Loading...
HomeMy WebLinkAbout2021-05-06 14-57 Planning&Development Services Building&Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone, 772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification e Prescriptive and Performance Method Date: Permit#: 1- Contractor: a�� —(, ,►� �� Job Address: Construction: �� New Construction —Complete ( Existing—After Addition House Infiltration Test Results SLC Climate Zone 2 CFM (50)_ Test Date: f 1 �� 1-'--1 Volume= ACH (50)=CFM (50)x 60/Volume= s,� Mechanical Ventilation required less than 3 ACH Passing results must be&ACH (50)or less (Pass ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or(7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g)or(i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC,Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w.c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole-house mechanical ventilation in accordance with Section M1507.3. Testing Company Company Name: Pro-Duct Services Address: 1915 Rio Vista Drive, Ft, Pierce, FL 34949 I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance with Sec on R402.4.1.2 Climate Zone 2. Signature: Printed Name: Martin Klein License/Certification M. 5061633 Planning& Development Services Building&Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34992 772462-2165 Fax 772462-6443 e FBC ENERGY CONSERVATION CODE Duct sealing Certification Prescriptive and Performance Method Date: 1' A Pennil#: 'I-0 o d(t 2 Lot#: 2 �— contractor: �o� �.�r l Address: 2 b A Consh)cbm: ,most Construction Test ❑Rough-in Test Test Conditions: Date 21 Floor Area(ft2): 2 S r Time: i 1 :tf Primary Location of Supply Ductwork Indoor Temperature(F): Primary Location of Return Ductwork r i1�✓ Outdoor Temperature(F): $1 Tout i eakacre Test(Otgodel Duct Leakage: ❑Default �erop.Leak Free ja-Proposed On= Test Pressure: _�.S(Pa) Baseline Duct Pressure(optional) o(t (Pa) Duct Press.(Pa) Flow Ring Fan Press Flow(cfm) Results:N+ass a Fail Installed Pa r Z d Total Leakage(cfm): C7 Total Leakage per 100 sgft: ev ° • t-� CFM25 x 100 divided by the CFA=Duct LeaiuMp CF1W100 sgtt. Te:;bno Ccetoarw n /' �c �vwy fang; Pro-Dml Somees Addrw: t�J V i l.9 r w 1�. t_ i�� r t F� T�' I hereby oerbfy that Bn ebm Duct 6selinp Leakep mw b detnonetmto complienoe whh P Edition FBC Energy Conseewrft MgrirenW&In aeeordenes wish Section R40322. WV __— Prinded NW": Martin Klein LioenealCettltioate tf: 5061§33