Loading...
HomeMy WebLinkAboutCreekside Lot 42-Bond Beam.pdf®UNIVERSAL ENGINEERING SCIENCES Inspection Date: 4- Z I - Z Project: 0 avP_ 4 5 �, 6 Address: 3 3 2 Z %21 A ij Check one: n Regular Inspection: ❑ Reinspection INSPECTION RESULTS Permit No. mil/ — 0 / 6 Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: .1z8 /d', e-f — Inspection Results: 4 AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: O e 5 tax 5;�,u v- 1. 2. 3. 4. 5. 6. 7. Inspector's Name: /6� k I Lic.#: )SA) `f l- is � OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com