HomeMy WebLinkAboutAPPROVED Product Approval (2)AL-FAROOQ CORPORATION
CONSULTING ENGINEERS & PRODUCT DEVELOPMENT
PRODUCT APPROVAL EVALUATION
RULE CHAPTER #61 G20-3 • METHOD 1 OPTION D
FL 19092
Date: 02/09/2021
Detailed Product Description:
Manufacturer: MR -GLASS DOORS & WINDOWS MANUFACTURING LLC.
Manufacturer Address: 8051 NW 79th PLACE, MEDLEY, FL 33166
Model Name: MG-1000 ALUMINUM SLIDING GLASS DOOR
Maximum Load: +120 PSF, -140 PSF (Large Missile Impact)
Installation Drawings # W15-83
This product complies with the High Velocity Hurricane Zone (HVHZ) testing requirements.
For maximum sizes, combination of span vs loads and anchor type refer to installation drawings.
Comparative analysis used X Yes —No
Mandatory Tests (Tested in accordance with AAMA 101/I.S.2/NAFS/TAS-202)
TEST
DESCRIPTION
TEST LOCATION
TEST.REPORT ;
TEST,
- Test�Sealed.by
DATE
REPORT,
:.... <:
ASTM E283
Air Infiltration
Fenestration Testing
10/23/2015
FTL-8590
Idalmis Ortega, P.E.
Leakage
Laboratory
10/23/2015
FTL-8591
Idalmis Ortega, P.E.
10/25/2015
FTL-8594
Idalmis Ortega, P.E.
Hurricane Engineering
05/21/2020
HETI-20-8058
Rafael E. Droz-Seda, P.E.
& Testing Inc.
05/21/2020
HETI-20-8068
Rafael E. Droz-Seda, P.E.
01/12/2021
HETI-20-8102
Rafael E. Droz-Seda, P.E.
ASTM E331
Water
Fenestration Testing
10/23/2015
FTL-8590
Idalmis Ortega, P.E.
OR ASTM 547
Penetration
Laboratory
10/23/2015
FTL-8591
Idalmis Ortega, P.E.
& TAS 202
10/25/2015
FTL-8594
Idalmis Ortega, P.E.
Hurricane Engineering
05/21/2020
HETI-20-8058
Rafael E. Droz-Seda, P.E.
&Testing Inc.
05/21/2020
HETI-20-8068
Rafael E. Droz-Seda, P.E.
01/12/2021
HETI-20-8102
Rafael E. Droz-Seda, P.E.
ASTM E330
Uniform Static
Fenestration Testing
10/23/2015
FTL-8590
Idalmis Ortega, P.E.
& TAS 202
Air Press.
Laboratory
10/23/2015
FTL-8591
Idalmis Ortega, P.E.
10/25/2015
FTL-8594
Idalmis Ortega, P.E.
Hurricane Engineering
05/21/2020
HETI-20-8058
Rafael E. Droz-Seda, P.E.
&Testing Inc.
05/21/2020
HETI-20-8068
Rafael E. Droz-Seda, P.E.
01/12/2021
HETI-20-8102
Rafael E. Droz-Seda, P.E.
ASTM F842
Forced Entry
Fenestration Testing
10/23/2015
FTL-8590
Idalmis Ortega, P.E.
Laboratory
10/23/2015
FTL-8591
Idalmis Ortega, P.E.
10/25/2015
FTL-8594
Idalmis Ortega, P.E.
Hurricane Engineering
05/21/2020
HETI-20-8058
Rafael E. Droz-Seda, P.E
& Testing Inc.
05/21/2020
HETI-20-8068
Rafael E. Droz-Seda, P.E.
01/12/2021 1
HETI-20-8102 I
Rafael E. Droz-Seda, P.E.
UNT U if
9360 Sunset Drive Ste 220 1 Miami, FL 33173 1 T: 305.264.8100 1 F: 305.262.6978 1 www.afceng.com I alfarooci@afcens.com
Supplemental Tests (Tested in accordance with TAS-201 and TAS-203)
TESTS x:
DESCRIPxTION
TEST LOCATION,
? F
TEST REPORT
TEST REPORT
Test;Sealed by
>
DATE•
FBC 1626.2
Large Missile
Fenestration Testing
10/23/2015
FTL-8590
Idalmis Ortega, P.E.
TAS 201 & 203
Impact & Cyclic
Laboratory
10/23/2015
FTL-8592
Idalmis Ortega, P.E.
ASTM
10/23/2015
FTL-8596
Idalmis Ortega, P.E.
E1886/1996
10/23/2015
FTL-8593
Idalmis Ortega, P.E.
ANSI Z97.1
10/23/2015
FTL-8591
Idalmis Ortega, P.E.
Hurricane Engineering
05/21/2020
HETI-20-8058
Rafael E. Droz-Seda, P.E.
&Testing Inc.
05/21/2020
HETI-20-8068
Rafael E. Droz-Seda, P.E.
01/12/2021
HETI-20-8102
Rafael E. Droz-Seda, P.E.
Under the limitations of the attached installation drawings, to the best of my knowledge and ability, the
above product conforms to the requirements of the 2020 Florida Building Code.
Evaluation Report Engineer:
FAR
'QV' JG"*'*" 0O
81224
�
ST
\?\
Jalal Farooq PE # 81223
10NAL E�
AI-Farooq Corporation EB # 3538
'"' 111 o \ Sealed: 2/15/2021
9360 Sunset Drive Ste 220 1 Miami, FL 33173 1 T: 305.264.8100 1 F: 305.262.6978 1 www.afceng.com I alfarooq@afceng.com