Loading...
HomeMy WebLinkAboutProject InformationST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A,B,C 1,2,3,4,5,6,7 Prescriptive BUR-RAS 150 A,B,C 2,4,5,6,7 Asphaltic Shingles A,B,D 1,2,4,5,6,7 Concrete or Clay Tile A,B,D,E 1,2,3,4,5,6,7 Metal Roofs A,B,D 1,43,45,6.7 Wood Shingles and Sh k 1,; 1 : A,B,D 12,4,5,6,7 Otfier Al As Applicable ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description V Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval V 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 4621 Edwards Rd, Fort Pierce, FL 34981-4516 BRILLIANT ROOFING br:ltla 1—f-- Brilliant Roofing 4149 S.E. Salerno Rd. STUART, FL 349976936 tel. 772-713-0595 email: troyglowthsr@gmail.com CODE CO L1Ai 1A—= ST. LUCIE COUNTY' SOCC File Copy _ ea Ieview, _ g REPORT QuickSquaresT" April 28, 2021 Roof #1 Area: 40 Squares Roof #2 Area: 19 Squares rile Co-r ,' Predominant Pitch: 4 100% CG\� jt0 This report includes u to two structures on a residential roe and one structure on a multi -family roe The Itch '"'"`E P P property rtY Yp property. P has been factored into the calculation with no waste. Please upgrade to a Premium Report to receive measurements for Satisfaction Guaranteed additional structures and for any lower roof areas that may be obscured from view in the top -down image, as they are not www.eaglevfew. com/Guarantee included in the totals on this report. Upgrade Your Report! QuickSquares is a report used to estimate the overall size of the roof; for material -ordering accuracy, contractors should upgrade to a Premium Report. The price of your QuickSquares report will be deducted from your upgrade. A Premium Report includes: • 3D Roof Diagram • Length Diagram • Area Diagram • Aerial Images (Top, N, S, E & W) • Notes Diagram • Pitch Diagram • Waste Calculation Table • Report Summary •Customizable Report • Square Footage Pitch Table © 2008-2021 Eagle View Technologies, Inc. and Pictometry International Corp. - All Rights Reserved - Covered try one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 9,183,538; 8,818,770; 8,542,880; 9,244,589; 9,329,749. Other Patents Pending. ST. LUCIE WORKS Section D (Steep Slope Roof System) Roo rJ2- \ e� Notice of Acceptance Number: FL'3Q?4�'-) .M 2- Minimum Design Wind Pressures, If Applicable (From1 �R'A41�S 127 or Calculations): Zone 1:�Zone 2e: Zone 2n:1Zone 2r:140 Zone 3el 3 one 3r: C: Roof Slope: S- : 12 Ridge Ventilation? Deck Type: I P Ly V-,I bc) Type Underlayment \ Du-�* � rLt �� , Insulation: Fire Barrier: Fastener Type & Spacing: Adhesive Type: Mean Roof Height: -71 Type Cap Sheet: �:�i Roof Covering: -TUPC-' V\e-;, rnE L_ Type & Size Drip 3 1 Edge: REVEL ED FOR CODE COMPLIANCE ST. LUCIE COUNTY File Copy ST. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mf. If the Mf values are greater than or equal to the Mrvalues, for each area of the roof, then the tile attachment method is acceptable. Method 1 'Moment Based Tile Calculations Per RAS 12T (Zone 1 : x = _ Mg; = Md Product Approval Mi (Zone 2e: x ;L = _) - Mg: = Mft Product Approval Mr (Zone 2n: x A = _) -- Mg: = Mom, Product Approval Mf (Zone 2r: - x = _) - Mg: = M& Product Approval Mf (Zone 3e: x X Mg: = Mo. Product Approval Mf (Zone 3r: x = Mg: = Ms, Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Product Approval Mr Mr required Moment Resistance* Mean Roof Height Roof Slope 15' 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment based tile systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: x L =x W:= ) -W: cos r =Fri Product Approval F' (Zone 2e: x L =x W:= ) -W: cos r =Fr2e Product Approval F' (Zone 2n: x L =x W:= ) -W: cos r =Fr2n Product Approval F' (Zone 2r: x L =x W:= ) -W: cos r =Fr2r Product Approval F' (Zone 3e: x L =x W:= ) -W: cos r =Fr3e Product Approval F' (Zone 3r: x L =x W:= ) -W: cos r =Fr3r Product Approval F' Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope 6 Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Gravity Mg Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Mg Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L = length W = width Product Approval All calculations must be submitted to the building official at the time of permit application.