HomeMy WebLinkAboutCreekside Lot 82-Window & Door Bucks.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: `� �3 Z/ Permit No.
Project: a(1Qa-A'5
Address: 3 3 `f 9 T /L(N c 721 C IA -
192-
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
o2`O//- C-�)/?/
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I
I Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: `3 3 W /D 6 c`c(c'
Inspection Results: KP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready p
Conditions/Comments: CK /LI 9 T2/it A C u S ed 40 rL 5Tg-N elf
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: Lic.#:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamafa.com