HomeMy WebLinkAboutEngineer Report 04132021, 4.29.21BREITENBACH ENGINEERING, INC johnbach442@gmail.com
4853 SE Pilot Way, Stuart, Florida 34997 Cell: (772) 834-4743
April 13, 2021
To: Building Official, St. Lucie County, Building Division
2300 Virginia Avenue, Fort Pierce, Florida 34982
Re: Specialty Building Inspections for Threshold Building Permit #SLC 2008-0353
Project: PT Cable repair and replacement of stair well doors
The Admiral Condo Attn: Lisa Kusen lisak@advpropmgt.com
8750 S. Ocean Drive, Jensen Beach, FL 34957 772-408-7538
General Contractor:
Daniello Attn: Chris Arias 561-352-4280
2708 N. Australian Ave, West Palm Beach, FL 33407
Building Official:
This letter is to inform you as threshold building special inspector, John Breitenbach PE 59770, SI
#2072 that the Contractor, to the best of my knowledge, has successfully completed the Post
Tension Cable Repair and the Door replacements as outlined in the Plans and Specifications of
CSM Engineers, dated July 2020.
The inspection log is attached.
Should you have any questions, please contract me.
Respectfully, �rErtrrr,,,
"'0 , FLURV�3. aC�
<'SS
rr.
John D. Breitenbach, PE
FL PE #59770, FL SI #2072, Firm Reg. #26001
(2)-copies to Contractor, (1)-copy to CSM, (1)-copy to Condo Assoc
file= 20033-8-Admiral
7-24-20 Admiral Letter of Intent.doc
20033-8-Admiral
[Breitenbach Engineering, Int, fel: 772-834-4743 iohnbach442(a)gmail.con
4R53 SE Pilot Wpv, Stuir#, F!.. 349917
Attention:
e-mail:
Lisa Kuser,
Condo Assoc: The Adr- ral Condo Assoc
18750 S Ocean Drive
Jensen Beach, FL 34957
By: John D. Breitenbach, �'
PE #59770 SI #2072
Permit Number: SLC 2008-0353
Job Number: 20033-8
p mgt. co m 772-408-7538
Contact: F��
hris Arias
Contractor: 7anbiello Constructic�
Address: �2708 N Australian Ave, WPB, FL 334iN Australian Ave, WPB, FL 334C
'el: 772-834-4743 Gate Code: ! none
ohnbach442(Q_gmaiLcom Billing Method: Hourly
Date fours Mr) rrinti01?V T,rnp Cnmr—..c-nts
P^ —/Fail
7/13/20
2.00
Meeting, teleconferenc
n.a.
7/24/20
1.00
Letter of Intent
n.a.
9/15/20
1.50
PT cable
Wed
2:00
Observe tensioning, calibration, 33 k (see attached)
passed
9/16/20
1.0C
report, certification
set up forms
n.a.
and ing iron
I
jAdministrative, reports & mailing
11/2/20
1.50
stair tower doors
Mon
11:301
Floors 17-9, see memo
progress
11/16/20
1.00
doors
Floors 16,15
passed
4/9/21
all doors
passed
4/12/21
1.00
final completion letter
n.a.
4/12/2-
Administrative, reports & mailing
n.a.
of NoverW -
Administrative, reports & mailing
Inspection..: re perfon ' by the special inspector per the permitted plans anu sons a..ording to the International C
Repair Institute (ICRI). Th= '`tC and ACI-318 do not address concrete restoration. and County forms are not legal per law.
Total Hrs: 9.00 See Letter of Intpnt and the Engineer's Plans & Specifi;•ations for additional information.
Send via: [ ] e-mail [ x ] U.S. Mail