Loading...
HomeMy WebLinkAboutBlower Door TestPlanning & Development Services "' j,-j.e Building &Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method Date: If I l; Z - -( Permit #: Contractor: rcg �.,f � cT,'o, (a Job Address: I 1 t 15, Rkyv rs oc. k Lh'I C± P: c•,e, ft 3 4 9Y) Construction: (,_�j New Construction — Complete ( ) Existing —After Addition House Infiltration Test Results CFM (50) _ 13 S-) Volume = I q .S Z 91 ACH (50) = CFM (50) x 60 / Volume = �• Z Passing results must be & ACH (50) or less SLC Climate Zone 2 Test Date: L yI L - L I Mechanical Ventilation required less than 3 ACH (VI Pass ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testing Company Company Name: Pro -Duct Services Address: 1915 Rio Vista Drive, Ft. Pierce, FL 34949 I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance witl,�6ection R402.4.1.2 Climate Zone 2. Signature: Printed Name: Martin Klein License/Certification #: 5061633 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: 611000 Permit #: Z C6 Job Information Builder: Brego Construction Corp Community. Lot: NA Address: 17225 HAMMOCK LN City: Fort Pierce State: FL Zip. 34987 Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method O PRESCRIPTNE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch w-g. (50 Pascals) in Climate Zones 1 and Z (� PERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on Form R405-2017 (Performance) or R406-2017 (ERI), section labeled as infiltration, sub -section ACH50. ACH(50) specified on Form R405-2017-Energy Cato (Performance) or R406-2017 (ERI): 5.000 13 s 1 x 60 _ 19528 — • Z Method for calculating building volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans PASS • Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues. or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: e. ; w c V,. er Phone: 1 l 1 -5 7.1 t o -7 ( 1 hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requiremeenntt�s� according to the compliance method selected above. f f Signature of Tester: p/n 14— Date of Test: Z ° Q j� Printed Name of Tester: #: S 6 1 G 3 Issuing Authority: License/Certification 3/15/2020 11:36:04 AM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1