Loading...
HomeMy WebLinkAboutBuilding PermitCode Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 hftp://www.stiucieco.org/publlc—works/pormifting.htm Issued: 11 /04/2008 Job Location: 2673 N U S 1 LOT 18 Permit Type: Mobile Home Job Description: BUILDING PERMIT Conf #: 804 Permit #: SLC- 0810-0260 1 City: FORT PIERCE INSTALLATION OF A 24' X 36' 1979 CORO USED MOBILE HOME Page 1 S/D Colony Club MHP Lot: 18 Block: Parcel: 1433-120-0010-000/5 Contractor ROBERT BARETT VAPOR LOCK TIGHT (772) 215-3830 7551 SW 40TH TERR PALM CITY, FL 34990 Property Owner FINE REALTY CORP % HOWARD FEIN (954) 478-7602 2601 N US HWY 1 Setbacks Left:19.00 Number of Units: 1.00 Minimum Floor Elevation: Right: 10.00 Front:10.00 Floors: 1 Buildings: Flood Map: 177G FORT PIERCE, FL 34946 Rear: 25.80 Zoning: RMH-5 1 Square Footage: 0.00 Flood Zone: X Elev: Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. j WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.136, F.S. Christopher Lestrange Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) ,(2) states; Building Permits shall expire and become null and void if work authorized by such Building Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24-months (permit by owner) from the date of issuance of the Building Permit.