Loading...
HomeMy WebLinkAboutCreekside Lot 38-Wall Sheathing.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: _,�-- `% -zY Permit No. �;? o /_ % V Project: CaK5i64 Address: 33'12 7" L& Ty L�i2 38 Check one: V1 Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: f LO A-u_ 5 7,, Inspection Results: I AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready n Conditions/Commentsz2 4-7A->-�l-/ .vim-- Sze_- 1. 2. 3. 4. 5. 6. 7. Inspector's Name: be, Lic.#: 6 P 4 G � OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com