HomeMy WebLinkAboutRoof info�0' ST. LUCIE VORKS
P
ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET
Florida Building Code 7th Edition (2020)
Based on Section 1525 of the Florida Building Code -Building
INSTRUCTION PAGE
COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET
APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED
BELOW:
Roof System
Required Sections of
the Permit Application
Form
Attachments Required
See List Below
Low Slope Application
A, B,C
122.4B87.
Prescriptive BUR-RAS 150
A, B, C
2,4,5,6,7
Asphaltic Shingles
A, B,D
12A ram]
Concrete or Clay Tile
A, B, D, E
1,2,SA%6,7
Metal Roofs
A, B, D
1,2,6,4,6A7
Wood Shingles and
Shakes
A, B, D
12,4.6,6.7
Other
As Applicable
1,2,3,4,6,6,7
ATTACHMENTS REQUIRED As ADolicable):
1.
Fire Directory Listing Page
2.
From Product Approval:
Front Page
Specific System Description
Specific System Limitations
General Limitations
Applicable Detail Drawings
3.
Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128
4.
Other Component of Product Approval
5.
Municipal Permit Application
6.
Owners Notification for Roofing Considerations (Reroofing Only)
7,
Any Required Roof Testing/Calculation Documentation
Form RooflnfoFeb21 Rev Feb 18, 2021
Section C (Low Slope Roof)
Fill in specific roof assembly components and identify
manufacturer
(If a component is not used, identify as "NA")
System Manufacturer:
Product Approval
Design Wind Pressures, From RAS 128 Or Calculations:
Zone 1': _ Zone 1: Zone 2: _Zone 3:
Max. Design Pressure, from the specific product approval
Deck:
Gauge
Anchor/Base Sheet & No. df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
Insulation Base Layer:
Base Insultation Size and Thickness:
Base Insulation Fastener/Bonding Material:
Top Insulation Layer:
Top Insulation Size and Thickness:
Top Insulation Fastener/Bonding Material:
Base Sheet(s) & No. of Ply(s):
Base Sheet Fastener/Bonding Material:
Ply Sheet(s)' & No. of Ply(s):
Ply Sheet Fastener/Bonding Material:
Top Ply:
Top Ply Fastener/Bonding Material:
Fastener Spacing for Anchor/Base Sheet Attachment:
Zone 1':_"
oc @ Lap, p Rows— @ _° m
Zone 1&
oc@Lap, fl Rows —®_°m
Zone 2:_"oc@Lap,
M Rows —®_'m
Zone 3:_.."
oc @ Lap, # Rows_ ®_" m
Number of Fasteners Per Insulation Board:
Zone 1':_Zone 1:_Zone 2:_Zone 3:_
Illustrate Components Noted and Details as Applicable:
Woodblocking, Gutter, Edge Termination, Stripping,
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
CounterRashing, Coping, Etc.
Indicate: Mean Roof Height, Parapet Height, Height of Base
Flashing, Component Material, Material' Thickness, Fastener
Type, Fastener Spacing or Submit Manufacturers Details that
Comply with RAS 111 and Chapter 16..
ST. LUCIE WORKS
Section D (Steep Slope Roof System)
Roof system Manufacturer: OWENS CONRI NG DURATION
Notice of Acceptance Number: FL#10674.1
Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations):
Zone 1: -67 Zone 2e:-94 Zone 2n:one 2r:-88 Zone 3e:-94_Zone 3r:
Deck Type: PLYWOOD
Type Underlayment PEEL&STICK-OVENS CORNING 11RUILT F.4.aI
Roof Sbpe:
4 12
Insulation:
Fire Bander:
Ridge Venilalon7 Fastener Type&SpaCRig: 6'FIELD IV PERIMETER, eD RING SHANK NAILS
Adhesies Type:
Type Cap Sheet
Mean Roof Height: 15 FT I Roof Covering: SHINGLES
Type&Sim Drip 2"x2"
Edge:
ST. LUCIE WORKS
Section E (Tile Calculations)
For Moment based tile systems, choose either Method 1 or 2. Compare the values for M. with the values from Mr. If the Mr values
are greater than or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable.
Method 1'Moment Based Tile Calculations Per RA512T
(Zone 1: _xx =.)- mg: _=M„_ Product ApprovalM
(Zone 2e: _xR�=_-)_Mg:_=M._ Product Approval Mr
(Zone 2n: - xl._= _�-Mg: _=Mm,_ Product Approval Mr
(Zone 2r. _x)L_=-Mg:_=M,y_ Product Approval Mr
(Zone 3e: -xa._= _)-Mg:_=Mm,_ Product Approval Mr
(Zone 3r: _x x_= MgI_=M&_ Product Approval M,
Method 2 "Simplified Tile Calculations Per Table Below"
Required Moment of Resistance (Md From Table Below_Produnt Annrnval Mr
M, required Moment Resistance -
Mean Roof Height Roof Slope
15'
20'
25
30
40'
2:12
34.4
36.5
38.2
39.7
42.2
3:12
32.2
34.4
36.0
37.4
39.8
4:12
30.4
32.2
33.8
35.1
37.3
512
28.4
30.1
31.6
32.8
34.9
6:12
26.4
28.0
29.4
30.5
32.4
7:12
24.4
25.9
27.1
28.2
30.0
'Must be used in conjunction with a list of moment based tile systems
For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, If the F' values are greater than or
equal to the F, values, for each area of the roof, then the tile attachment method is acceptable.
Method 3 "Uplift Based Tile Calculations Per RAS 12T
(Zone 1: _x L =x W:=_) -W: cos r Fn_ Product Approval F'
(Zone 2e:_x L_ xW:=_)-W:cos r Foe_ Product Approval In
(Zone 2n:_x L=xW:=----)-W:cos r=Fa. Product Approval F'
(Zone 2r._xL_=mW:=_)-W: cos r Fr,r Product Approval F'
(Zone 3e:x L=xW:=_J-W:_cos rF,s. Product Approval F'
(Zone 3r:x L=x W:=)-W:_Cos r-=Frsr Product Approval F'
Where to Obtain Information
Description
Symbol
Where to find
Design Pressure
zones 1, 2e, 2n, 2r, 3e, 3,
From applicabletable in RAS 127 or by an engineering analysis
prepared by PE based on ASCE 7
Mean Roof Height
H
job Site
Roof Slope
a
Job Site
Aerodynamic Multiplier
a
Product Approval
Restoring Moment due to Gravity
Mr
Product Approval
Attachment Resistance
Mt
Product Approval
Required Moment Resistance
Mr
Calculated
Minimum Attachment Resistance
r
Product Approval
Required Uplift Resistance
F,
Calculated
Average Tile Weight
W
Product Approval
Tile Dimensions
L=length W=width
Product Approval
All calculations must be submitted to the building official at the time of Permit application.