HomeMy WebLinkAboutCreekside Lot 42-Bond Beam.pdf®UNIVERSAL
ENGINEERING SCIENCES
Inspection Date: 4- Z I - Z
Project: 0 avP_ 4 5 �, 6
Address: 3 3 2 Z %21 A ij
Check one:
n Regular Inspection:
❑ Reinspection
INSPECTION RESULTS
Permit No. mil/ — 0 / 6
Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: .1z8 /d', e-f —
Inspection Results: 4 AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: O e 5 tax 5;�,u v-
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: /6� k I Lic.#: )SA) `f l- is �
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com