Loading...
HomeMy WebLinkAboutAPPROVED Product Approval (2)AL-FAROOQ CORPORATION CONSULTING ENGINEERS & PRODUCT DEVELOPMENT PRODUCT APPROVAL EVALUATION RULE CHAPTER #61 G20-3 • METHOD 1 OPTION D FL 19092 Date: 02/09/2021 Detailed Product Description: Manufacturer: MR -GLASS DOORS & WINDOWS MANUFACTURING LLC. Manufacturer Address: 8051 NW 79th PLACE, MEDLEY, FL 33166 Model Name: MG-1000 ALUMINUM SLIDING GLASS DOOR Maximum Load: +120 PSF, -140 PSF (Large Missile Impact) Installation Drawings # W15-83 This product complies with the High Velocity Hurricane Zone (HVHZ) testing requirements. For maximum sizes, combination of span vs loads and anchor type refer to installation drawings. Comparative analysis used X Yes —No Mandatory Tests (Tested in accordance with AAMA 101/I.S.2/NAFS/TAS-202) TEST DESCRIPTION TEST LOCATION TEST.REPORT ; TEST, - Test�Sealed.by DATE REPORT, :.... <: ASTM E283 Air Infiltration Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega, P.E. Leakage Laboratory 10/23/2015 FTL-8591 Idalmis Ortega, P.E. 10/25/2015 FTL-8594 Idalmis Ortega, P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E. Droz-Seda, P.E. & Testing Inc. 05/21/2020 HETI-20-8068 Rafael E. Droz-Seda, P.E. 01/12/2021 HETI-20-8102 Rafael E. Droz-Seda, P.E. ASTM E331 Water Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega, P.E. OR ASTM 547 Penetration Laboratory 10/23/2015 FTL-8591 Idalmis Ortega, P.E. & TAS 202 10/25/2015 FTL-8594 Idalmis Ortega, P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E. Droz-Seda, P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E. Droz-Seda, P.E. 01/12/2021 HETI-20-8102 Rafael E. Droz-Seda, P.E. ASTM E330 Uniform Static Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega, P.E. & TAS 202 Air Press. Laboratory 10/23/2015 FTL-8591 Idalmis Ortega, P.E. 10/25/2015 FTL-8594 Idalmis Ortega, P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E. Droz-Seda, P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E. Droz-Seda, P.E. 01/12/2021 HETI-20-8102 Rafael E. Droz-Seda, P.E. ASTM F842 Forced Entry Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega, P.E. Laboratory 10/23/2015 FTL-8591 Idalmis Ortega, P.E. 10/25/2015 FTL-8594 Idalmis Ortega, P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E. Droz-Seda, P.E & Testing Inc. 05/21/2020 HETI-20-8068 Rafael E. Droz-Seda, P.E. 01/12/2021 1 HETI-20-8102 I Rafael E. Droz-Seda, P.E. UNT U if 9360 Sunset Drive Ste 220 1 Miami, FL 33173 1 T: 305.264.8100 1 F: 305.262.6978 1 www.afceng.com I alfarooci@afcens.com Supplemental Tests (Tested in accordance with TAS-201 and TAS-203) TESTS x: DESCRIPxTION TEST LOCATION, ? F TEST REPORT TEST REPORT Test;Sealed by > DATE• FBC 1626.2 Large Missile Fenestration Testing 10/23/2015 FTL-8590 Idalmis Ortega, P.E. TAS 201 & 203 Impact & Cyclic Laboratory 10/23/2015 FTL-8592 Idalmis Ortega, P.E. ASTM 10/23/2015 FTL-8596 Idalmis Ortega, P.E. E1886/1996 10/23/2015 FTL-8593 Idalmis Ortega, P.E. ANSI Z97.1 10/23/2015 FTL-8591 Idalmis Ortega, P.E. Hurricane Engineering 05/21/2020 HETI-20-8058 Rafael E. Droz-Seda, P.E. &Testing Inc. 05/21/2020 HETI-20-8068 Rafael E. Droz-Seda, P.E. 01/12/2021 HETI-20-8102 Rafael E. Droz-Seda, P.E. Under the limitations of the attached installation drawings, to the best of my knowledge and ability, the above product conforms to the requirements of the 2020 Florida Building Code. Evaluation Report Engineer: FAR 'QV' JG"*'*" 0O 81224 � ST \?\ Jalal Farooq PE # 81223 10NAL E� AI-Farooq Corporation EB # 3538 '"' 111 o \ Sealed: 2/15/2021 9360 Sunset Drive Ste 220 1 Miami, FL 33173 1 T: 305.264.8100 1 F: 305.262.6978 1 www.afceng.com I alfarooq@afceng.com