Loading...
HomeMy WebLinkAbout30-Day Temporary Power Releasei Planning .& DeviAopmeni Services Building & Code Regulation Division 2300. Virginia Ave Fort pierce,, FL 34982 772-462-2165 Fax 772-462-6443 Requestfor 30-bay Temporary Power Release Date: � Permft'Niamber: VUo " \. Project Address: _ \ Q O�, Q�,� S- THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED -THIRTY (30) DAYS, FOR THE PU"OSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARA17ON FOR A .FINAL INSPECTTON. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS., I. This temporary .power release is requested fbr the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we heribby agree to abide by all terms and conditions of this agreement, including Building Division Pollcy, which is incorporated herein by reference. 3. Ali conditions and requirements listed in the attached document entitled " Requlrements for 30 Day Power for Testing,7 have been fulfilled and the premise is ready fbr compliance inspection. 4. All requests for an e)dension beyond 30 days must be made in writing to the Building Official stating the reason' for the request. Power may be removed from, the site and/or a Stop Work.Order issued if the Flnal'inspection has not been approved within 30 days. A fee of $10d.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, Si'. LUCIE COUNTY, AND THE P, EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH *MAY SE INC[1E�D DUE TO THE DTSCONNEcrION OF EMCTRICAL POWER IN THE E1/ENT OF VIOLATION OF THIS AGREEMENT, OWNER SIGNATURE DATE SIGNATURE ' DATE R'ECEIVE0 MAY,"9,,.3 2017 68£-d 1,000/ A000d £80-1 999L8LRLL da o0 6u i p l i n8 euuAM -WOaA 90:1 L L L ,- £z-90