Loading...
HomeMy WebLinkAboutEngineering; BracingU2/ Ya/ 21JU4 10: UU U (00 l40 MU un to 7 ?, a • i ALL WIDTHS; AND LENGTHS UP TO 52' • • i •. ALL WIDTHS; AND LENGTHS OVER 52' TO 80' • • • i i l�i�:'I�'EG:I�:C AT�C 1 :.. HOES :1T1',�:Iow6. lrc Q ,. 8 sySt" his r' o "i .. ......rh1a `s:air`4'nd.G�',0ki� • . ull�cl. a� .each la��r�l �f5r�cl • . ;�t �•� O = GROUND PAN Flondg approved 4' ground / - GROUND PAN CONNECTOR U BRACKETS anchors may bo u3sd in all �� 9FIij �� �® , �jJTv �%� — TELESOOPI NG V BRACE locallons except where home �/ r� '� ®®/� ASSEMBLY Wi 1.5 SOT- menufacturemspecificetionS t� / / for sidemll straps M In 11dt1 mr1 b /� TOM E AND 1,25 Tt1BE INS mom of 4,WO lbs. These 4 nw �. '' / �/� � ������` F = V CB I -BEAM CONNEC- locetions roqulre a 5' anchor. r i L H�'Tzon PrR A55EMBL.Y r Too ���s H = ESCAPING TRANSVERSE; jMBLY " ��/yl M TERSE ARM 143EAM p-Ground F-: br I•heam �, /`� V � �� v PANE V" BRACKET Pan transuersa connecter' 14 . �// �/ eo�nneclore i - ground Pan ISED STRUCTI ON$ 4123103 V Bracket NOTES: 1, LENGTH OF HOUSE'IS THE ACTUAL BOX SIZE E- i``B"nce7„ 2. = sTABILIZER PLATE AND FRAME TIE LOCATION { Top (1.26) (needs to be located within 16 from center of Bottom (1.51. round an �Yr� -Ground Pan 3. = LOCATION OF ASF MODEL 1101"V" (LATERAL &LONGITUDINAL BRACING). = LOCATION OF MODEL 1101-01" PATENT PENDING (LONGITUDINAL BRACING ONLY). r' Tel 931-796 -0555 MANUFACTURED HOUSING FOUNDATION SYSTEMS Fsx_ 931-796.8911 AMIL A DIVISION OF OI-NER TECHNOLOGIES, INC. www.cuvartechnologies.com 1-800-284-7437 IL �y - OLIVER TECHNOLOGIES, INC. FLORIDA INSTALLATION INSTRUCTIONS FOR THE MODEL 1101 "V" ES ALL ST L FOUNDATION §YSTEM MODEL 1101"V" (STEPS 1-15) MODEL 1101-R"V" LONGITUDINAL ONLY: FOLLOW STEPS 1-8 FOR ADpING LATERAL ARM: ENG(NF-FAS STAMP FOIlow SS 10-15 FNMINEER3 STAMP SPECIAL CIRCUMSTANCES: If the following conditions occur- STOP! Contact Oliver Technologies at 1-800-284.7437 : a) Pier height exceeds 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96" e) Location is within 1500 feet of coast INSTALLATION.OF GROUND ID PAN 2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . 3. Place ground pan (C) directly below chassis I-beam , Press or drive pan firmly into soil until flush with or below soil. SPECIAL NOTE: The longitudinal "V" brace system serves as a pier under the home and should be loaded as any other pier. It is recommended that after leveling piers, and one-half inch (10) before home is lowered completely on to piers, complete steps 4 through 9 below. LATION OF LONGITUDINAL Ts BRACE SYSTEM NOTE: WHEN INSTALLING THE MODEL # 11014"V" LONGITUDINAL SYSTEM CffLy. A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROSE TEST READINGS ARE BETWEEN 175 & 276 A 6 FOOT ANCHOR MUST BE USED, IF PROBE TEST READINGS ARE BETWEEN 276 & 360 A 4 FOOT ANCHOR MAY BE USED. USE GROUND ANCHOR$ WITH ALI�CAND STABILIZER EVERY TIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH DIAGONAL TIE CONNECTION POINTS LORIDA VERTICAL) 4. Select the correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a 40 to 45 degree angle is maintained. PIER HEIGHT (Approx. 45 degrees Max.) 24 3/4" to 32 1 /4" 1,25" ADJUSTABLE Tube Length 32" 1.50" ADJUSTABLE Tube Length 16" 40" to 45" Ulf 5, Install (2) of the 1.50" square tubes (E (18" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjustment. 6. Place I -beans connector (F) loosely on the bottom flange of the I-beam. and fasten loose) with bolt and nut. 7. Slide the selected 1.25" tube (E) into a 1.50" tube (E) and attach to I-beam connectors (F) Y 8. Repeat steps through 7 to create the "V" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree and not below 40 degrees. 9. After all bolts are tightened, secure 1,25" and 1.50" tubes using four(4) 1/4"-14 x 3/4" self -tapping screws in pre -drilled holes. II,ICTAI 1 ATI(�N 0 LATERAL TELESCOPING TRANSVERSIcA,�,M SYSTEM THE MODEL 1101 "V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES $ FRAME TIES. NOTE: THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 514". FOUR FOOT 141) GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. 10. Install remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchors to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 Ibs, require a V anchor. 11. NOTE: Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location. This frame tie & stabilizer plate needs to be located within 18" from of center ground pan. 12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The lengths come in either 60" or 72" lengths, (With the 1.50" tube as the bottom tube, and the 1.25" tube as the Inserted tube.) 13. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. 14, Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam Connector ( I ) with bolt and nut. ecure transverse arm to transverse arm using our - x se - ppmg screws In pre- n e o es. MANUFACTURED Fax: 931- HOUSING FOUNDATION SYSTEMS Telephone: 6-8511 4555 A DIVISION OF OLIVER TECHNOLOGIES, INC. 1-800.284-7437 www.olivenechnologlhnologles.00m ij (��r COP-�Y