Tens.Comp.
D - E 412 -937
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - R 753 -526
R - P 864 -629
Chords Tens.Comp.
P - M 860 -631
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 503 -585
E - M 513 -703
M - G 613 -457
Webs Tens.Comp.
L - K 436 -591
K - G 439 -582
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.177 Q 873 360
VERT(CL):0.296 Q 521 240
HORZ(LL):-0.088 L - -
HORZ(TL):0.141 L - -
Creep Factor: 2.0
Max TC CSI:0.518
Max BC CSI:0.597
Max Web CSI:0.288
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T24
Ply: 1
Qty:1
SEQN:166438 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T39
DrwNo:116.21.0948.52330
AK /WHK 04/26/2021
T2
13'8"8
1'4"13
1'4"13
6'8"4
5'3"7
10'11"12
4'3"8
12'11"4
1'11"8
13'8"8
9"4
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
6'6"8
3'10"2
10'10"
4'3"8
13'
2'2"
13'8"8
8"8
1'
4"1 5'8"128"2'6'1"89'5"A
B
C D
E
F
G H
I
J
K
L
M
N
OP
QRST
5 12
2X4(A1)
3X3
2X41.5X6(**)
3X4
5X8
6X6
3X3
5X10
3X3
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/388 /250 /365
L 533 /-/0 /385 /380 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 4 -421
Chords Tens.Comp.
D - E 391 -937
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - R 754 -526
R - P 864 -629
Chords Tens.Comp.
P - M 860 -631
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 503 -585
E - M 514 -704
M - G 605 -451
Webs Tens.Comp.
L - K 458 -609
G - K 460 -600
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.177 Q 871 360
VERT(CL):0.296 Q 521 240
HORZ(LL):-0.088 L - -
HORZ(TL):0.141 L - -
Creep Factor: 2.0
Max TC CSI:0.518
Max BC CSI:0.597
Max Web CSI:0.289
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T25
Ply: 1
Qty:7
SEQN:166435 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T34
DrwNo:116.21.0949.10567
AK /WHK 04/26/2021
13'8"8
1'4"13
1'4"13
6'8"4
5'3"7
10'11"12
4'3"8
12'9"4
1'9"8
13'8"8
11"4
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
6'6"8
3'10"2
10'10"
4'3"8
13'
2'2"
13'8"8
8"8
1'
4"1 5'9"18"2'6'0"106'5"59'5"A
B
C D
E
F
G
H
I
J
K
L
M
N
OP
QRST
5 12
2X4(A1)
3X3
2X41.5X6(**)
3X4
5X8
6X6
3X8
3X33X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/388 /250 /365
L 533 /-/0 /385 /380 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 4 -421
Chords Tens.Comp.
D - E 391 -937
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - R 754 -526
R - P 864 -629
Chords Tens.Comp.
P - M 860 -631
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 503 -585
E - M 514 -704
M - G 605 -451
Webs Tens.Comp.
L - K 458 -609
G - K 460 -600
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.177 Q 871 360
VERT(CL):0.296 Q 521 240
HORZ(LL):-0.088 L - -
HORZ(TL):0.141 L - -
Creep Factor: 2.0
Max TC CSI:0.518
Max BC CSI:0.597
Max Web CSI:0.289
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T25
Ply: 1
Qty:7
SEQN:166435 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T34
DrwNo:116.21.0949.10567
AK /WHK 04/26/2021
13'8"8
1'4"13
1'4"13
6'8"4
5'3"7
10'11"12
4'3"8
12'9"4
1'9"8
13'8"8
11"4
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
6'6"8
3'10"2
10'10"
4'3"8
13'
2'2"
13'8"8
8"8
1'
4"1 5'9"18"2'6'0"106'5"59'5"A
B
C D
E
F
G
H
I
J
K
L
M
N
OP
QRST
5 12
2X4(A1)
3X3
2X41.5X6(**)
3X4
5X8
6X6
3X8
3X33X3
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/388 /250 /365
I 535 /-/0 /385 /380 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
I Brg Width = 3.5 Min Req =1.5
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 240 -758
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 647 -472
Chords Tens.Comp.
J - I 640 -472
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 510 -698
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.027 J 999 360
VERT(CL):0.050 J 999 240
HORZ(LL):-0.018 F - -
HORZ(TL):0.020 F - -
Creep Factor: 2.0
Max TC CSI:0.410
Max BC CSI:0.591
Max Web CSI:0.528
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T26
Ply: 1
Qty:1
SEQN:166426 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T35
DrwNo:116.21.0949.12847
AK /WHK 04/26/2021
13'8"8
6'11"2
6'11"2
12'11"
5'11"14
13'8"8
9"8
6'9"6
6'9"6
13'
6'2"10
13'8"8
8"8
1'
4"1 5'9"12'6'0"106'5"59'5"A
B
C
D
E
F
G
H
IJ
5 12
2X4(A1)1.5X4
3X4
6X6
3X3
3X4
1.5X4
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 556 /-/-/388 /250 /365
I 535 /-/0 /385 /380 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
I Brg Width = 3.5 Min Req =1.5
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 240 -758
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 647 -472
Chords Tens.Comp.
J - I 640 -472
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 510 -698
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.027 J 999 360
VERT(CL):0.050 J 999 240
HORZ(LL):-0.018 F - -
HORZ(TL):0.020 F - -
Creep Factor: 2.0
Max TC CSI:0.410
Max BC CSI:0.591
Max Web CSI:0.528
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T26
Ply: 1
Qty:1
SEQN:166426 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T35
DrwNo:116.21.0949.12847
AK /WHK 04/26/2021
13'8"8
6'11"2
6'11"2
12'11"
5'11"14
13'8"8
9"8
6'9"6
6'9"6
13'
6'2"10
13'8"8
8"8
1'
4"1 5'9"12'6'0"106'5"59'5"A
B
C
D
E
F
G
H
IJ
5 12
2X4(A1)1.5X4
3X4
6X6
3X3
3X4
1.5X4
3X3
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 581 /-/-/407 /268 /365
F 509 /-/-/375 /370 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 269 -795
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 679 -496
Chords Tens.Comp.
H - G 674 -497
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 552 -748
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.019 H 999 360
VERT(CL):0.033 H 999 240
HORZ(LL):-0.010 H - -
HORZ(TL):0.014 H - -
Creep Factor: 2.0
Max TC CSI:0.523
Max BC CSI:0.496
Max Web CSI:0.632
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T27
Ply: 1
Qty:2
SEQN:166432 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T36
DrwNo:116.21.0949.14877
AK /WHK 04/26/2021
13'8"8
7'3"14
7'3"14
13'6"
6'2"2
13'8"8
2"8
7'2"2
7'2"2
13'4"4
6'2"2
13'8"8
4"4
1'
4"1 6'0"106'5"59'5"A
B
C
D E
F GH
5 12
2X4(A1)1.5X4
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 581 /-/-/407 /268 /365
F 509 /-/-/375 /370 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 269 -795
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 679 -496
Chords Tens.Comp.
H - G 674 -497
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 552 -748
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.019 H 999 360
VERT(CL):0.033 H 999 240
HORZ(LL):-0.010 H - -
HORZ(TL):0.014 H - -
Creep Factor: 2.0
Max TC CSI:0.523
Max BC CSI:0.496
Max Web CSI:0.632
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T27
Ply: 1
Qty:2
SEQN:166432 MONO
FROM:
Cust: R 761 JRef:1X4V7610002 T36
DrwNo:116.21.0949.14877
AK /WHK 04/26/2021
13'8"8
7'3"14
7'3"14
13'6"
6'2"2
13'8"8
2"8
7'2"2
7'2"2
13'4"4
6'2"2
13'8"8
4"4
1'
4"1 6'0"106'5"59'5"A
B
C
D E
F GH
5 12
2X4(A1)1.5X4
3X4
1.5X4
6X6
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.17
TC: From 27 plf at 2.17 to 27 plf at 6.50
TC: From 55 plf at 6.50 to 55 plf at 9.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.17
BC: From 10 plf at 2.17 to 10 plf at 6.50
BC: From 20 plf at 6.50 to 20 plf at 8.67
BC: From 4 plf at 8.67 to 4 plf at 9.67
TC: 14 lb Conc. Load at 2.17, 6.50
TC: 48 lb Conc. Load at 2.50, 3.87, 4.79, 6.17
BC: 5 lb Conc. Load at 2.17, 6.50
BC: 41 lb Conc. Load at 2.50, 6.17
BC: 22 lb Conc. Load at 3.87, 4.79
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 481 /-/-/-/298 /-
G 481 /-/-/-/298 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 413 -724
C - D 377 -652
D - E 344 -610
Chords Tens.Comp.
E - F 377 -652
F - G 413 -724
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 644 -360
L - K 648 -353
K - J 610 -344
Chords Tens.Comp.
J - I 648 -353
I - G 644 -360
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.013 K 999 360
VERT(CL):0.023 K 999 240
HORZ(LL):0.005 I - -
HORZ(TL):0.008 I - -
Creep Factor: 2.0
Max TC CSI:0.141
Max BC CSI:0.219
Max Web CSI:0.017
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T28
Ply: 1
Qty:1
SEQN:166258 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T42
DrwNo:116.21.0949.17883
AK /WHK 04/26/2021
8'8"
2'2"
2'2"
3'10"7
1'8"7
4'9"9
11"1
6'6"
1'8"7
8'8"
2'2"
3'10"7
3'10"7
4'9"9
11"1
8'8"
3'10"71'1'
4"11'2"141'8"122'1"79'5"A
B
C
D E
F
G
H
IJKL
5
12
3.42 12
2X4(A1)
5X8
1.5X4
4X4
3X4
4X4
3X4 1.5X4
5X8
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.17
TC: From 27 plf at 2.17 to 27 plf at 6.50
TC: From 55 plf at 6.50 to 55 plf at 9.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.17
BC: From 10 plf at 2.17 to 10 plf at 6.50
BC: From 20 plf at 6.50 to 20 plf at 8.67
BC: From 4 plf at 8.67 to 4 plf at 9.67
TC: 14 lb Conc. Load at 2.17, 6.50
TC: 48 lb Conc. Load at 2.50, 3.87, 4.79, 6.17
BC: 5 lb Conc. Load at 2.17, 6.50
BC: 41 lb Conc. Load at 2.50, 6.17
BC: 22 lb Conc. Load at 3.87, 4.79
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 481 /-/-/-/298 /-
G 481 /-/-/-/298 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 413 -724
C - D 377 -652
D - E 344 -610
Chords Tens.Comp.
E - F 377 -652
F - G 413 -724
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 644 -360
L - K 648 -353
K - J 610 -344
Chords Tens.Comp.
J - I 648 -353
I - G 644 -360
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.013 K 999 360
VERT(CL):0.023 K 999 240
HORZ(LL):0.005 I - -
HORZ(TL):0.008 I - -
Creep Factor: 2.0
Max TC CSI:0.141
Max BC CSI:0.219
Max Web CSI:0.017
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T28
Ply: 1
Qty:1
SEQN:166258 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T42
DrwNo:116.21.0949.17883
AK /WHK 04/26/2021
8'8"
2'2"
2'2"
3'10"7
1'8"7
4'9"9
11"1
6'6"
1'8"7
8'8"
2'2"
3'10"7
3'10"7
4'9"9
11"1
8'8"
3'10"71'1'
4"11'2"141'8"122'1"79'5"A
B
C
D E
F
G
H
IJKL
5
12
3.42 12
2X4(A1)
5X8
1.5X4
4X4
3X4
4X4
3X4 1.5X4
5X8
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 4.50" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 8.67
BC: From 10 plf at 0.00 to 10 plf at 8.67
BC: 113 lb Conc. Load at 1.03
BC: 1307 lb Conc. Load at 3.08
BC: 698 lb Conc. Load at 5.08, 7.08
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 1638 /-/-/-/988 /-
C 1743 /-/-/-/1039 /-
Wind reactions based on MWFRS
E Brg Width = 7.6 Min Req =1.5
C Brg Width = 7.6 Min Req =1.5
Bearings E & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 920 -1523
Chords Tens.Comp.
B - C 920 -1523
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 1400 -840
Chords Tens.Comp.
D - C 1400 -840
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 1015 -574
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 D 999 360
VERT(CL):0.047 D 999 240
HORZ(LL):-0.007 D - -
HORZ(TL):0.013 D - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.619
Max Web CSI:0.229
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T29
Ply: 2
Qty:1
SEQN:166396 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T56
DrwNo:116.21.0949.21280
AK /WHK 04/26/2021
2 Complete Trusses Required
8'8"
4'4"
4'4"
8'8"
4'4"
4'4"
4'4"
8'8"
4'4"
4"12'1"129'5"
A
B
C
DE
5
12
2X5(A1)
4X4
3X8 2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 4.50" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 8.67
BC: From 10 plf at 0.00 to 10 plf at 8.67
BC: 113 lb Conc. Load at 1.03
BC: 1307 lb Conc. Load at 3.08
BC: 698 lb Conc. Load at 5.08, 7.08
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 1638 /-/-/-/988 /-
C 1743 /-/-/-/1039 /-
Wind reactions based on MWFRS
E Brg Width = 7.6 Min Req =1.5
C Brg Width = 7.6 Min Req =1.5
Bearings E & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 920 -1523
Chords Tens.Comp.
B - C 920 -1523
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 1400 -840
Chords Tens.Comp.
D - C 1400 -840
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 1015 -574
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 D 999 360
VERT(CL):0.047 D 999 240
HORZ(LL):-0.007 D - -
HORZ(TL):0.013 D - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.619
Max Web CSI:0.229
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T29
Ply: 2
Qty:1
SEQN:166396 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T56
DrwNo:116.21.0949.21280
AK /WHK 04/26/2021
2 Complete Trusses Required
8'8"
4'4"
4'4"
8'8"
4'4"
4'4"
4'4"
8'8"
4'4"
4"12'1"129'5"
A
B
C
DE
5
12
2X5(A1)
4X4
3X8 2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 13.44
TC: From 55 plf at 13.44 to 55 plf at 18.46
BC: From 10 plf at 0.00 to 10 plf at 13.41
BC: From 20 plf at 13.41 to 20 plf at 18.46
TC: 118 lb Conc. Load at 1.37, 3.37, 5.37, 7.37
9.37,11.37
TC: 316 lb Conc. Load at 13.41
BC: 89 lb Conc. Load at 1.37, 3.37, 5.37, 7.37
9.37,11.37
BC: 179 lb Conc. Load at 13.41
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 1312 /-/-/-/799 /-
E 1307 /-/-/-/785 /-
Wind reactions based on MWFRS
I Brg Width = -Min Req =-
E Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1392 -2291
B - C 1392 -2291
Chords Tens.Comp.
C - D 1864 -3078
D - E 1742 -2853
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 3076 -1884
G - F 2607 -1562
Chords Tens.Comp.
F - E 2588 -1566
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - I 801 -1220
A - H 2510 -1525
B - H 429 -409
Webs Tens.Comp.
H - C 551 -879
G - D 523 -334
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.136 C 999 360
VERT(CL):0.248 G 888 240
HORZ(LL):-0.034 F - -
HORZ(TL):0.062 F - -
Creep Factor: 2.0
Max TC CSI:0.749
Max BC CSI:0.904
Max Web CSI:0.602
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T30
Ply: 1
Qty:1
SEQN:166262 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T54
DrwNo:116.21.0949.23803
AK /WHK 04/26/2021
18'5"8
4'6"5
4'6"5
8'9"3
4'2"13
13'5"4
4'8"1
18'5"8
5'0"4
4'6"5
4'6"5
9'0"11
4'6"5
13'3"8
4'2"13
18'5"8
5'2"2'5"34"1 9'5"
A B C D
E
FGHI
5
12
4X7
1.5X6
1.5X4
4X12
3X4
5X5 1.5X4
5X8
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 13.44
TC: From 55 plf at 13.44 to 55 plf at 18.46
BC: From 10 plf at 0.00 to 10 plf at 13.41
BC: From 20 plf at 13.41 to 20 plf at 18.46
TC: 118 lb Conc. Load at 1.37, 3.37, 5.37, 7.37
9.37,11.37
TC: 316 lb Conc. Load at 13.41
BC: 89 lb Conc. Load at 1.37, 3.37, 5.37, 7.37
9.37,11.37
BC: 179 lb Conc. Load at 13.41
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 1312 /-/-/-/799 /-
E 1307 /-/-/-/785 /-
Wind reactions based on MWFRS
I Brg Width = -Min Req =-
E Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1392 -2291
B - C 1392 -2291
Chords Tens.Comp.
C - D 1864 -3078
D - E 1742 -2853
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 3076 -1884
G - F 2607 -1562
Chords Tens.Comp.
F - E 2588 -1566
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - I 801 -1220
A - H 2510 -1525
B - H 429 -409
Webs Tens.Comp.
H - C 551 -879
G - D 523 -334
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.136 C 999 360
VERT(CL):0.248 G 888 240
HORZ(LL):-0.034 F - -
HORZ(TL):0.062 F - -
Creep Factor: 2.0
Max TC CSI:0.749
Max BC CSI:0.904
Max Web CSI:0.602
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T30
Ply: 1
Qty:1
SEQN:166262 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T54
DrwNo:116.21.0949.23803
AK /WHK 04/26/2021
18'5"8
4'6"5
4'6"5
8'9"3
4'2"13
13'5"4
4'8"1
18'5"8
5'0"4
4'6"5
4'6"5
9'0"11
4'6"5
13'3"8
4'2"13
18'5"8
5'2"2'5"34"1 9'5"
A B C D
E
FGHI
5
12
4X7
1.5X6
1.5X4
4X12
3X4
5X5 1.5X4
5X8
3X6(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 689 /-/-/353 /422 /176
D 698 /-/-/422 /392 /-
Wind reactions based on MWFRS
G Brg Width = -Min Req =-
D Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 606 -981
B - C 606 -981
Chords Tens.Comp.
C - D 684 -1235
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 1091 -530
Chords Tens.Comp.
E - D 1083 -531
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - G 438 -637
Webs Tens.Comp.
A - F 1091 -673
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 E 999 360
VERT(CL):0.073 E 999 240
HORZ(LL):0.012 E - -
HORZ(TL):0.022 E - -
Creep Factor: 2.0
Max TC CSI:0.523
Max BC CSI:0.503
Max Web CSI:0.452
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T31
Ply: 1
Qty:1
SEQN:166266 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T55
DrwNo:116.21.1002.43447
AK /WHK 04/26/2021
18'5"8
5'8"10
5'8"10
11'5"4
5'8"10
18'5"8
7'0"4
5'8"10
5'8"10
11'3"8
5'6"14
18'5"8
7'2"3'3"34"1 9'5"
A B C
D
EFG
5124X4
1.5X6
1.5X4
3X8 5X5
4X7
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 689 /-/-/353 /422 /176
D 698 /-/-/422 /392 /-
Wind reactions based on MWFRS
G Brg Width = -Min Req =-
D Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 606 -981
B - C 606 -981
Chords Tens.Comp.
C - D 684 -1235
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 1091 -530
Chords Tens.Comp.
E - D 1083 -531
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - G 438 -637
Webs Tens.Comp.
A - F 1091 -673
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 E 999 360
VERT(CL):0.073 E 999 240
HORZ(LL):0.012 E - -
HORZ(TL):0.022 E - -
Creep Factor: 2.0
Max TC CSI:0.523
Max BC CSI:0.503
Max Web CSI:0.452
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T31
Ply: 1
Qty:1
SEQN:166266 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T55
DrwNo:116.21.1002.43447
AK /WHK 04/26/2021
18'5"8
5'8"10
5'8"10
11'5"4
5'8"10
18'5"8
7'0"4
5'8"10
5'8"10
11'3"8
5'6"14
18'5"8
7'2"3'3"34"1 9'5"
A B C
D
EFG
5124X4
1.5X6
1.5X4
3X8 5X5
4X7
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 689 /-/-/370 /431 /226
E 698 /-/-/439 /382 /-
Wind reactions based on MWFRS
H Brg Width = -Min Req =-
E Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 430 -673
B - C 430 -673
Chords Tens.Comp.
C - D 554 -996
D - E 767 -1310
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 874 -331
Chords Tens.Comp.
F - E 1179 -638
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - H 446 -645
Webs Tens.Comp.
A - G 856 -548
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.035 F 999 360
VERT(CL):0.066 F 999 240
HORZ(LL):0.012 F - -
HORZ(TL):0.023 F - -
Creep Factor: 2.0
Max TC CSI:0.269
Max BC CSI:0.666
Max Web CSI:0.323
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T32
Ply: 1
Qty:1
SEQN:166270 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T53
DrwNo:116.21.1006.12297
AK /WHK 04/26/2021
18'5"8
4'8"10
4'8"10
9'5"4
4'8"10
13'7"8
4'2"4
18'5"8
4'10"
4'8"10
4'8"10
9'5"4
4'8"10
18'5"8
9'0"44'1"34"1 9'5"
A B C
D
E
FGH
5
124X4
1.5X6
1.5X4
3X8
4X7
5X5
1.5X4
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 689 /-/-/370 /431 /226
E 698 /-/-/439 /382 /-
Wind reactions based on MWFRS
H Brg Width = -Min Req =-
E Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 430 -673
B - C 430 -673
Chords Tens.Comp.
C - D 554 -996
D - E 767 -1310
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 874 -331
Chords Tens.Comp.
F - E 1179 -638
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - H 446 -645
Webs Tens.Comp.
A - G 856 -548
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.035 F 999 360
VERT(CL):0.066 F 999 240
HORZ(LL):0.012 F - -
HORZ(TL):0.023 F - -
Creep Factor: 2.0
Max TC CSI:0.269
Max BC CSI:0.666
Max Web CSI:0.323
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T32
Ply: 1
Qty:1
SEQN:166270 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T53
DrwNo:116.21.1006.12297
AK /WHK 04/26/2021
18'5"8
4'8"10
4'8"10
9'5"4
4'8"10
13'7"8
4'2"4
18'5"8
4'10"
4'8"10
4'8"10
9'5"4
4'8"10
18'5"8
9'0"44'1"34"1 9'5"
A B C
D
E
FGH
5
124X4
1.5X6
1.5X4
3X8
4X7
5X5
1.5X4
2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 686 /-/-/389 /440 /297
D 761 /-/-/518 /412 /-
Wind reactions based on MWFRS
H Brg Width = -Min Req =-
D Brg Width = 7.6 Min Req =1.5
Bearing D is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 451 -827
Chords Tens.Comp.
C - D 662 -1281
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 722 -183
G - F 1128 -505
Chords Tens.Comp.
F - D 1132 -505
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - B 565 -851
B - G 447 -95
Webs Tens.Comp.
G - C 360 -452
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 F 999 360
VERT(CL):0.072 F 999 240
HORZ(LL):0.015 F - -
HORZ(TL):0.028 F - -
Creep Factor: 2.0
Max TC CSI:0.708
Max BC CSI:0.595
Max Web CSI:0.442
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T33
Ply: 1
Qty:1
SEQN:166274 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T52
DrwNo:116.21.1006.14553
AK /WHK 04/26/2021
18'5"8
7'5"4
7'5"4
12'5"12
5'0"8
18'5"8
5'11"12
7'5"4
7'5"4
12'7"8
5'2"4
18'5"8
5'10"1'4'11"34"1 5'3"14(a)
9'5"
A B
C
D
E
FGH
5
12
1.5X4
6X6
5X8
5X5
3X4
1.5X4 2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 686 /-/-/389 /440 /297
D 761 /-/-/518 /412 /-
Wind reactions based on MWFRS
H Brg Width = -Min Req =-
D Brg Width = 7.6 Min Req =1.5
Bearing D is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 451 -827
Chords Tens.Comp.
C - D 662 -1281
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 722 -183
G - F 1128 -505
Chords Tens.Comp.
F - D 1132 -505
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - B 565 -851
B - G 447 -95
Webs Tens.Comp.
G - C 360 -452
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 F 999 360
VERT(CL):0.072 F 999 240
HORZ(LL):0.015 F - -
HORZ(TL):0.028 F - -
Creep Factor: 2.0
Max TC CSI:0.708
Max BC CSI:0.595
Max Web CSI:0.442
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T33
Ply: 1
Qty:1
SEQN:166274 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T52
DrwNo:116.21.1006.14553
AK /WHK 04/26/2021
18'5"8
7'5"4
7'5"4
12'5"12
5'0"8
18'5"8
5'11"12
7'5"4
7'5"4
12'7"8
5'2"4
18'5"8
5'10"1'4'11"34"1 5'3"14(a)
9'5"
A B
C
D
E
FGH
5
12
1.5X4
6X6
5X8
5X5
3X4
1.5X4 2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 685 /-/-/415 /453 /325
F 696 /-/-/457 /354 /-
Wind reactions based on MWFRS
O Brg Width = -Min Req =-
F Brg Width = 6.6 Min Req =1.5
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 78 -433
B - C 78 -437
C - D 368 -860
Chords Tens.Comp.
D - E 478 -1263
E - F 622 -1276
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - K 769 -16
K - H 1111 -206
Chords Tens.Comp.
G - F 1128 -490
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - O 152 -657
A - M 748 -135
O - M 448 -131
M - C 373 -475
Webs Tens.Comp.
C - K 580 -347
K - D 438 -771
D - H 624 -224
H - G 1191 -520
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.045 H 999 360
VERT(CL):0.085 H 999 240
HORZ(LL):0.034 A - -
HORZ(TL):0.064 A - -
Creep Factor: 2.0
Max TC CSI:0.378
Max BC CSI:0.411
Max Web CSI:0.345
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T34
Ply: 1
Qty:1
SEQN:166277 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T28
DrwNo:116.21.1006.22550
AK /WHK 04/26/2021
18'4"8
2'3"12
2'3"12
5'5"4
3'1"8
6'9"8
1'4"4
12'1"14
5'4"6
18'4"8
6'2"10
2'9"
2'9"
5'5"4
2'8"4
6'9"8
1'4"4
12'1"14
5'4"6
18'4"8
6'2"105'9"34"82'9'5"
A B C
D
E
F
G
H
IJ
K
L
M
NO
512
3X3
6X6
1.5X4
6X81.5X4
4X7
3X4
3X4
5X81.5X4 3X5
3X4
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 685 /-/-/415 /453 /325
F 696 /-/-/457 /354 /-
Wind reactions based on MWFRS
O Brg Width = -Min Req =-
F Brg Width = 6.6 Min Req =1.5
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 78 -433
B - C 78 -437
C - D 368 -860
Chords Tens.Comp.
D - E 478 -1263
E - F 622 -1276
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - K 769 -16
K - H 1111 -206
Chords Tens.Comp.
G - F 1128 -490
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - O 152 -657
A - M 748 -135
O - M 448 -131
M - C 373 -475
Webs Tens.Comp.
C - K 580 -347
K - D 438 -771
D - H 624 -224
H - G 1191 -520
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.045 H 999 360
VERT(CL):0.085 H 999 240
HORZ(LL):0.034 A - -
HORZ(TL):0.064 A - -
Creep Factor: 2.0
Max TC CSI:0.378
Max BC CSI:0.411
Max Web CSI:0.345
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T34
Ply: 1
Qty:1
SEQN:166277 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T28
DrwNo:116.21.1006.22550
AK /WHK 04/26/2021
18'4"8
2'3"12
2'3"12
5'5"4
3'1"8
6'9"8
1'4"4
12'1"14
5'4"6
18'4"8
6'2"10
2'9"
2'9"
5'5"4
2'8"4
6'9"8
1'4"4
12'1"14
5'4"6
18'4"8
6'2"105'9"34"82'9'5"
A B C
D
E
F
G
H
IJ
K
L
M
NO
512
3X3
6X6
1.5X4
6X81.5X4
4X7
3X4
3X4
5X81.5X4 3X5
3X4
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 598 /-/-/406 /376 /373
E 610 /-/-/404 /327 /-
Wind reactions based on MWFRS
H Brg Width = -Min Req =-
E Brg Width = 6.6 Min Req =1.5
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 620 -1159
C - D 473 -1141
Chords Tens.Comp.
D - E 891 -1794
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 1645 -764
Chords Tens.Comp.
F - E 1637 -758
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - B 433 -584
B - G 1179 -685
Webs Tens.Comp.
G - D 512 -588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 D 999 360
VERT(CL):0.173 D 999 240
HORZ(LL):0.043 A - -
HORZ(TL):0.081 A - -
Creep Factor: 2.0
Max TC CSI:0.332
Max BC CSI:0.614
Max Web CSI:0.453
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T35
Ply: 1
Qty:1
SEQN:166283 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T40
DrwNo:116.21.1010.12473
AK /WHK 04/26/2021
16'0"2
1'1"14
1'1"14
5'7"13
4'5"15
10'5"14
4'10"1
16'0"2
5'6"4
5'9"9
5'9"9
10'7"10
4'10"1
15'4"12
4'9"2
16'0"2
7"62'4'6"124"8 6'6"1211'5"
9'5"
A B
C
D
EF
GH
512
2.5
12
1.5X4
6X6
4X5
1.5X4
5X12
3X4
1.5X4
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 598 /-/-/406 /376 /373
E 610 /-/-/404 /327 /-
Wind reactions based on MWFRS
H Brg Width = -Min Req =-
E Brg Width = 6.6 Min Req =1.5
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 620 -1159
C - D 473 -1141
Chords Tens.Comp.
D - E 891 -1794
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 1645 -764
Chords Tens.Comp.
F - E 1637 -758
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - B 433 -584
B - G 1179 -685
Webs Tens.Comp.
G - D 512 -588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 D 999 360
VERT(CL):0.173 D 999 240
HORZ(LL):0.043 A - -
HORZ(TL):0.081 A - -
Creep Factor: 2.0
Max TC CSI:0.332
Max BC CSI:0.614
Max Web CSI:0.453
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T35
Ply: 1
Qty:1
SEQN:166283 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T40
DrwNo:116.21.1010.12473
AK /WHK 04/26/2021
16'0"2
1'1"14
1'1"14
5'7"13
4'5"15
10'5"14
4'10"1
16'0"2
5'6"4
5'9"9
5'9"9
10'7"10
4'10"1
15'4"12
4'9"2
16'0"2
7"62'4'6"124"8 6'6"1211'5"
9'5"
A B
C
D
EF
GH
512
2.5
12
1.5X4
6X6
4X5
1.5X4
5X12
3X4
1.5X4
2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 598 /-/-/427 /383 /402
D 610 /-/-/403 /319 /-
Wind reactions based on MWFRS
G Brg Width = -Min Req =-
D Brg Width = 6.6 Min Req =1.5
Bearing D is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 452 -1156
Chords Tens.Comp.
C - D 850 -1787
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 978 -203
F - E 1638 -725
Chords Tens.Comp.
E - D 1631 -720
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - B 660 -1067
B - F 524 -141
Webs Tens.Comp.
F - C 490 -564
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.089 C 999 360
VERT(CL):0.167 C 999 240
HORZ(LL):0.047 A - -
HORZ(TL):0.088 A - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.605
Max Web CSI:0.657
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T36
Ply: 1
Qty:7
SEQN:166286 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T26
DrwNo:116.21.1010.24627
AK /WHK 04/26/2021
16'0"2
5'6"1
5'6"1
10'5"14
4'11"13
16'0"2
5'6"4
5'9"9
5'9"9
10'7"10
4'10"1
15'4"12
4'9"2
16'0"2
7"62'5'0"84"8 7'0"811'5"
9'5"
A
B
C
DE
FG
512
2.5
12
1.5X4
6X6
3X4
5X5
3X4
1.5X4
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 598 /-/-/427 /383 /402
D 610 /-/-/403 /319 /-
Wind reactions based on MWFRS
G Brg Width = -Min Req =-
D Brg Width = 6.6 Min Req =1.5
Bearing D is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 452 -1156
Chords Tens.Comp.
C - D 850 -1787
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 978 -203
F - E 1638 -725
Chords Tens.Comp.
E - D 1631 -720
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - B 660 -1067
B - F 524 -141
Webs Tens.Comp.
F - C 490 -564
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.089 C 999 360
VERT(CL):0.167 C 999 240
HORZ(LL):0.047 A - -
HORZ(TL):0.088 A - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.605
Max Web CSI:0.657
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T36
Ply: 1
Qty:7
SEQN:166286 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T26
DrwNo:116.21.1010.24627
AK /WHK 04/26/2021
16'0"2
5'6"1
5'6"1
10'5"14
4'11"13
16'0"2
5'6"4
5'9"9
5'9"9
10'7"10
4'10"1
15'4"12
4'9"2
16'0"2
7"62'5'0"84"8 7'0"811'5"
9'5"
A
B
C
DE
FG
512
2.5
12
1.5X4
6X6
3X4
5X5
3X4
1.5X4
2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; M1 2x4 SP 2250f-1.9E;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 442 /-/-/327 /332 /298
C 449 /-/-/281 /191 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
C Brg Width = 6.6 Min Req =1.5
Bearings G & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 404 -1202
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 497 -147
E - D 1097 -318
Chords Tens.Comp.
D - C 1096 -314
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 304 -448
A - E 426 -70
Webs Tens.Comp.
F - G 323 -442
E - B 772 -863
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.047 D 999 360
VERT(CL):0.088 D 999 240
HORZ(LL):0.345 B - -
HORZ(TL):0.388 B - -
Creep Factor: 2.0
Max TC CSI:0.458
Max BC CSI:0.404
Max Web CSI:0.711
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:166289 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T61
DrwNo:116.21.1029.34257
AK /WHK 04/26/2021
M1
11'10"8
6'4"4
6'4"4
11'10"8
5'6"4
3"8
3"8
1'7"15
1'4"7
6'6"
4'10"1
11'3"2
4'9"2
11'10"8
7"65'3"144"82'9'5"
A
B
CD
EF
G
512
2.5
12
4X4
3X3
5X5
3X4
1.5X4
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; M1 2x4 SP 2250f-1.9E;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 442 /-/-/327 /332 /298
C 449 /-/-/281 /191 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
C Brg Width = 6.6 Min Req =1.5
Bearings G & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 404 -1202
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 497 -147
E - D 1097 -318
Chords Tens.Comp.
D - C 1096 -314
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 304 -448
A - E 426 -70
Webs Tens.Comp.
F - G 323 -442
E - B 772 -863
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.047 D 999 360
VERT(CL):0.088 D 999 240
HORZ(LL):0.345 B - -
HORZ(TL):0.388 B - -
Creep Factor: 2.0
Max TC CSI:0.458
Max BC CSI:0.404
Max Web CSI:0.711
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:166289 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T61
DrwNo:116.21.1029.34257
AK /WHK 04/26/2021
M1
11'10"8
6'4"4
6'4"4
11'10"8
5'6"4
3"8
3"8
1'7"15
1'4"7
6'6"
4'10"1
11'3"2
4'9"2
11'10"8
7"65'3"144"82'9'5"
A
B
CD
EF
G
512
2.5
12
4X4
3X3
5X5
3X4
1.5X4
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 4.94
TC: From 28 plf at 4.94 to 28 plf at 16.06
TC: From 55 plf at 16.06 to 55 plf at 22.00
BC: From 20 plf at 0.00 to 20 plf at 4.97
BC: From 10 plf at 4.97 to 10 plf at 16.03
BC: From 20 plf at 16.03 to 20 plf at 21.00
BC: From 4 plf at 21.00 to 4 plf at 22.00
TC: 308 lb Conc. Load at 4.97,16.03
TC: 116 lb Conc. Load at 7.00, 9.00,11.00,13.00
15.00
BC: 176 lb Conc. Load at 4.97,16.03
BC: 87 lb Conc. Load at 7.00, 9.00,11.00,13.00
15.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1546 /-/-/-/928 /-
E 1658 /-/-/-/1016 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
E Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2092 -3447
B - C 2626 -4322
Chords Tens.Comp.
C - D 2626 -4322
D - E 2159 -3562
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 3135 -1890
I - H 3155 -1885
Chords Tens.Comp.
H - G 3262 -1946
G - E 3239 -1951
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 1247 -792
C - H 545 -519
Webs Tens.Comp.
H - D 1133 -727
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.190 C 999 360
VERT(CL):0.348 C 714 240
HORZ(LL):0.042 G - -
HORZ(TL):0.078 G - -
Creep Factor: 2.0
Max TC CSI:0.555
Max BC CSI:0.474
Max Web CSI:0.450
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T38
Ply: 1
Qty:1
SEQN:166301 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T64
DrwNo:116.21.1010.32713
AK /WHK 04/26/2021
T2
21'
4'11"4
4'11"4
10'6"
5'6"12
16'0"12
5'6"12
21'
4'11"4
5'1"
5'1"
10'6"
5'5"
15'11"
5'5"
21'
5'1"1'
4"12'4"122'9"89'5"
A
B C D
E
F
GHI
5
12
3X8(B1)
5X10
1.5X4
2X4
5X8 1.5X4
6X8
3X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 4.94
TC: From 28 plf at 4.94 to 28 plf at 16.06
TC: From 55 plf at 16.06 to 55 plf at 22.00
BC: From 20 plf at 0.00 to 20 plf at 4.97
BC: From 10 plf at 4.97 to 10 plf at 16.03
BC: From 20 plf at 16.03 to 20 plf at 21.00
BC: From 4 plf at 21.00 to 4 plf at 22.00
TC: 308 lb Conc. Load at 4.97,16.03
TC: 116 lb Conc. Load at 7.00, 9.00,11.00,13.00
15.00
BC: 176 lb Conc. Load at 4.97,16.03
BC: 87 lb Conc. Load at 7.00, 9.00,11.00,13.00
15.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1546 /-/-/-/928 /-
E 1658 /-/-/-/1016 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
E Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2092 -3447
B - C 2626 -4322
Chords Tens.Comp.
C - D 2626 -4322
D - E 2159 -3562
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 3135 -1890
I - H 3155 -1885
Chords Tens.Comp.
H - G 3262 -1946
G - E 3239 -1951
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 1247 -792
C - H 545 -519
Webs Tens.Comp.
H - D 1133 -727
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.190 C 999 360
VERT(CL):0.348 C 714 240
HORZ(LL):0.042 G - -
HORZ(TL):0.078 G - -
Creep Factor: 2.0
Max TC CSI:0.555
Max BC CSI:0.474
Max Web CSI:0.450
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T38
Ply: 1
Qty:1
SEQN:166301 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T64
DrwNo:116.21.1010.32713
AK /WHK 04/26/2021
T2
21'
4'11"4
4'11"4
10'6"
5'6"12
16'0"12
5'6"12
21'
4'11"4
5'1"
5'1"
10'6"
5'5"
15'11"
5'5"
21'
5'1"1'
4"12'4"122'9"89'5"
A
B C D
E
F
GHI
5
12
3X8(B1)
5X10
1.5X4
2X4
5X8 1.5X4
6X8
3X8(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 776 /-/-/431 /452 /128
E 839 /-/-/502 /495 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
E Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 803 -1377
B - C 866 -1327
Chords Tens.Comp.
C - D 866 -1327
D - E 826 -1417
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 1206 -617
I - H 1211 -615
Chords Tens.Comp.
H - G 1255 -640
G - E 1248 -641
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.058 C 999 360
VERT(CL):0.108 C 999 240
HORZ(LL):0.021 G - -
HORZ(TL):0.039 G - -
Creep Factor: 2.0
Max TC CSI:0.499
Max BC CSI:0.503
Max Web CSI:0.057
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T39
Ply: 1
Qty:1
SEQN:166305 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T66
DrwNo:116.21.1011.05490
AK /WHK 04/26/2021
20'8"6
6'7"10
6'7"10
10'2"6
3'6"12
13'9"2
3'6"12
20'8"6
6'11"4
6'9"6
6'9"6
10'2"6
3'5"
13'7"6
3'5"
20'8"6
7'1"1'
5"9 4"13'2"123'7"89'5"
A
B C D
E
F
GHI
5
12
2X5(B1)
4X7
1.5X4
1.5X4
5X8 1.5X4
4X7
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 776 /-/-/431 /452 /128
E 839 /-/-/502 /495 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
E Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 803 -1377
B - C 866 -1327
Chords Tens.Comp.
C - D 866 -1327
D - E 826 -1417
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 1206 -617
I - H 1211 -615
Chords Tens.Comp.
H - G 1255 -640
G - E 1248 -641
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.058 C 999 360
VERT(CL):0.108 C 999 240
HORZ(LL):0.021 G - -
HORZ(TL):0.039 G - -
Creep Factor: 2.0
Max TC CSI:0.499
Max BC CSI:0.503
Max Web CSI:0.057
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T39
Ply: 1
Qty:1
SEQN:166305 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T66
DrwNo:116.21.1011.05490
AK /WHK 04/26/2021
20'8"6
6'7"10
6'7"10
10'2"6
3'6"12
13'9"2
3'6"12
20'8"6
6'11"4
6'9"6
6'9"6
10'2"6
3'5"
13'7"6
3'5"
20'8"6
7'1"1'
5"9 4"13'2"123'7"89'5"
A
B C D
E
F
GHI
5
12
2X5(B1)
4X7
1.5X4
1.5X4
5X8 1.5X4
4X7
2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 773 /-/-/392 /452 /162
G 842 /-/-/506 /493 /-
Wind reactions based on MWFRS
M Brg Width = 3.5 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings M & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 744 -1287
C - D 722 -1220
D - E 706 -1056
Chords Tens.Comp.
E - F 713 -1183
F - G 928 -1494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1456 -787
J - I 1066 -493
Chords Tens.Comp.
I - G 1346 -764
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 432 -763
B - K 1484 -858
Webs Tens.Comp.
K - C 517 -675
C - J 299 -397
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 I 999 360
VERT(CL):0.102 I 999 240
HORZ(LL):0.021 I - -
HORZ(TL):0.040 I - -
Creep Factor: 2.0
Max TC CSI:0.463
Max BC CSI:0.694
Max Web CSI:0.335
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T40
Ply: 1
Qty:1
SEQN:166309 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T67
DrwNo:116.21.1011.08400
AK /WHK 04/26/2021
20'8"6
4"4
4"4
2'3"10
1'11"6
8'7"10
6'4"
11'9"2
3'1"8
15'10"14
4'1"12
20'8"6
4'9"8
2"8
2"8
2'0"2
1'9"10
8'7"10
6'7"8
11'7"6
2'11"12
20'8"6
9'1"1'1'5"14"14'0"124'5"89'5"
A B C
D E
F
G
H
IJKLM
5
12
4X4
1.5X6 4X4
5X5
4X7
3X4 5X8
4X4
1.5X4
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 773 /-/-/392 /452 /162
G 842 /-/-/506 /493 /-
Wind reactions based on MWFRS
M Brg Width = 3.5 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings M & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 744 -1287
C - D 722 -1220
D - E 706 -1056
Chords Tens.Comp.
E - F 713 -1183
F - G 928 -1494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1456 -787
J - I 1066 -493
Chords Tens.Comp.
I - G 1346 -764
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 432 -763
B - K 1484 -858
Webs Tens.Comp.
K - C 517 -675
C - J 299 -397
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 I 999 360
VERT(CL):0.102 I 999 240
HORZ(LL):0.021 I - -
HORZ(TL):0.040 I - -
Creep Factor: 2.0
Max TC CSI:0.463
Max BC CSI:0.694
Max Web CSI:0.335
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T40
Ply: 1
Qty:1
SEQN:166309 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T67
DrwNo:116.21.1011.08400
AK /WHK 04/26/2021
20'8"6
4"4
4"4
2'3"10
1'11"6
8'7"10
6'4"
11'9"2
3'1"8
15'10"14
4'1"12
20'8"6
4'9"8
2"8
2"8
2'0"2
1'9"10
8'7"10
6'7"8
11'7"6
2'11"12
20'8"6
9'1"1'1'5"14"14'0"124'5"89'5"
A B C
D E
F
G
H
IJKLM
5
12
4X4
1.5X6 4X4
5X5
4X7
3X4 5X8
4X4
1.5X4
2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.28" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 1059 /-/-/376 /455 /191
K 1122 /-/-/508 /486 /-
Wind reactions based on MWFRS
R Brg Width = 3.5 Min Req =1.5
K Brg Width = 7.6 Min Req =1.5
Bearings R & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 824 -2040
C - D 767 -2085
D - E 706 -1628
E - F 1260 -366
F - G 1258 -369
Chords Tens.Comp.
G - H 703 -1630
H - I 760 -2034
I - J 753 -2045
J - K 903 -2284
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 2046 -685
O - N 1666 -482
Chords Tens.Comp.
N - M 2071 -746
M - K 2072 -747
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 463 -1009
B - P 2222 -894
C - P 393 -1149
C - O 306 -629
Webs Tens.Comp.
O - D 1086 -191
E - G 1161 -3030
H - N 998 -184
N - J 378 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.276 N 889 360
VERT(CL):0.439 N 560 240
HORZ(LL):0.084 D - -
HORZ(TL):0.138 D - -
Creep Factor: 2.0
Max TC CSI:0.987
Max BC CSI:0.898
Max Web CSI:0.502
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T41
Ply: 1
Qty:1
SEQN:166312 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T73
DrwNo:116.21.1011.11770
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'3"10
3'11"6
6'0"2
1'8"8
10'2"6
4'2"4
14'4"10
4'2"4
15'7"14
1'3"4
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'2'3"14"12'0"144'8"95'1"59'5"
A B C
D
E F G
H
I J
K
L
MNOPQR
5
12
5X5
1.5X6
7X6
6X12 4X4
3X8
3X5
SS0508
3X5
3X6
3X5
5X5
5X5
3X4
3X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.28" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 1059 /-/-/376 /455 /191
K 1122 /-/-/508 /486 /-
Wind reactions based on MWFRS
R Brg Width = 3.5 Min Req =1.5
K Brg Width = 7.6 Min Req =1.5
Bearings R & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 824 -2040
C - D 767 -2085
D - E 706 -1628
E - F 1260 -366
F - G 1258 -369
Chords Tens.Comp.
G - H 703 -1630
H - I 760 -2034
I - J 753 -2045
J - K 903 -2284
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 2046 -685
O - N 1666 -482
Chords Tens.Comp.
N - M 2071 -746
M - K 2072 -747
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 463 -1009
B - P 2222 -894
C - P 393 -1149
C - O 306 -629
Webs Tens.Comp.
O - D 1086 -191
E - G 1161 -3030
H - N 998 -184
N - J 378 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.276 N 889 360
VERT(CL):0.439 N 560 240
HORZ(LL):0.084 D - -
HORZ(TL):0.138 D - -
Creep Factor: 2.0
Max TC CSI:0.987
Max BC CSI:0.898
Max Web CSI:0.502
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T41
Ply: 1
Qty:1
SEQN:166312 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T73
DrwNo:116.21.1011.11770
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'3"10
3'11"6
6'0"2
1'8"8
10'2"6
4'2"4
14'4"10
4'2"4
15'7"14
1'3"4
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'2'3"14"12'0"144'8"95'1"59'5"
A B C
D
E F G
H
I J
K
L
MNOPQR
5
12
5X5
1.5X6
7X6
6X12 4X4
3X8
3X5
SS0508
3X5
3X6
3X5
5X5
5X5
3X4
3X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.27" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1059 /-/-/374 /451 /196
M 1122 /-/-/521 /475 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
M Brg Width = 7.6 Min Req =1.5
Bearings T & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 564 -1405
C - F 557 -1414
D - E 150 -657
E - F 184 -474
F - G 677 -1623
G - H 1248 -330
Chords Tens.Comp.
H - I 1244 -336
I - J 672 -1629
J - K 724 -2031
K - L 717 -2042
L - M 877 -2284
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1351 -358
Q - P 1665 -450
Chords Tens.Comp.
P - O 2071 -722
O - M 2071 -723
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 461 -1015
B - R 1666 -667
D - R 393 -1110
D - Q 581 -137
Webs Tens.Comp.
Q - E 415 0
G - I 1091 -3014
J - P 991 -173
P - L 391 -638
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.267 P 919 360
VERT(CL):0.428 P 574 240
HORZ(LL):0.099 A - -
HORZ(TL):0.161 A - -
Creep Factor: 2.0
Max TC CSI:0.979
Max BC CSI:0.896
Max Web CSI:0.376
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T42
Ply: 1
Qty:1
SEQN:166317 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T72
DrwNo:116.21.1011.25157
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'1"14
3'9"10
6'3"10
2'1"12
10'2"6
3'10"12
14'4"10
4'2"4
15'7"14
1'3"4
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'3'1"14"12'0"144'8"95'1"59'5"
A B CD E F
G H I
J
K L
M
N
OPQRST
5
12
4X5
1.5X6
1.5X45X6
5X14 4X4
2X42X4
3X5
SS0508
3X5
3X6
3X5
5X5
5X5
3X4
3X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.27" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1059 /-/-/374 /451 /196
M 1122 /-/-/521 /475 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
M Brg Width = 7.6 Min Req =1.5
Bearings T & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 564 -1405
C - F 557 -1414
D - E 150 -657
E - F 184 -474
F - G 677 -1623
G - H 1248 -330
Chords Tens.Comp.
H - I 1244 -336
I - J 672 -1629
J - K 724 -2031
K - L 717 -2042
L - M 877 -2284
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1351 -358
Q - P 1665 -450
Chords Tens.Comp.
P - O 2071 -722
O - M 2071 -723
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 461 -1015
B - R 1666 -667
D - R 393 -1110
D - Q 581 -137
Webs Tens.Comp.
Q - E 415 0
G - I 1091 -3014
J - P 991 -173
P - L 391 -638
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.267 P 919 360
VERT(CL):0.428 P 574 240
HORZ(LL):0.099 A - -
HORZ(TL):0.161 A - -
Creep Factor: 2.0
Max TC CSI:0.979
Max BC CSI:0.896
Max Web CSI:0.376
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T42
Ply: 1
Qty:1
SEQN:166317 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T72
DrwNo:116.21.1011.25157
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'1"14
3'9"10
6'3"10
2'1"12
10'2"6
3'10"12
14'4"10
4'2"4
15'7"14
1'3"4
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'3'1"14"12'0"144'8"95'1"59'5"
A B CD E F
G H I
J
K L
M
N
OPQRST
5
12
4X5
1.5X6
1.5X45X6
5X14 4X4
2X42X4
3X5
SS0508
3X5
3X6
3X5
5X5
5X5
3X4
3X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.25" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1059 /-/-/399 /461 /237
M 1122 /-/-/539 /466 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
M Brg Width = 7.6 Min Req =1.5
Bearings T & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 453 -1093
C - F 441 -1115
D - E 214 -744
E - F 267 -620
F - G 635 -1528
G - H 960 -200
Chords Tens.Comp.
H - I 918 -196
I - J 639 -1616
J - K 673 -1974
K - L 666 -1985
L - M 853 -2281
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1021 -208
Q - P 1629 -409
Chords Tens.Comp.
P - O 2069 -701
O - M 2069 -701
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 471 -1022
B - R 1425 -590
D - R 484 -1264
D - Q 929 -275
Webs Tens.Comp.
G - I 905 -2647
J - P 877 -125
P - L 421 -678
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.251 P 978 360
VERT(CL):0.407 P 604 240
HORZ(LL):-0.064 J - -
HORZ(TL):0.113 J - -
Creep Factor: 2.0
Max TC CSI:0.873
Max BC CSI:0.987
Max Web CSI:0.322
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T43
Ply: 1
Qty:1
SEQN:166322 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T69
DrwNo:116.21.1011.40730
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'1"14
3'9"10
8'3"10
4'1"12
10'2"6
1'10"12
14'4"10
4'2"4
15'7"14
1'3"4
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'3'11"14"12'0"144'8"95'1"59'5"
A B C
D
E F
G H I
J
K L
M
N
OPQRST
5 12
4X4
1.5X6
1.5X4
4X65X14 4X5
1.5X4
2X4
3X5(**)
H05103X5(**)
3X6
3X4
5X5
5X5
3X4
3X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.25" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1059 /-/-/399 /461 /237
M 1122 /-/-/539 /466 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
M Brg Width = 7.6 Min Req =1.5
Bearings T & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 453 -1093
C - F 441 -1115
D - E 214 -744
E - F 267 -620
F - G 635 -1528
G - H 960 -200
Chords Tens.Comp.
H - I 918 -196
I - J 639 -1616
J - K 673 -1974
K - L 666 -1985
L - M 853 -2281
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1021 -208
Q - P 1629 -409
Chords Tens.Comp.
P - O 2069 -701
O - M 2069 -701
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 471 -1022
B - R 1425 -590
D - R 484 -1264
D - Q 929 -275
Webs Tens.Comp.
G - I 905 -2647
J - P 877 -125
P - L 421 -678
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.251 P 978 360
VERT(CL):0.407 P 604 240
HORZ(LL):-0.064 J - -
HORZ(TL):0.113 J - -
Creep Factor: 2.0
Max TC CSI:0.873
Max BC CSI:0.987
Max Web CSI:0.322
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T43
Ply: 1
Qty:1
SEQN:166322 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T69
DrwNo:116.21.1011.40730
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'1"14
3'9"10
8'3"10
4'1"12
10'2"6
1'10"12
14'4"10
4'2"4
15'7"14
1'3"4
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'3'11"14"12'0"144'8"95'1"59'5"
A B C
D
E F
G H I
J
K L
M
N
OPQRST
5 12
4X4
1.5X6
1.5X4
4X65X14 4X5
1.5X4
2X4
3X5(**)
H05103X5(**)
3X6
3X4
5X5
5X5
3X4
3X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 178 /-/-/147 /95 /80
D 41 /-/-/23 /-/-
C 48 /-/-/26 /54 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.041
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T44
Ply: 1
Qty:1
SEQN:166202 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T44
DrwNo:116.21.1011.52967
AK /WHK 04/26/2021
2'6"1
2'6"11'0"6
4"1 1'4"31'8"149'5"
10'5"11
A
B
C
D
4.84
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 178 /-/-/147 /95 /80
D 41 /-/-/23 /-/-
C 48 /-/-/26 /54 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.041
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T44
Ply: 1
Qty:1
SEQN:166202 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T44
DrwNo:116.21.1011.52967
AK /WHK 04/26/2021
2'6"1
2'6"11'0"6
4"1 1'4"31'8"149'5"
10'5"11
A
B
C
D
4.84
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.26" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1059 /-/-/418 /482 /285
I 1122 /-/-/560 /464 /-
Wind reactions based on MWFRS
P Brg Width = 3.5 Min Req =1.5
I Brg Width = 7.6 Min Req =1.5
Bearings P & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 401 -903
C - D 378 -897
D - E 675 -71
E - F 606 -1541
Chords Tens.Comp.
F - G 608 -1833
G - H 601 -1844
H - I 847 -2279
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 866 -153
M - L 1516 -358
Chords Tens.Comp.
L - K 2067 -695
K - I 2066 -695
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 488 -1021
B - N 1305 -579
Q - N 637 -1480
Q - M 984 -327
Q - R 278 -841
M - R 485 0
Webs Tens.Comp.
R - S 286 -633
S - D 1319 -161
S - E 529 -2232
F - L 712 -45
L - H 493 -791
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.263 F 934 360
VERT(CL):0.419 F 586 240
HORZ(LL):-0.074 F - -
HORZ(TL):0.121 F - -
Creep Factor: 2.0
Max TC CSI:0.807
Max BC CSI:0.619
Max Web CSI:0.359
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T44
Ply: 1
Qty:1
SEQN:166327 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T60
DrwNo:116.21.1011.59220
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'3"10
3'11"6
10'2"6
5'10"12
15'7"14
5'5"8
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'4'9"14"14'8"92'3"12'0"145'1"139'5"
A B C D E
F
G H
I
J
KLMNOP
Q R
S
5
124X4
1.5X6
1.5X4
4X65X12 5X6
1.5X6 2X55X6 2X5
2X6
3X4
5X5
5X5
3X4
3X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 6-1-14 to 14-2-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.26" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1059 /-/-/418 /482 /285
I 1122 /-/-/560 /464 /-
Wind reactions based on MWFRS
P Brg Width = 3.5 Min Req =1.5
I Brg Width = 7.6 Min Req =1.5
Bearings P & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 401 -903
C - D 378 -897
D - E 675 -71
E - F 606 -1541
Chords Tens.Comp.
F - G 608 -1833
G - H 601 -1844
H - I 847 -2279
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 866 -153
M - L 1516 -358
Chords Tens.Comp.
L - K 2067 -695
K - I 2066 -695
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 488 -1021
B - N 1305 -579
Q - N 637 -1480
Q - M 984 -327
Q - R 278 -841
M - R 485 0
Webs Tens.Comp.
R - S 286 -633
S - D 1319 -161
S - E 529 -2232
F - L 712 -45
L - H 493 -791
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.263 F 934 360
VERT(CL):0.419 F 586 240
HORZ(LL):-0.074 F - -
HORZ(TL):0.121 F - -
Creep Factor: 2.0
Max TC CSI:0.807
Max BC CSI:0.619
Max Web CSI:0.359
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T44
Ply: 1
Qty:1
SEQN:166327 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T60
DrwNo:116.21.1011.59220
AK /WHK 04/26/2021
T2
T3
B2
8'1"3'4"1220'8"6
4"4
4"4
4'3"10
3'11"6
10'2"6
5'10"12
15'7"14
5'5"8
16'2"6
6"8
20'8"6
4'6"
2"8
2"8
4'3"10
4'1"2
16'2"6
11'10"12
20'8"6
4'6"1'4'9"14"14'8"92'3"12'0"145'1"139'5"
A B C D E
F
G H
I
J
KLMNOP
Q R
S
5
124X4
1.5X6
1.5X4
4X65X12 5X6
1.5X6 2X55X6 2X5
2X6
3X4
5X5
5X5
3X4
3X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 187 /-/-/151 /99 /87
D 46 /-/-/25 /-/-
C 56 /-/-/32 /62 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.054
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T45
Ply: 1
Qty:1
SEQN:166203 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T45
DrwNo:116.21.1012.01100
AK /WHK 04/26/2021
2'9"5
2'9"51'0"6
4"1 1'5"81'10"39'5"
10'7"
A
B
C
D
4.84
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 187 /-/-/151 /99 /87
D 46 /-/-/25 /-/-
C 56 /-/-/32 /62 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.054
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T45
Ply: 1
Qty:1
SEQN:166203 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T45
DrwNo:116.21.1012.01100
AK /WHK 04/26/2021
2'9"5
2'9"51'0"6
4"1 1'5"81'10"39'5"
10'7"
A
B
C
D
4.84
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 7-7-0 to 15-8-0: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.25" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 1094 /-/-/462 /525 /337
J 1194 /-/-/602 /488 /-
Wind reactions based on MWFRS
Q Brg Width = 3.5 Min Req =1.5
J Brg Width = 7.6 Min Req =1.5
Bearings Q & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 450 -988
E - F 150 -393
F - G 688 -1772
Chords Tens.Comp.
G - H 702 -2044
H - I 695 -2055
I - J 905 -2453
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 1739 -444
N - M 1734 -447
Chords Tens.Comp.
M - L 2226 -748
L - J 2224 -748
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 541 -1046
B - O 1347 -613
C - O 582 -270
C - R 849 -1104
O - R 830 -1956
Webs Tens.Comp.
R - N 1071 -114
R - S 729 -1509
S - F 741 -1534
G - M 658 -75
M - I 439 -714
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.254 G 999 360
VERT(CL):0.408 G 644 240
HORZ(LL):-0.068 G - -
HORZ(TL):0.111 G - -
Creep Factor: 2.0
Max TC CSI:0.734
Max BC CSI:0.665
Max Web CSI:0.635
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T45
Ply: 1
Qty:1
SEQN:166330 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T68
DrwNo:116.21.1012.23283
AK /WHK 04/26/2021
T2
B2
8'1"3'4"1222'1"8
4"4
4"4
5'8"12
5'4"8
7'5"4
1'8"8
9'6"4
2'1"
12'1"12
2'7"8
15'9"12
3'8"
17'1"3
1'3"7
17'7"8
6"5
22'1"8
4'6"
2"8
2"8
5'8"12
5'6"4
17'7"8
11'10"12
22'1"8
4'6"1'5'7"14"14'10"12'0"145'11"139'5"
A B C D E
F
G
H I
J
K
LMNOPQ
R S
512
4X4
1.5X6
3X4
8X10
1.5X45X8
3X8
1.5X45X8
3X3
2X6
3X4
4X4
5X5
3X4
4X4(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 7-7-0 to 15-8-0: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.25" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 1094 /-/-/462 /525 /337
J 1194 /-/-/602 /488 /-
Wind reactions based on MWFRS
Q Brg Width = 3.5 Min Req =1.5
J Brg Width = 7.6 Min Req =1.5
Bearings Q & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 450 -988
E - F 150 -393
F - G 688 -1772
Chords Tens.Comp.
G - H 702 -2044
H - I 695 -2055
I - J 905 -2453
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 1739 -444
N - M 1734 -447
Chords Tens.Comp.
M - L 2226 -748
L - J 2224 -748
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 541 -1046
B - O 1347 -613
C - O 582 -270
C - R 849 -1104
O - R 830 -1956
Webs Tens.Comp.
R - N 1071 -114
R - S 729 -1509
S - F 741 -1534
G - M 658 -75
M - I 439 -714
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.254 G 999 360
VERT(CL):0.408 G 644 240
HORZ(LL):-0.068 G - -
HORZ(TL):0.111 G - -
Creep Factor: 2.0
Max TC CSI:0.734
Max BC CSI:0.665
Max Web CSI:0.635
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T45
Ply: 1
Qty:1
SEQN:166330 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T68
DrwNo:116.21.1012.23283
AK /WHK 04/26/2021
T2
B2
8'1"3'4"1222'1"8
4"4
4"4
5'8"12
5'4"8
7'5"4
1'8"8
9'6"4
2'1"
12'1"12
2'7"8
15'9"12
3'8"
17'1"3
1'3"7
17'7"8
6"5
22'1"8
4'6"
2"8
2"8
5'8"12
5'6"4
17'7"8
11'10"12
22'1"8
4'6"1'5'7"14"14'10"12'0"145'11"139'5"
A B C D E
F
G
H I
J
K
LMNOPQ
R S
512
4X4
1.5X6
3X4
8X10
1.5X45X8
3X8
1.5X45X8
3X3
2X6
3X4
4X4
5X5
3X4
4X4(A2)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 167 /-/-/142 /89 /75
D 35 /-/-/20 /0 /-
C 40 /-/-/22 /46 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.031
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T46
Ply: 1
Qty:1
SEQN:166204 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T46
DrwNo:116.21.1012.38283
AK /WHK 04/26/2021
2'2"8
2'2"81'
4"1 1'3"21'7"139'5"
10'4"10
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 167 /-/-/142 /89 /75
D 35 /-/-/20 /0 /-
C 40 /-/-/22 /46 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.031
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T46
Ply: 1
Qty:1
SEQN:166204 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T46
DrwNo:116.21.1012.38283
AK /WHK 04/26/2021
2'2"8
2'2"81'
4"1 1'3"21'7"139'5"
10'4"10
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 7-7-0 to 15-8-0: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.26" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1094 /-/-/485 /537 /386
I 1194 /-/-/611 /475 /-
Wind reactions based on MWFRS
P Brg Width = 3.5 Min Req =1.5
I Brg Width = 7.6 Min Req =1.5
Bearings P & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 399 -853
E - F 658 -1762
F - G 673 -2031
Chords Tens.Comp.
G - H 666 -2042
H - I 873 -2453
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 386 -125
N - M 1752 -421
M - L 1721 -420
Chords Tens.Comp.
L - K 2226 -718
K - I 2224 -718
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 553 -1046
B - N 1252 -585
C - N 758 -325
C - Q 820 -1177
N - Q 977 -2182
Webs Tens.Comp.
Q - M 1082 -107
Q - E 943 -1647
F - L 654 -75
L - H 434 -731
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.263 F 999 360
VERT(CL):0.420 F 625 240
HORZ(LL):-0.071 F - -
HORZ(TL):0.116 F - -
Creep Factor: 2.0
Max TC CSI:0.738
Max BC CSI:0.665
Max Web CSI:0.713
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T46
Ply: 1
Qty:1
SEQN:166334 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T74
DrwNo:116.21.1012.42753
AK /WHK 04/26/2021
T2
B2
8'1"3'4"1222'1"8
4"4
4"4
5'8"12
5'4"8
7'7"
1'10"4
12'1"12
4'6"12
17'1"3
4'11"7
17'7"8
6"5
22'1"8
4'6"
2"8
2"8
5'8"12
5'6"4
17'7"8
11'10"12
22'1"8
4'6"1'6'5"14"1 6'4"125'8"12'0"146'9"139'5"
A B C D
E
F
G H
I
J
KLMNOP
Q
512
4X4
1.5X6
3X4
8X10
5X8
3X8
5X5
3X4
2X6
3X4
4X4
5X5
3X4
4X4(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x6 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 7-7-0 to 15-8-0: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.26" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1094 /-/-/485 /537 /386
I 1194 /-/-/611 /475 /-
Wind reactions based on MWFRS
P Brg Width = 3.5 Min Req =1.5
I Brg Width = 7.6 Min Req =1.5
Bearings P & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 399 -853
E - F 658 -1762
F - G 673 -2031
Chords Tens.Comp.
G - H 666 -2042
H - I 873 -2453
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 386 -125
N - M 1752 -421
M - L 1721 -420
Chords Tens.Comp.
L - K 2226 -718
K - I 2224 -718
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 553 -1046
B - N 1252 -585
C - N 758 -325
C - Q 820 -1177
N - Q 977 -2182
Webs Tens.Comp.
Q - M 1082 -107
Q - E 943 -1647
F - L 654 -75
L - H 434 -731
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.263 F 999 360
VERT(CL):0.420 F 625 240
HORZ(LL):-0.071 F - -
HORZ(TL):0.116 F - -
Creep Factor: 2.0
Max TC CSI:0.738
Max BC CSI:0.665
Max Web CSI:0.713
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T46
Ply: 1
Qty:1
SEQN:166334 HIPM
FROM:
Cust: R 761 JRef:1X4V7610002 T74
DrwNo:116.21.1012.42753
AK /WHK 04/26/2021
T2
B2
8'1"3'4"1222'1"8
4"4
4"4
5'8"12
5'4"8
7'7"
1'10"4
12'1"12
4'6"12
17'1"3
4'11"7
17'7"8
6"5
22'1"8
4'6"
2"8
2"8
5'8"12
5'6"4
17'7"8
11'10"12
22'1"8
4'6"1'6'5"14"1 6'4"125'8"12'0"146'9"139'5"
A B C D
E
F
G H
I
J
KLMNOP
Q
512
4X4
1.5X6
3X4
8X10
5X8
3X8
5X5
3X4
2X6
3X4
4X4
5X5
3X4
4X4(A2)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 167 /-/-/142 /89 /75
D 35 /-/-/20 /0 /-
C 40 /-/-/22 /46 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.031
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T47
Ply: 1
Qty:1
SEQN:166205 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T47
DrwNo:116.21.1012.45220
AK /WHK 04/26/2021
2'2"8
2'2"81'
4"1 1'3"21'7"139'5"
10'4"10
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 167 /-/-/142 /89 /75
D 35 /-/-/20 /0 /-
C 40 /-/-/22 /46 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.031
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T47
Ply: 1
Qty:1
SEQN:166205 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T47
DrwNo:116.21.1012.45220
AK /WHK 04/26/2021
2'2"8
2'2"81'
4"1 1'3"21'7"139'5"
10'4"10
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.50
TC: From 28 plf at 2.50 to 28 plf at 8.17
TC: From 55 plf at 8.17 to 55 plf at 11.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.53
BC: From 10 plf at 2.53 to 10 plf at 8.14
BC: From 20 plf at 8.14 to 20 plf at 10.67
BC: From 4 plf at 10.67 to 4 plf at 11.67
TC: 77 lb Conc. Load at 2.53, 8.14
TC: 49 lb Conc. Load at 4.56, 6.10
BC: 98 lb Conc. Load at 2.53, 8.14
BC: 41 lb Conc. Load at 4.56, 6.10
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 619 /-/-/-/354 /-
F 619 /-/-/-/354 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 555 -1050
C - D 693 -1288
Chords Tens.Comp.
D - E 693 -1288
E - F 555 -1050
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 942 -489
J - I 957 -485
Chords Tens.Comp.
I - H 957 -485
H - F 942 -489
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.035 D 999 360
VERT(CL):0.063 D 999 240
HORZ(LL):0.008 H - -
HORZ(TL):0.015 H - -
Creep Factor: 2.0
Max TC CSI:0.182
Max BC CSI:0.301
Max Web CSI:0.080
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T47
Ply: 1
Qty:1
SEQN:166238 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T81
DrwNo:116.21.1012.47873
AK /WHK 04/26/2021
10'8"
2'6"
2'6"
5'4"
2'10"
8'2"
2'10"
10'8"
2'6"
2'7"12
2'7"12
5'4"
2'8"4
8'0"4
2'8"4
10'8"
2'7"121'1'
4"11'4"91'9"512'9"A
B
C D E
F
G
HIJ
5
12
2X4(A1)
4X7
1.5X4
1.5X4
3X8 1.5X4
4X7
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.50
TC: From 28 plf at 2.50 to 28 plf at 8.17
TC: From 55 plf at 8.17 to 55 plf at 11.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.53
BC: From 10 plf at 2.53 to 10 plf at 8.14
BC: From 20 plf at 8.14 to 20 plf at 10.67
BC: From 4 plf at 10.67 to 4 plf at 11.67
TC: 77 lb Conc. Load at 2.53, 8.14
TC: 49 lb Conc. Load at 4.56, 6.10
BC: 98 lb Conc. Load at 2.53, 8.14
BC: 41 lb Conc. Load at 4.56, 6.10
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 619 /-/-/-/354 /-
F 619 /-/-/-/354 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 555 -1050
C - D 693 -1288
Chords Tens.Comp.
D - E 693 -1288
E - F 555 -1050
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 942 -489
J - I 957 -485
Chords Tens.Comp.
I - H 957 -485
H - F 942 -489
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.035 D 999 360
VERT(CL):0.063 D 999 240
HORZ(LL):0.008 H - -
HORZ(TL):0.015 H - -
Creep Factor: 2.0
Max TC CSI:0.182
Max BC CSI:0.301
Max Web CSI:0.080
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T47
Ply: 1
Qty:1
SEQN:166238 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T81
DrwNo:116.21.1012.47873
AK /WHK 04/26/2021
10'8"
2'6"
2'6"
5'4"
2'10"
8'2"
2'10"
10'8"
2'6"
2'7"12
2'7"12
5'4"
2'8"4
8'0"4
2'8"4
10'8"
2'7"121'1'
4"11'4"91'9"512'9"A
B
C D E
F
G
HIJ
5
12
2X4(A1)
4X7
1.5X4
1.5X4
3X8 1.5X4
4X7
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 187 /-/-/151 /99 /87
D 46 /-/-/25 /-/-
C 56 /-/-/32 /62 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.054
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T48
Ply: 1
Qty:1
SEQN:166206 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T48
DrwNo:116.21.1012.49667
AK /WHK 04/26/2021
2'9"5
2'9"51'0"6
4"1 1'5"81'10"39'5"
10'7"
A
B
C
D
4.84
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 187 /-/-/151 /99 /87
D 46 /-/-/25 /-/-
C 56 /-/-/32 /62 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.054
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T48
Ply: 1
Qty:1
SEQN:166206 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T48
DrwNo:116.21.1012.49667
AK /WHK 04/26/2021
2'9"5
2'9"51'0"6
4"1 1'5"81'10"39'5"
10'7"
A
B
C
D
4.84
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 465 /-/-/292 /275 /92
E 396 /-/-/224 /228 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 364 -617
C - D 377 -563
Chords Tens.Comp.
D - E 367 -621
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 532 -267
Chords Tens.Comp.
F - E 539 -272
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.011 F 999 360
VERT(CL):0.021 F 999 240
HORZ(LL):0.004 F - -
HORZ(TL):0.008 F - -
Creep Factor: 2.0
Max TC CSI:0.199
Max BC CSI:0.271
Max Web CSI:0.028
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T48
Ply: 1
Qty:1
SEQN:166226 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T80
DrwNo:116.21.1012.51957
AK /WHK 04/26/2021
10'8"
4'6"
4'6"
6'2"
1'8"
10'8"
4'6"
5'4"
5'4"
10'8"
5'4"1'
4"12'2"92'7"512'9"A
B
C D
E
F
5
12
2X4(A1)
4X4
5X5
4X4
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 465 /-/-/292 /275 /92
E 396 /-/-/224 /228 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 364 -617
C - D 377 -563
Chords Tens.Comp.
D - E 367 -621
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 532 -267
Chords Tens.Comp.
F - E 539 -272
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.011 F 999 360
VERT(CL):0.021 F 999 240
HORZ(LL):0.004 F - -
HORZ(TL):0.008 F - -
Creep Factor: 2.0
Max TC CSI:0.199
Max BC CSI:0.271
Max Web CSI:0.028
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T48
Ply: 1
Qty:1
SEQN:166226 HIPS
FROM:
Cust: R 761 JRef:1X4V7610002 T80
DrwNo:116.21.1012.51957
AK /WHK 04/26/2021
10'8"
4'6"
4'6"
6'2"
1'8"
10'8"
4'6"
5'4"
5'4"
10'8"
5'4"1'
4"12'2"92'7"512'9"A
B
C D
E
F
5
12
2X4(A1)
4X4
5X5
4X4
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 178 /-/-/147 /95 /80
D 41 /-/-/23 /-/-
C 48 /-/-/26 /54 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.041
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T49
Ply: 1
Qty:1
SEQN:166207 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T49
DrwNo:116.21.1012.57113
AK /WHK 04/26/2021
2'6"1
2'6"11'0"6
4"1 1'4"31'8"149'5"
10'5"11
A
B
C
D
4.84
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 178 /-/-/147 /95 /80
D 41 /-/-/23 /-/-
C 48 /-/-/26 /54 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.071
Max BC CSI:0.041
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T49
Ply: 1
Qty:1
SEQN:166207 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T49
DrwNo:116.21.1012.57113
AK /WHK 04/26/2021
2'6"1
2'6"11'0"6
4"1 1'4"31'8"149'5"
10'5"11
A
B
C
D
4.84
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.26
TC: From 105 plf at 4.26 to 105 plf at 9.33
TC: From 78 plf at 9.33 to 78 plf at 15.14
TC: From 105 plf at 15.14 to 105 plf at 15.17
TC: From 55 plf at 15.17 to 55 plf at 19.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.73
BC: From 10 plf at 10.73 to 10 plf at 15.14
BC: From 20 plf at 15.14 to 20 plf at 18.67
BC: From 4 plf at 18.67 to 4 plf at 19.67
TC: 167 lb Conc. Load at 15.14
PLT: 118 lb Conc. Load at (10.73,14.51)
PLT: 77 lb Conc. Load at (11.10,14.51), (13.10,14.51)
BC: 164 lb Conc. Load at 10.73
BC: 60 lb Conc. Load at 11.10,13.10
BC: 100 lb Conc. Load at 15.14
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
See DWGS A18030ENC101014 & GBLLETIN0118
for more requirements.
++ This member shall be braced with properly
attached purlins or trusses at 24" o.c.
++
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1219 /-/-/-/798 /-
L 1467 /-/-/-/927 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 7.6 Min Req =1.7
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1598 -2454
C - D 1152 -1790
D - E 1125 -1764
E - F 1147 -1784
F - G 1120 -1755
Chords Tens.Comp.
G - H 1106 -1736
H - I 1144 -1787
I - J 1114 -1751
J - K 1211 -1848
K - L 1899 -3031
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 2224 -1439
R - Q 2224 -1432
Q - P 2397 -1586
Chords Tens.Comp.
P - O 2907 -1802
O - N 2758 -1706
N - L 2752 -1715
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 532 -764
S - T 538 -771
T - P 386 -474
P - X 633 -1058
Webs Tens.Comp.
G - V 1082 -630
V - P 947 -523
X - Y 773 -1318
Y - K 768 -1313
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.114 H 999 360
VERT(CL):0.196 H 999 240
HORZ(LL):0.043 N - -
HORZ(TL):0.075 N - -
Creep Factor: 2.0
Max TC CSI:0.498
Max BC CSI:0.942
Max Web CSI:0.244
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T49
Ply: 1
Qty:1
SEQN:166243 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T70
DrwNo:116.21.1016.28850
AK /WHK 04/26/2021
18'8"
5'4"2'8"
(TYP)
4'3"2
4'3"2
6'8"
2'4"14
9'4"
2'8"
12'
2'8"
15'1"5
3'1"5
18'8"
3'6"11
3'7"12
3'7"12
6'4"2
2'8"6
9'4"
2'11"14
12'3"14
2'11"14
15'0"4
2'8"6
18'8"
3'7"121'1'
4"14'2"124'7"712'9"A
B
C
D
E
F
G
H
I
J K
L
M
NOPQR
S T V X
Y
5
12
4X4(A2)
5X8
3X4
3X8
4X4
3X85X8
3X8
3X4
5X8
4X5(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.26
TC: From 105 plf at 4.26 to 105 plf at 9.33
TC: From 78 plf at 9.33 to 78 plf at 15.14
TC: From 105 plf at 15.14 to 105 plf at 15.17
TC: From 55 plf at 15.17 to 55 plf at 19.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.73
BC: From 10 plf at 10.73 to 10 plf at 15.14
BC: From 20 plf at 15.14 to 20 plf at 18.67
BC: From 4 plf at 18.67 to 4 plf at 19.67
TC: 167 lb Conc. Load at 15.14
PLT: 118 lb Conc. Load at (10.73,14.51)
PLT: 77 lb Conc. Load at (11.10,14.51), (13.10,14.51)
BC: 164 lb Conc. Load at 10.73
BC: 60 lb Conc. Load at 11.10,13.10
BC: 100 lb Conc. Load at 15.14
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
See DWGS A18030ENC101014 & GBLLETIN0118
for more requirements.
++ This member shall be braced with properly
attached purlins or trusses at 24" o.c.
++
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1219 /-/-/-/798 /-
L 1467 /-/-/-/927 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 7.6 Min Req =1.7
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1598 -2454
C - D 1152 -1790
D - E 1125 -1764
E - F 1147 -1784
F - G 1120 -1755
Chords Tens.Comp.
G - H 1106 -1736
H - I 1144 -1787
I - J 1114 -1751
J - K 1211 -1848
K - L 1899 -3031
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 2224 -1439
R - Q 2224 -1432
Q - P 2397 -1586
Chords Tens.Comp.
P - O 2907 -1802
O - N 2758 -1706
N - L 2752 -1715
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 532 -764
S - T 538 -771
T - P 386 -474
P - X 633 -1058
Webs Tens.Comp.
G - V 1082 -630
V - P 947 -523
X - Y 773 -1318
Y - K 768 -1313
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.114 H 999 360
VERT(CL):0.196 H 999 240
HORZ(LL):0.043 N - -
HORZ(TL):0.075 N - -
Creep Factor: 2.0
Max TC CSI:0.498
Max BC CSI:0.942
Max Web CSI:0.244
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T49
Ply: 1
Qty:1
SEQN:166243 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T70
DrwNo:116.21.1016.28850
AK /WHK 04/26/2021
18'8"
5'4"2'8"
(TYP)
4'3"2
4'3"2
6'8"
2'4"14
9'4"
2'8"
12'
2'8"
15'1"5
3'1"5
18'8"
3'6"11
3'7"12
3'7"12
6'4"2
2'8"6
9'4"
2'11"14
12'3"14
2'11"14
15'0"4
2'8"6
18'8"
3'7"121'1'
4"14'2"124'7"712'9"A
B
C
D
E
F
G
H
I
J K
L
M
NOPQR
S T V X
Y
5
12
4X4(A2)
5X8
3X4
3X8
4X4
3X85X8
3X8
3X4
5X8
4X5(A2)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 761 /-/-/452 /446 /182
F 761 /-/-/452 /446 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 802 -1288
C - D 587 -974
Chords Tens.Comp.
D - E 587 -974
E - F 802 -1288
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1154 -646
Chords Tens.Comp.
H - F 1154 -646
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 513 -220
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.045 H 999 360
VERT(CL):0.082 H 999 240
HORZ(LL):0.018 H - -
HORZ(TL):0.033 H - -
Creep Factor: 2.0
Max TC CSI:0.267
Max BC CSI:0.781
Max Web CSI:0.138
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T50
Ply: 1
Qty:1
SEQN:166246 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T79
DrwNo:116.21.1016.32890
AK /WHK 04/26/2021
18'8"
4'11"14
4'11"14
9'4"
4'4"2
13'8"2
4'4"2
18'8"
4'11"14
9'4"
9'4"
18'8"
9'4"1'1'
4"14'2"124'7"712'9"A
B
C
D
E
F
G
H
5
12
2X5(A1)
1.5X4
4X4
5X8
1.5X4
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 761 /-/-/452 /446 /182
F 761 /-/-/452 /446 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 802 -1288
C - D 587 -974
Chords Tens.Comp.
D - E 587 -974
E - F 802 -1288
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1154 -646
Chords Tens.Comp.
H - F 1154 -646
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 513 -220
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.045 H 999 360
VERT(CL):0.082 H 999 240
HORZ(LL):0.018 H - -
HORZ(TL):0.033 H - -
Creep Factor: 2.0
Max TC CSI:0.267
Max BC CSI:0.781
Max Web CSI:0.138
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:T50
Ply: 1
Qty:1
SEQN:166246 SPEC
FROM:
Cust: R 761 JRef:1X4V7610002 T79
DrwNo:116.21.1016.32890
AK /WHK 04/26/2021
18'8"
4'11"14
4'11"14
9'4"
4'4"2
13'8"2
4'4"2
18'8"
4'11"14
9'4"
9'4"
18'8"
9'4"1'1'
4"14'2"124'7"712'9"A
B
C
D
E
F
G
H
5
12
2X5(A1)
1.5X4
4X4
5X8
1.5X4
2X5(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*75 /-/-/31 /25 /5
Wind reactions based on MWFRS
D Brg Width = 46.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.72 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 999 360
VERT(CL):0.008 999 240
HORZ(LL):-0.001 - -
HORZ(TL):0.003 - -
Creep Factor: 2.0
Max TC CSI:0.061
Max BC CSI:0.094
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V1
Ply: 1
Qty:2
SEQN:166182 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T75
DrwNo:116.21.1016.34810
AK /WHK 04/26/2021
3'10"13
1'11"6
1'11"6
3'10"13
1'11"6
3'10"13
3'10"13
0"410"16'1"12
A
B
C
D
5
12
3X4(D1)
3X4
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*75 /-/-/31 /25 /5
Wind reactions based on MWFRS
D Brg Width = 46.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.72 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 999 360
VERT(CL):0.008 999 240
HORZ(LL):-0.001 - -
HORZ(TL):0.003 - -
Creep Factor: 2.0
Max TC CSI:0.061
Max BC CSI:0.094
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V1
Ply: 1
Qty:2
SEQN:166182 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T75
DrwNo:116.21.1016.34810
AK /WHK 04/26/2021
3'10"13
1'11"6
1'11"6
3'10"13
1'11"6
3'10"13
3'10"13
0"410"16'1"12
A
B
C
D
5
12
3X4(D1)
3X4
3X4(D1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/34 /36 /6
Wind reactions based on MWFRS
E Brg Width = 94.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.30 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 D 999 360
VERT(CL):0.014 D 999 240
HORZ(LL):0.003 D - -
HORZ(TL):0.005 D - -
Creep Factor: 2.0
Max TC CSI:0.152
Max BC CSI:0.150
Max Web CSI:0.038
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V2
Ply: 1
Qty:2
SEQN:166183 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T84
DrwNo:116.21.1016.36537
AK /WHK 04/26/2021
7'10"13
3'11"6
3'11"6
7'10"13
3'11"6
3'11"6
3'11"6
7'10"13
3'11"6
0"41'8"15'3"12
A
B
C
D
E
5
12
3X4(D1)
4X4
1.5X4
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/34 /36 /6
Wind reactions based on MWFRS
E Brg Width = 94.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.30 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 D 999 360
VERT(CL):0.014 D 999 240
HORZ(LL):0.003 D - -
HORZ(TL):0.005 D - -
Creep Factor: 2.0
Max TC CSI:0.152
Max BC CSI:0.150
Max Web CSI:0.038
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V2
Ply: 1
Qty:2
SEQN:166183 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T84
DrwNo:116.21.1016.36537
AK /WHK 04/26/2021
7'10"13
3'11"6
3'11"6
7'10"13
3'11"6
3'11"6
3'11"6
7'10"13
3'11"6
0"41'8"15'3"12
A
B
C
D
E
5
12
3X4(D1)
4X4
1.5X4
3X4(D1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/35 /39 /7
Wind reactions based on MWFRS
E Brg Width = 142 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 465 -286
Chords Tens.Comp.
B - C 465 -286
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 335 -385
Chords Tens.Comp.
D - C 335 -385
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 444 -571
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.88 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.032 D 999 360
VERT(CL):0.052 D 999 240
HORZ(LL):0.011 D - -
HORZ(TL):0.018 D - -
Creep Factor: 2.0
Max TC CSI:0.420
Max BC CSI:0.373
Max Web CSI:0.078
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V3
Ply: 1
Qty:1
SEQN:166184 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T85
DrwNo:116.21.1016.38190
AK /WHK 04/26/2021
11'10"13
5'11"6
5'11"6
11'10"13
5'11"6
5'11"6
5'11"6
11'10"13
5'11"6
0"42'6"14'5"12
A
B
C
D
E
5
12
3X4(D1)
4X4
1.5X4
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/35 /39 /7
Wind reactions based on MWFRS
E Brg Width = 142 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 465 -286
Chords Tens.Comp.
B - C 465 -286
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 335 -385
Chords Tens.Comp.
D - C 335 -385
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 444 -571
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.88 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.032 D 999 360
VERT(CL):0.052 D 999 240
HORZ(LL):0.011 D - -
HORZ(TL):0.018 D - -
Creep Factor: 2.0
Max TC CSI:0.420
Max BC CSI:0.373
Max Web CSI:0.078
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V3
Ply: 1
Qty:1
SEQN:166184 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T85
DrwNo:116.21.1016.38190
AK /WHK 04/26/2021
11'10"13
5'11"6
5'11"6
11'10"13
5'11"6
5'11"6
5'11"6
11'10"13
5'11"6
0"42'6"14'5"12
A
B
C
D
E
5
12
3X4(D1)
4X4
1.5X4
3X4(D1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/35 /40 /7
Wind reactions based on MWFRS
E Brg Width = 190 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 830 -552
Chords Tens.Comp.
B - C 830 -552
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 606 -705
Chords Tens.Comp.
D - C 606 -705
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 729 -931
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.47 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.078 D 999 360
VERT(CL):0.127 D 999 240
HORZ(LL):0.027 D - -
HORZ(TL):0.043 D - -
Creep Factor: 2.0
Max TC CSI:0.813
Max BC CSI:0.674
Max Web CSI:0.166
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V4
Ply: 1
Qty:1
SEQN:166185 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T86
DrwNo:116.21.1016.42890
AK /WHK 04/26/2021
15'10"13
7'11"6
7'11"6
15'10"13
7'11"6
7'11"6
7'11"6
15'10"13
7'11"6
0"43'4"13'7"12
A
B
C
D
E
5
12
3X4(D1)
4X4
1.5X6
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/35 /40 /7
Wind reactions based on MWFRS
E Brg Width = 190 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 830 -552
Chords Tens.Comp.
B - C 830 -552
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 606 -705
Chords Tens.Comp.
D - C 606 -705
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 729 -931
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.47 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.078 D 999 360
VERT(CL):0.127 D 999 240
HORZ(LL):0.027 D - -
HORZ(TL):0.043 D - -
Creep Factor: 2.0
Max TC CSI:0.813
Max BC CSI:0.674
Max Web CSI:0.166
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V4
Ply: 1
Qty:1
SEQN:166185 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T86
DrwNo:116.21.1016.42890
AK /WHK 04/26/2021
15'10"13
7'11"6
7'11"6
15'10"13
7'11"6
7'11"6
7'11"6
15'10"13
7'11"6
0"43'4"13'7"12
A
B
C
D
E
5
12
3X4(D1)
4X4
1.5X6
3X4(D1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/37 /44 /8
Wind reactions based on MWFRS
E Brg Width = 221 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 388 -342
Webs Tens.Comp.
F - D 388 -342
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.06 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.001 F 999 360
VERT(CL):0.002 C 999 240
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.416
Max BC CSI:0.249
Max Web CSI:0.071
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V5
Ply: 1
Qty:1
SEQN:166187 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T89
DrwNo:116.21.1016.44443
AK /WHK 04/26/2021
18'5"5
3'2"10
6'
(TYP)
9'2"10
9'2"10
18'5"5
9'2"10
18'5"5
18'5"5
3"144'2"12'9"12
A
B
C
D
E
FGH
5 12
2X4(A1)
1.5X4
1.5X4
4X4
5X5 1.5X4
1.5X4
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*75 /-/-/37 /44 /8
Wind reactions based on MWFRS
E Brg Width = 221 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 388 -342
Webs Tens.Comp.
F - D 388 -342
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.06 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.001 F 999 360
VERT(CL):0.002 C 999 240
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.416
Max BC CSI:0.249
Max Web CSI:0.071
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V5
Ply: 1
Qty:1
SEQN:166187 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T89
DrwNo:116.21.1016.44443
AK /WHK 04/26/2021
18'5"5
3'2"10
6'
(TYP)
9'2"10
9'2"10
18'5"5
9'2"10
18'5"5
18'5"5
3"144'2"12'9"12
A
B
C
D
E
FGH
5 12
2X4(A1)
1.5X4
1.5X4
4X4
5X5 1.5X4
1.5X4
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H*82 /-/-/38 /48 /10
Wind reactions based on MWFRS
H Brg Width = 221 Min Req =-
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - C 387 -338
Webs Tens.Comp.
E - I 387 -338
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.001 E 999 360
VERT(CL):0.002 D 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.261
Max Web CSI:0.098
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V6
Ply: 1
Qty:1
SEQN:166177 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T91
DrwNo:116.21.1016.46503
AK /WHK 04/26/2021
18'5"5
3'2"10
3'2"10
9'2"10
6'
15'2"10
6'
18'5"5
3'2"10
3'0"14
3'0"14
9'2"10
6'1"12
15'4"6
6'1"12
18'5"5
3'0"141'0"12 1'0"12
1'1"145'11'11"12
A
B
C
D
E
F
G
H
IJK
L
5
12
4X4
1.5X4 3X4
1.5X4
4X4
5X5
1.5X4
3X4
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H*82 /-/-/38 /48 /10
Wind reactions based on MWFRS
H Brg Width = 221 Min Req =-
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - C 387 -338
Webs Tens.Comp.
E - I 387 -338
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.001 E 999 360
VERT(CL):0.002 D 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.261
Max Web CSI:0.098
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V6
Ply: 1
Qty:1
SEQN:166177 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T91
DrwNo:116.21.1016.46503
AK /WHK 04/26/2021
18'5"5
3'2"10
3'2"10
9'2"10
6'
15'2"10
6'
18'5"5
3'2"10
3'0"14
3'0"14
9'2"10
6'1"12
15'4"6
6'1"12
18'5"5
3'0"141'0"12 1'0"12
1'1"145'11'11"12
A
B
C
D
E
F
G
H
IJK
L
5
12
4X4
1.5X4 3X4
1.5X4
4X4
5X5
1.5X4
3X4
4X4
1.5X4
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H*82 /-/-/38 /48 /10
Wind reactions based on MWFRS
H Brg Width = 221 Min Req =-
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - C 385 -337
Webs Tens.Comp.
E - I 385 -337
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002 E 999 360
VERT(CL):0.002 D 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.261
Max Web CSI:0.137
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V7
Ply: 1
Qty:1
SEQN:166174 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T90
DrwNo:116.21.1016.48300
AK /WHK 04/26/2021
18'5"5
3'2"10
3'2"10
9'2"10
6'
15'2"10
6'
18'5"5
3'2"10
3'0"14
3'0"14
9'2"10
6'1"12
15'4"6
6'1"12
18'5"5
3'0"141'0"12 1'0"121'11"145'10"11'1"12
A
B
C
D
E
F
G
H
IJK
L
5 12
4X4
1.5X4 3X4
1.5X4
4X4
5X5
1.5X4
3X4
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H*82 /-/-/38 /48 /10
Wind reactions based on MWFRS
H Brg Width = 221 Min Req =-
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - C 385 -337
Webs Tens.Comp.
E - I 385 -337
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002 E 999 360
VERT(CL):0.002 D 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.261
Max Web CSI:0.137
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V7
Ply: 1
Qty:1
SEQN:166174 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T90
DrwNo:116.21.1016.48300
AK /WHK 04/26/2021
18'5"5
3'2"10
3'2"10
9'2"10
6'
15'2"10
6'
18'5"5
3'2"10
3'0"14
3'0"14
9'2"10
6'1"12
15'4"6
6'1"12
18'5"5
3'0"141'0"12 1'0"121'11"145'10"11'1"12
A
B
C
D
E
F
G
H
IJK
L
5 12
4X4
1.5X4 3X4
1.5X4
4X4
5X5
1.5X4
3X4
4X4
1.5X4
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H*82 /-/-/38 /48 /10
Wind reactions based on MWFRS
H Brg Width = 221 Min Req =-
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - C 384 -335
Webs Tens.Comp.
E - I 384 -335
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002 E 999 360
VERT(CL):0.003 D 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.261
Max Web CSI:0.185
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V8
Ply: 1
Qty:1
SEQN:166181 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T88
DrwNo:116.21.1016.49883
AK /WHK 04/26/2021
18'5"5
3'2"10
3'2"10
9'2"10
6'
15'2"10
6'
18'5"5
3'2"10
3'0"14
3'0"14
9'2"10
6'1"12
15'4"6
6'1"12
18'5"5
3'0"141'0"12 1'0"122'9"146'8"10'3"12
A
B
C
D
E
F
G
H
IJK
L
5 12
4X4
1.5X4 3X4
1.5X4
4X4
5X5
1.5X4
3X4
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H*82 /-/-/38 /48 /10
Wind reactions based on MWFRS
H Brg Width = 221 Min Req =-
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - C 384 -335
Webs Tens.Comp.
E - I 384 -335
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002 E 999 360
VERT(CL):0.003 D 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.419
Max BC CSI:0.261
Max Web CSI:0.185
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:V8
Ply: 1
Qty:1
SEQN:166181 VAL
FROM:
Cust: R 761 JRef:1X4V7610002 T88
DrwNo:116.21.1016.49883
AK /WHK 04/26/2021
18'5"5
3'2"10
3'2"10
9'2"10
6'
15'2"10
6'
18'5"5
3'2"10
3'0"14
3'0"14
9'2"10
6'1"12
15'4"6
6'1"12
18'5"5
3'0"141'0"12 1'0"122'9"146'8"10'3"12
A
B
C
D
E
F
G
H
IJK
L
5 12
4X4
1.5X4 3X4
1.5X4
4X4
5X5
1.5X4
3X4
4X4
1.5X4
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 331 /-/-/245 /159 /194
D 125 /-/-/73 /4 /-
C 168 /-/-/109 /179 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.017 D - -
HORZ(TL):0.028 D - -
Creep Factor: 2.0
Max TC CSI:0.640
Max BC CSI:0.483
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J1
Ply: 1
Qty:15
SEQN:166201 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T16
DrwNo:116.21.1016.51480
AK /WHK 04/26/2021
6'11"4
6'11"41'
4"1 3'2"123'7"89'5"
12'4"4
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 331 /-/-/245 /159 /194
D 125 /-/-/73 /4 /-
C 168 /-/-/109 /179 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.017 D - -
HORZ(TL):0.028 D - -
Creep Factor: 2.0
Max TC CSI:0.640
Max BC CSI:0.483
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J1
Ply: 1
Qty:15
SEQN:166201 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T16
DrwNo:116.21.1016.51480
AK /WHK 04/26/2021
6'11"4
6'11"41'
4"1 3'2"123'7"89'5"
12'4"4
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 152 /-/-/136 /84 /59
D 23 /-/-/14 /5 /-
C 18 /-/-/16 /25 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.015
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J2
Ply: 1
Qty:1
SEQN:166200 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T19
DrwNo:116.21.1016.52983
AK /WHK 04/26/2021
1'7"4
1'7"41'
4"1 1'0"11'4"139'5"
10'1"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 152 /-/-/136 /84 /59
D 23 /-/-/14 /5 /-
C 18 /-/-/16 /25 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.015
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J2
Ply: 1
Qty:1
SEQN:166200 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T19
DrwNo:116.21.1016.52983
AK /WHK 04/26/2021
1'7"4
1'7"41'
4"1 1'0"11'4"139'5"
10'1"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 259 /-/-/198 /127 /144
D 87 /-/-/50 /2 /-
C 116 /-/-/75 /124 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.009 D - -
Creep Factor: 2.0
Max TC CSI:0.286
Max BC CSI:0.222
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J3
Ply: 1
Qty:10
SEQN:166192 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T29
DrwNo:116.21.1016.54387
AK /WHK 04/26/2021
4'11"4
4'11"41'
4"1 2'4"122'9"89'5"
11'6"4
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 259 /-/-/198 /127 /144
D 87 /-/-/50 /2 /-
C 116 /-/-/75 /124 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.009 D - -
Creep Factor: 2.0
Max TC CSI:0.286
Max BC CSI:0.222
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J3
Ply: 1
Qty:10
SEQN:166192 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T29
DrwNo:116.21.1016.54387
AK /WHK 04/26/2021
4'11"4
4'11"41'
4"1 2'4"122'9"89'5"
11'6"4
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 262 /-/-/200 /128 /146
D 89 /-/-/51 /2 /-
C 118 /-/-/76 /127 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.298
Max BC CSI:0.230
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J4
Ply: 1
Qty:7
SEQN:166197 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T58
DrwNo:116.21.1016.55660
AK /WHK 04/26/2021
5'0"4
5'0"41'
4"1 2'5"32'9"149'5"
11'6"11
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 262 /-/-/200 /128 /146
D 89 /-/-/51 /2 /-
C 118 /-/-/76 /127 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.298
Max BC CSI:0.230
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J4
Ply: 1
Qty:7
SEQN:166197 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T58
DrwNo:116.21.1016.55660
AK /WHK 04/26/2021
5'0"4
5'0"41'
4"1 2'5"32'9"149'5"
11'6"11
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 176 /-/-/147 /92 /82
D 41 /-/-/23 /-/-
C 49 /-/-/28 /55 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.067
Max BC CSI:0.042
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J5
Ply: 1
Qty:4
SEQN:166195 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T82
DrwNo:116.21.1016.57583
AK /WHK 04/26/2021
2'6"
2'6"1'
4"1 1'4"91'9"512'9"
13'10"1
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 176 /-/-/147 /92 /82
D 41 /-/-/23 /-/-
C 49 /-/-/28 /55 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.067
Max BC CSI:0.042
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J5
Ply: 1
Qty:4
SEQN:166195 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T82
DrwNo:116.21.1016.57583
AK /WHK 04/26/2021
2'6"
2'6"1'
4"1 1'4"91'9"512'9"
13'10"1
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 208 /-/-/166 /106 /107
D 60 /-/-/33 /1 /-
C 77 /-/-/48 /84 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.119
Max BC CSI:0.098
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J6
Ply: 1
Qty:3
SEQN:166196 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T77
DrwNo:116.21.1016.59907
AK /WHK 04/26/2021
3'6"
3'6"1'
4"1 1'9"92'2"512'9"
14'3"1
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 208 /-/-/166 /106 /107
D 60 /-/-/33 /1 /-
C 77 /-/-/48 /84 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.119
Max BC CSI:0.098
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J6
Ply: 1
Qty:3
SEQN:166196 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T77
DrwNo:116.21.1016.59907
AK /WHK 04/26/2021
3'6"
3'6"1'
4"1 1'9"92'2"512'9"
14'3"1
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 3.50
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.50
BC: 396 lb Conc. Load at 1.56
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 437 /-/-/-/276 /-
D 164 /-/-/-/68 /-
C 118 /-/-/-/92 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.006 D - -
HORZ(TL):0.012 D - -
Creep Factor: 2.0
Max TC CSI:0.366
Max BC CSI:0.700
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J6G
Ply: 1
Qty:1
SEQN:166229 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T76
DrwNo:116.21.1017.15350
AK /WHK 04/26/2021
3'6"
3'6"1'
4"1 1'9"92'2"512'9"
14'3"1
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 3.50
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.50
BC: 396 lb Conc. Load at 1.56
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 437 /-/-/-/276 /-
D 164 /-/-/-/68 /-
C 118 /-/-/-/92 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.006 D - -
HORZ(TL):0.012 D - -
Creep Factor: 2.0
Max TC CSI:0.366
Max BC CSI:0.700
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:J6G
Ply: 1
Qty:1
SEQN:166229 EJAC
FROM:
Cust: R 761 JRef:1X4V7610002 T76
DrwNo:116.21.1017.15350
AK /WHK 04/26/2021
3'6"
3'6"1'
4"1 1'9"92'2"512'9"
14'3"1
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at TC
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 323 /-/-/-/195 /-
E 361 /-/0 /-/140 /0
D 211 /-/-/-/193 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 481 -815
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 767 -449
Chords Tens.Comp.
G - F 755 -450
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 493 -825
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 C 999 360
VERT(CL):0.073 C 999 240
HORZ(LL):0.008 C - -
HORZ(TL):0.015 C - -
Creep Factor: 2.0
Max TC CSI:0.489
Max BC CSI:0.634
Max Web CSI:0.126
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K1
Ply: 1
Qty:1
SEQN:166223 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T17
DrwNo:116.21.1017.16900
AK /WHK 04/26/2021
5'6"4
5'6"4
9'9"12
4'3"8
5'4"8
5'4"8
9'1"4
3'8"13
9'9"12
8"71'5"
3"13 3'2"83'7"59'5"
12'4"
A
B
C
D
EFG
3.54 12
2X4(A1)1.5X4
3X4
3X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at TC
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 323 /-/-/-/195 /-
E 361 /-/0 /-/140 /0
D 211 /-/-/-/193 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 481 -815
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 767 -449
Chords Tens.Comp.
G - F 755 -450
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 493 -825
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 C 999 360
VERT(CL):0.073 C 999 240
HORZ(LL):0.008 C - -
HORZ(TL):0.015 C - -
Creep Factor: 2.0
Max TC CSI:0.489
Max BC CSI:0.634
Max Web CSI:0.126
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K1
Ply: 1
Qty:1
SEQN:166223 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T17
DrwNo:116.21.1017.16900
AK /WHK 04/26/2021
5'6"4
5'6"4
9'9"12
4'3"8
5'4"8
5'4"8
9'1"4
3'8"13
9'9"12
8"71'5"
3"13 3'2"83'7"59'5"
12'4"
A
B
C
D
EFG
3.54 12
2X4(A1)1.5X4
3X4
3X5
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 1-7-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 68 /-/-/-/51 /-
D 1 /-/-/6 /-/-
C 8 /-/-/-/7 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.072
Max BC CSI:0.013
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K2
Ply: 1
Qty:1
SEQN:166220 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T32
DrwNo:116.21.1017.28023
AK /WHK 04/26/2021
2'3"4
2'3"41'5"
3"13 11"141'4"119'5"
10'1"6
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 1-7-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 68 /-/-/-/51 /-
D 1 /-/-/6 /-/-
C 8 /-/-/-/7 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.072
Max BC CSI:0.013
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K2
Ply: 1
Qty:1
SEQN:166220 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T32
DrwNo:116.21.1017.28023
AK /WHK 04/26/2021
2'3"4
2'3"41'5"
3"13 11"141'4"119'5"
10'1"6
A
B
C
D
3.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 177 /-/-/-/110 /-
D 88 /-/-/8 /-/-
C 193 /-/-/-/171 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.663
Max BC CSI:0.405
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K3
Ply: 1
Qty:3
SEQN:166217 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T30
DrwNo:116.21.1017.29967
AK /WHK 04/26/2021
6'11"13
6'11"131'5"
3"13 2'4"82'9"59'5"
11'6"
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 177 /-/-/-/110 /-
D 88 /-/-/8 /-/-
C 193 /-/-/-/171 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.663
Max BC CSI:0.405
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K3
Ply: 1
Qty:3
SEQN:166217 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T30
DrwNo:116.21.1017.29967
AK /WHK 04/26/2021
6'11"13
6'11"131'5"
3"13 2'4"82'9"59'5"
11'6"
A
B
C
D
3.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 5-0-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 201 /-/-/-/128 /-
D 90 /-/-/9 /-/-
C 198 /-/-/-/176 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.688
Max BC CSI:0.408
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K4
Ply: 1
Qty:1
SEQN:166214 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T59
DrwNo:116.21.1017.32113
AK /WHK 04/26/2021
7'1"3
7'1"31'5"
3"13 2'4"152'9"129'5"
11'6"7
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 5-0-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 201 /-/-/-/128 /-
D 90 /-/-/9 /-/-
C 198 /-/-/-/176 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.688
Max BC CSI:0.408
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K4
Ply: 1
Qty:1
SEQN:166214 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T59
DrwNo:116.21.1017.32113
AK /WHK 04/26/2021
7'1"3
7'1"31'5"
3"13 2'4"152'9"129'5"
11'6"7
A
B
C
D
3.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 0 plf at -1.41 to 55 plf at 0.00
TC: From 2 plf at 0.00 to 2 plf at 3.54
BC: From 0 plf at -1.41 to 4 plf at 0.00
BC: From 2 plf at 0.00 to 2 plf at 3.54
TC: -4 lb Conc. Load at 1.43
BC: 21 lb Conc. Load at 1.43
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 134 /-/-/-/92 /-
D 57 /-/-/-/9 /-
C 28 /-/-/-/12 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.068
Max BC CSI:0.088
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K5
Ply: 1
Qty:2
SEQN:166235 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T83
DrwNo:116.21.1018.03930
AK /WHK 04/26/2021
3'6"7
3'6"71'5"
3"13 1'4"51'9"212'9"
13'9"13
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 0 plf at -1.41 to 55 plf at 0.00
TC: From 2 plf at 0.00 to 2 plf at 3.54
BC: From 0 plf at -1.41 to 4 plf at 0.00
BC: From 2 plf at 0.00 to 2 plf at 3.54
TC: -4 lb Conc. Load at 1.43
BC: 21 lb Conc. Load at 1.43
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 134 /-/-/-/92 /-
D 57 /-/-/-/9 /-
C 28 /-/-/-/12 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.068
Max BC CSI:0.088
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K5
Ply: 1
Qty:2
SEQN:166235 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T83
DrwNo:116.21.1018.03930
AK /WHK 04/26/2021
3'6"7
3'6"71'5"
3"13 1'4"51'9"212'9"
13'9"13
A
B
C
D
3.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-6-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 125 /-/-/-/84 /-
D 40 /-/-/6 /-/-
C 89 /-/-/-/79 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.191
Max BC CSI:0.115
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K6
Ply: 1
Qty:1
SEQN:166232 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T78
DrwNo:116.21.1018.43897
AK /WHK 04/26/2021
4'11"6
4'11"61'5"
3"13 1'9"52'2"212'9"
14'2"13
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-6-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 125 /-/-/-/84 /-
D 40 /-/-/6 /-/-
C 89 /-/-/-/79 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.191
Max BC CSI:0.115
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:K6
Ply: 1
Qty:1
SEQN:166232 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T78
DrwNo:116.21.1018.43897
AK /WHK 04/26/2021
4'11"6
4'11"61'5"
3"13 1'9"52'2"212'9"
14'2"13
A
B
C
D
3.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C1
Ply: 1
Qty:8
SEQN:166194 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T15
DrwNo:116.21.1023.03773
AK /WHK 04/26/2021
1'
1'1'
4"1 9"11'1"1312'9"
13'2"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C1
Ply: 1
Qty:8
SEQN:166194 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T15
DrwNo:116.21.1023.03773
AK /WHK 04/26/2021
1'
1'1'
4"1 9"11'1"1312'9"
13'2"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 44 /-/-/28 /15 /24
C 15 /-/-/11 /5 /-
B 19 /-/-/13 /20 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.006
Max BC CSI:0.006
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C1A
Ply: 1
Qty:1
SEQN:166188 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T63
DrwNo:116.21.1023.08323
AK /WHK 04/26/2021
1'
1'
4"1 9"19'5"
9'10"9A
B
C
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 44 /-/-/28 /15 /24
C 15 /-/-/11 /5 /-
B 19 /-/-/13 /20 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.006
Max BC CSI:0.006
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C1A
Ply: 1
Qty:1
SEQN:166188 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T63
DrwNo:116.21.1023.08323
AK /WHK 04/26/2021
1'
1'
4"1 9"19'5"
9'10"9A
B
C
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C2
Ply: 1
Qty:5
SEQN:166193 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T14
DrwNo:116.21.1023.10853
AK /WHK 04/26/2021
3'
3'1'
4"1 1'7"11'11"139'5"
10'8"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C2
Ply: 1
Qty:5
SEQN:166193 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T14
DrwNo:116.21.1023.10853
AK /WHK 04/26/2021
3'
3'1'
4"1 1'7"11'11"139'5"
10'8"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 119 /-/-/77 /49 /74
C 52 /-/-/32 /4 /-
B 71 /-/-/47 /75 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.097
Max BC CSI:0.079
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C2A
Ply: 1
Qty:1
SEQN:166189 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T65
DrwNo:116.21.1023.13727
AK /WHK 04/26/2021
3'
3'
4"1 1'7"19'5"
10'8"9
A
B
C
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 119 /-/-/77 /49 /74
C 52 /-/-/32 /4 /-
B 71 /-/-/47 /75 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.097
Max BC CSI:0.079
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C2A
Ply: 1
Qty:1
SEQN:166189 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T65
DrwNo:116.21.1023.13727
AK /WHK 04/26/2021
3'
3'
4"1 1'7"19'5"
10'8"9
A
B
C
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C3
Ply: 1
Qty:1
SEQN:166199 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T13
DrwNo:116.21.1023.57337
AK /WHK 04/26/2021
5'
5'1'
4"1 2'5"12'9"139'5"
11'6"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C3
Ply: 1
Qty:1
SEQN:166199 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T13
DrwNo:116.21.1023.57337
AK /WHK 04/26/2021
5'
5'1'
4"1 2'5"12'9"139'5"
11'6"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C4
Ply: 1
Qty:9
SEQN:166190 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T12
DrwNo:116.21.1024.06870
AK /WHK 04/26/2021
1'
1'1'
4"1 9"11'1"139'5"
9'10"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C4
Ply: 1
Qty:9
SEQN:166190 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T12
DrwNo:116.21.1024.06870
AK /WHK 04/26/2021
1'
1'1'
4"1 9"11'1"139'5"
9'10"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C5
Ply: 1
Qty:5
SEQN:166191 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T11
DrwNo:116.21.1024.52970
AK /WHK 04/26/2021
3'
3'1'
4"1 1'7"11'11"139'5"
10'8"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C5
Ply: 1
Qty:5
SEQN:166191 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T11
DrwNo:116.21.1024.52970
AK /WHK 04/26/2021
3'
3'1'
4"1 1'7"11'11"139'5"
10'8"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 113 /-/-/73 /46 /74
C 55 /-/-/34 /6 /-
B 74 /-/-/49 /76 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
C Brg Width = 1.5
B Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.105
Max BC CSI:0.094
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C5A
Ply: 1
Qty:1
SEQN:166211 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T57
DrwNo:116.21.1026.51293
AK /WHK 04/26/2021
3'
1"8
1"8
3'1"8
3'
4"1 1'7"19'5"
10'8"9
A
B
C
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 113 /-/-/73 /46 /74
C 55 /-/-/34 /6 /-
B 74 /-/-/49 /76 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
C Brg Width = 1.5
B Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.105
Max BC CSI:0.094
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C5A
Ply: 1
Qty:1
SEQN:166211 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T57
DrwNo:116.21.1026.51293
AK /WHK 04/26/2021
3'
1"8
1"8
3'1"8
3'
4"1 1'7"19'5"
10'8"9
A
B
C
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C6
Ply: 1
Qty:1
SEQN:166198 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T10
DrwNo:116.21.1026.53067
AK /WHK 04/26/2021
5'
5'1'
4"1 2'5"12'9"139'5"
11'6"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:C6
Ply: 1
Qty:1
SEQN:166198 JACK
FROM:
Cust: R 761 JRef:1X4V7610002 T10
DrwNo:116.21.1026.53067
AK /WHK 04/26/2021
5'
5'1'
4"1 2'5"12'9"139'5"
11'6"9
A
B
C
D
5
12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 1-8-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 52 /-/-/-/37 /-
D 5 /-/-/4 /-/-
C 14 /-/-/5 /12 /-
Wind reactions based on MWFRS
B Brg Width = 8.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.044
Max BC CSI:0.008
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:HJ7A
Ply: 1
Qty:2
SEQN:166249 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T43
DrwNo:116.21.1026.54527
AK /WHK 04/26/2021
2'4"10
2'4"101'1"3
3"15 1'2"131'7"99'5"
10'4"5
A
B
C
D
4.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 1-8-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 52 /-/-/-/37 /-
D 5 /-/-/4 /-/-
C 14 /-/-/5 /12 /-
Wind reactions based on MWFRS
B Brg Width = 8.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.044
Max BC CSI:0.008
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:HJ7A
Ply: 1
Qty:2
SEQN:166249 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T43
DrwNo:116.21.1026.54527
AK /WHK 04/26/2021
2'4"10
2'4"101'1"3
3"15 1'2"131'7"99'5"
10'4"5
A
B
C
D
4.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-7-2 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 60 /-/-/-/39 /-
D 22 /-/-/3 /-/-
C 49 /-/-/-/42 /-
Wind reactions based on MWFRS
B Brg Width = 8.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.075
Max BC CSI:0.050
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:HJ7BL
Ply: 1
Qty:1
SEQN:166252 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T50
DrwNo:116.21.1026.55830
AK /WHK 04/26/2021
3'8"1
3'8"11'1"3
3"15 1'8"102'1"79'5"
10'10"2
A
B
C
D
4.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-7-2 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 60 /-/-/-/39 /-
D 22 /-/-/3 /-/-
C 49 /-/-/-/42 /-
Wind reactions based on MWFRS
B Brg Width = 8.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.075
Max BC CSI:0.050
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:HJ7BL
Ply: 1
Qty:1
SEQN:166252 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T50
DrwNo:116.21.1026.55830
AK /WHK 04/26/2021
3'8"1
3'8"11'1"3
3"15 1'8"102'1"79'5"
10'10"2
A
B
C
D
4.54 12
2X4(A1)
04/26/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-7-2 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 60 /-/-/-/39 /-
D 22 /-/-/3 /-/-
C 49 /-/-/-/42 /-
Wind reactions based on MWFRS
B Brg Width = 8.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.075
Max BC CSI:0.050
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:HJ7BR
Ply: 1
Qty:1
SEQN:166255 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T51
DrwNo:116.21.1026.57123
AK /WHK 04/26/2021
3'8"1
3'8"11'1"3
3"15 1'8"102'1"79'5"
10'10"2
A
B
C
D
4.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-7-2 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 60 /-/-/-/39 /-
D 22 /-/-/3 /-/-
C 49 /-/-/-/42 /-
Wind reactions based on MWFRS
B Brg Width = 8.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.075
Max BC CSI:0.050
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0330
/GROZA BUILDERS, INC. / /WELLS RESIDENCE
Truss Label:HJ7BR
Ply: 1
Qty:1
SEQN:166255 HIP_
FROM:
Cust: R 761 JRef:1X4V7610002 T51
DrwNo:116.21.1026.57123
AK /WHK 04/26/2021
3'8"1
3'8"11'1"3
3"15 1'8"102'1"79'5"
10'10"2
A
B
C
D
4.54 12
2X4(A1)
04/26/2021
COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
04/26/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
04/26/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
04/26/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
04/26/2021COA #0 278