Loading...
HomeMy WebLinkAboutAPPROVED raintree flat pwSection A (General Information) Master Permit No. Process No. Contractors Name: (611 f �I License # l CC �aavd Job Address 5­7 1 �s CI t ✓ ( IV 1 '�Kow Slope ❑ Asphaltic Shingles ❑ New roof ❑ Repair Low Slope Roof Area (SF) 521 ROOF CATEGORY ❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tiles ❑ Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE_ ❑ Maintenance Ja`Reeroofing ❑ Recovering . ROOF SYSTEM INFORMATION Steep Sloped Roof Area (SF) _ Total (SF) 1 0 1 Section B (Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. UC E WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identifyas"NA") System System Manufacturer: 0 i 13 Product Approval No.: Design Wind Pressures, Frroo�ym RAS 128 Or Calculations: Zone 1': 1: `�lone 2: Uu—zone 3: q6 Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: 4 Slope: L- i I /— - Anch se Sheet & No. df Ply(s):.- Anchor/Base Sheet Fastener/Bonding M Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Mate al: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: l J 'O ri C 0 Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows @ "oG Zone 1: �." oc @ Lap, # Rows @ "oo Zone 2:.." oc @ Lap, # Rows @ "oc Zone 3:—" oc @ Lap, # Rows @ " oc Number of Fasteners Per Insulation Board: Zone 1': Zone 1: Zone 2: Zone 3 Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc.. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16..