PERMIT #: 21020198 JOB ADDRESS: 5512 PINETREE DR
BUILDER/CONTRACTOR: DETAILED ENTERPRISES
PEST CONTROL CONTRACTOR:
PEST CONTROL LICENSE #: JB5431
REYNOLDS PEST MANAGEMENT
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: 400 SQ FT Chemicals used: DOMINION 2L
Percentage of solution: •067 Total gallons used: 40
Date of Treatment: 4/21/2021
x Footing
X 1st Treatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Time of Treatment: 11:53AM
Slab
1st Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
qPeril eter for Final Inspection
Signaure ofExterminator D to
Note • There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection w/ll fail and a re -inspection
fee charged.
FBC 104.2.E Cert/f/cate of protective Treatment for prevent/on of termites. A weather resistant jobsite posting board
shall be pro v/ded to receive duplicate Treatment Certificates as each required protective treatment /s completed,
prov/d/ng a copy for the person the permit /s Issued to and another copy for the building permit files The Treatment
Certificate steal/pro vide the product used, Identity of the applicator, time and date of the treatment, site location, area
treated, chem/cal used, percent concentration and number of gallons used, to establish a verifiable record of
protect/ve treatment. If the so// chemical barrier method for termite prevent/on /s used, final exter/or treatment shall
be completed pr/or to final bu//d/ng approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.