Loading...
HomeMy WebLinkAbout213360-1pd Pool Backfill -signed Headquarters � CP IL t ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 &J LVL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.#5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: May 4, 2021 KSM JOB# : 213360-1pd/SH/bm PERMIT#: 2012-0712 CONTRACTOR: Louden Pools NUC# 528 Nuc Model: MC-IDR-P JOB LOCATION: 9630 Knollwood Lane Nuc Serial#: MD049528 Ft Pierce, Florida ITEM TESTED Pool Backfill Compaction TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE COMPACTION 1 West 0'-1' 37 105.6 108.9 97.0% 2 1'-2' 38 - " 95.0%+ 3 2'-3' 40 - " 95.0%+ 4 3'-4' 40 - " 95.0%+ 5 South 0'-1' 38 106.7 108.9 98.0% 6 1'-2' 38 - " 95.0%+ 7 2'-3' 39 - " 95.0%+ 8 3'-4' 40 - " 95.0%+ 9 East 0'-1' 37 106.2 108.9 97.5% 10 1'-2' 39 - " 95.0%+ 11 2'-3' 40 - " 95.0%+ 12 3'-4' 40 - " 95.0%+ Soil Description: Brown Sand W 110.0 In Place Moisture: E 9.8% 1 109.0 �..�..—.�—.. ..—�.—.. I ..—�..—..�—..— I I I I I I Proctor Optimum Moisture: G 12.0% H 108.0 Proctor Max. Dry Density: P.C.F. T D I I I I I I I 108.9 R107.0 @ Test Locations the Density& P Y I I I I I Penetrometer reading indicate the 106.0 I I I I I I I Degree of Compaction Meets Minimum Requirement F 105.0 I• I—•• I ••— I•—•• I ••—I••—••I—••_ for Plumbed Backfill I I I I I I Respectfully Submitted: Digitally 104.0 —1 —•1— 4..—.1.— —1••—..1— — • I I I I I I I signed by 103.0 ..—.;—..T..—.;.—..T..—;..—..;—..� This item has been elettronically signed and Bryan E 7 8 9 10 11 12 13 14 15 sealed by Bryan E.Dahlke,PE FL.Lic.81439 an,the°ate""'°directlyto the right"sing ii Dahlke Moisture -% of Dry Weight signature. Primes copies-hi,eaaments are not onsieere ignee aneseale,n yy n the lectronic ature must be venfled on Date: Disclaimer: Contractor is responsible to maintain sign a e <oPiea. 2021.05.05 the pool backfill in the condition that KSM completed the indicated passed compaction test. 14:25:00 KSM is not responsible if the poolbackfill has been -04'00' altered from the approved inspected condition. Bryan E. Dahlke, P.E.V.P. of Engineering PE#81439 5/5/2021 Email to: Loudenmary@aol.com Test report shall not be reproduced,except in full,without the written approval of KSM Engineering&Testing Geotechnical Engineering-Construction Materials Testing -Special Inspections-Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business-WBE