HomeMy WebLinkAboutAPPROVED Floorplan - 9311 Scarboroughbed-5
12' x 14'
12'/13'-4" clg
4'-2"
closet
2'-0"
5'-0"
9311 Scarborough Court Scope of Renovation: Remove all cabinets and built-ins. Remove all wallboard on walls, ceilings to remain. Framing and floor plan
to remain as-is. Install new drywall, wall tile, cabinets and built-ins. Plumbing rough to remain with new trim. Water heater to remain. Electrical trim to be
replaced with as-equal. Receptacles to be tamper resistant. A/C duct remain as-is. New mechanical equipment change for equal.
9311