Loading...
HomeMy WebLinkAboutProduct Approval (2) AL-FAROOQ CORPORATION CONSULTING ENGINEERS & PRODUCT DEVELOPMENT PRODUCT APPROVAL EVALUATION RULE CHAPTER#61 G20-3 • METHOD 1 OPTION D FL 19092 Date: 02/09/2021 Detailed Product Description: Manufacturer: MR-GLASS DOORS&WINDOWS MANUFACTURING LLC. Manufacturer Address: 8051 NW 79th PLACE, MEDLEY, FL 33166 Model Name: MG-1000 ALUMINUM SLIDING GLASS DOOR Maximum Load:+120 PSF,-140 PSF(Large Missile Impact) Installation Drawings#W15-83 This product complies with the High Velocity Hurricane Zone(HVHZ)testing requirements. For maximum sizes,combination of span vs loads and anchor type refer to installation drawings. Comparative analysis used X Yes —No Mandatory Tests(Tested in accordance with AAMA 101/I.S.2/NAFS/TAS-202) TEST DESCRIPTION ­ TEST LOCATION TEST.REPORT; TEST Test Sealed.by, T. DATE REPORT#:: ASTM E283 Air Infiltration Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega,P.E. Leakage Laboratory 10/23/2015 FTL-8591 Idalmis Ortega,P.E. 10/25/2015 FTL-8594 Idalmis Ortega,P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E.Droz-Seda,P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E.Droz-Seda,P.E. 01/12/2021 HETI-20-8102 Rafael E.Droz-Seda,P.E. ASTM E331 Water Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega,P.E. OR ASTM 547 Penetration Laboratory 10/23/2015 FTL-8591 Idalmis Ortega,P.E. &TAS 202 10/25/2015 FTL-8594 Idalmis Ortega,P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E.Droz-Seda,P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E.Droz-Seda,P.E. 01/12/2021 HETI-20-8102 Rafael E.Droz-Seda,P.E. ASTM E330 Uniform Static Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega,P.E. &TAS 202 Air Press. Laboratory 10/23/2015 FTL-8591 Idalmis Ortega,P.E. 10/25/2015 FTL-8594 Idalmis Ortega,P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E.Droz-Seda,P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E.Droz-Seda,P.E. 01/12/2021 HETI-20-8102 Rafael E.Droz-Seda,P.E. ASTM F842 Forced Entry Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega,P.E. Laboratory 10/23/2015 FTL-8591 Idalmis Ortega,P.E. 10/25/2015 FTL-8594 Idalmis Ortega,P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E.Droz-Seda,P.E &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E.Droz-Seda,P.E. 01/12/2021 1 HETI-20-8102 I Rafael E.Droz-Seda,P.E. UNT U if 9360 Sunset Drive Ste 220 1 Miami,FL 33173 1 T:305.264.8100 F:305.262.6978 www.afceng.com I alfarooq@afcens.com Supplemental Tests(Tested in accordance with TAS-201 and TAS-203) TESTS x `�: DESti&TION TEST LOCATION, TEST REPORT TEST REPORT Test;Sealed by > DATE'• #' _ FBC 1626.2 Large Missile Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega,P.E. TAS 201&203 Impact&Cyclic Laboratory 10/23/2015 FTL-8592 Idalmis Ortega,P.E. ASTM 10/23/2015 FTL-8596 Idalmis Ortega,P.E. E1886/1996 10/23/2015 FTL-8593 Idalmis Ortega,P.E. ANSI Z97.1 10/23/2015 FTL-8591 Idalmis Ortega,P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E.Droz-Seda,P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E.Droz-Seda,P.E. 01/12/2021 HETI-20-8102 Rafael E.Droz-Seda,P.E. Under the limitations of the attached installation drawings,to the best of my knowledge and ability,the above product conforms to the requirements of the 2020 Florida Building Code. Evaluation Report Engineer: FARO 'QV'JGENgF0O No.81224 � ST Jalal Farooq PE#81223 S / 10NAL E�\?\ AI-Farooq Corporation EB#3538 � '"'111 o \ Sealed: 2/15/2021 9360 Sunset Drive Ste 220 1 Miami,FL 33173 1 T:305.264.8100 F:305.262.6978 1 www.afceng.com I alfarooq@afceng.com