April 1, 2021
Gerald&Billie Jo Selinsky
1316 White Oak Lane RECEIVED
Fort Pierce,FL 34982
APR 2021
1316 White Oak Lane Ft Pierce,Florida sT. Lucie County, Permitting
Re: Soil Compaction after placement of Foundation REND---
KSM#: 212429-HBK
APR 20 2021
- To Whom It May Concern: ST..Lucie County, Permitting
KSM Engineering and Testing(KSM hereinafter)has been requested to perform subsurface testing
in order to-determine the degree of compaction of the foundation soils under the existing structure
as it has been brought to our attention that the foundation was poured for the above mentioned
garage structure without verification of the soil compaction.Representatives from KSM conducted
the required exterior subsurface testing on March 31, 2021. .
Scope of Compaction test:
Since the foundation has been poured prior to the soil compaction testing, KSM is unable -to
perform standard compaction tests within the footprint of the structure or under the foundation-. In
order not to undermine the existing foundation, KSM technicians selected 4 random locations
along the exterior of the structure to dig down adjacent to the foundation. Locations were selected
along each side of the structure in areas thus not to affect any landscaping.
At this elevation KSM technicians collected a soil sample for the required modified proctor then
performed a density reading using a nuclear density gauge against the foundation of the structure:.
KSM technicians also used a static cone penetrometer to probe underneath the foundation to
determine the soil resistance beneath the foundation. Upon completing the indicated density
reading and probe,the location was filled back in with the existing soil.
The exterior test locations are selected at random,unless KSM is instructed to perform the tests in
certain areas by the Engineer of Record or Builder/Client submitted in writing prior to our visit to
the site..With the collected field data, KSM followed the procedures indicated within ASTM D
1557 and ASTM D 6938 to determine the degree of compaction.
Proudly Serving Florida since 1990
Page 1 of 2
Page 1 of 3
Headquarters Te 'C! 14 ENGINEERING Mailing.
11345 U.S. Highway 1 P.O.Box 78-1377
Orlando n,FL.32958 TESTING hoe:772 589-012
1V% AND
723 Progress Way C.A.#5693
Sanford,FL. 32771 KSMengineering.net
Unless requested by the Engineer of Record or Builder/Client, KSM's scope is to determine_the
exterior foundation degree of compaction only.'The density gauge will only indicate the dry
density of the soil 12" below the gauge. If interior soil compaction verification or deeper
compaction verification is required,please contact our office for a proposal.
The visual observations of KSM serve to document or evaluate the condition of the structure or
assemblies at the time of the inspection within a reasonable professional engineering probability .
and certainty. All conclusions -or recommendations are based upon testing, observations, or
information gathered on-site prior to completion of this document. If field conditions change or
differ than.as stated in this document, it is the responsibility of all parties to contact KSM for
additional review.
Conclusions and Recommendations:
Please find the attached Soil Compaction Report following this fetter(page 3 of the overall report)
indicating the test results of the nuclear density gauge, modified dry proctor and static cone
penetrometer readings.
Based upon our review of the field collected data and laboratory testing, within a reasonable
professional engineering certainty,the compaction of the soils underneath the foundation meets or
-exceeds 95.% of the modified dry proctor and the penetrometer readings indicate the soils to be
generally firm, thus the soils-are compacted properly within 12" below the foundation bearing
elevation within the areas tested.
If you have any questions'about this letter,please contact my office.
ar Re ds, ````���iii�i►ii��i
g E DA4o
�Q.,.•'��CENSF . .+
Digitally signed -
This item has been electronically signed and by B rya n E
No. 87439 sealed by Bryan E Dahlke,PE FL tic.81439
on the date stated directly to the right using D a h I ke
*' = a digital signature.
Printed copies of this documents are not _
considered slgned and sealed and the Date.
signature muse be verified on any electronic
0• STATE OF Z &;�
�coRID ' ���� copies. 2021 .04.01
�Szo1v ���`�� 14:34:32 -04'00'
Bryan E. DAM,P!BJ i i
Vice President of Engineering
Florida Lie.No. 81439
4/1/2021.
Email: BillieJoSelinsky@yahoo.com
Proudly Serving Florida since 1990
r
Page 2 of 2
Page 2 of 3
Headquarters UP CP V �' ENGINEERING Mailing
11345 U.S. Highway 1 PO Box 78-1377
Orlando Sebastian, FL.32958 1 %% AND TESTING Sebastian, FL.32978
Phone:772 589 0712 .
723 Progress Way _erL40I1-COMPACTION REPORT C.A.#5693
Sanford, FL. 32771 yrs ASTM D 1557 and ASTM D 6938 KSMengineering.net
DATE TESTED: March 31,2021 KSM JOB#: 212429-HBK/MH/bm
PERMIT#: NUC# 630
CONTRACTOR: Greald& Billie Jo Selinsky Nuc Model: MC-IDR-P
JOB LOCATION: 1316 White Oak Lane Nuc Serial#: 30630
Ft Pierce, Florida
ITEM TESTED: Compacted Fill adjacent to existing Foundation
TEST LOCATION PEN DRY MAX. DRY PERCENT
OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE(P.C.F) COMPACTION
Detached Garage
1. South Side 0"-12" 50 107.0 108.8 98.3%
2. East Side 50 107.3 98.6%
3. North Side 50 107.9 99.2%
4. West Side 50 108.1 99.4%
Soil,Description: W 110.0 i I• I I I I
Brown Sand E I I I
In Place Moisture: G 109.0I I I I
9.0% H I I I I I
T
Proctor Optimum Moisture: 108.0 -
10.0% P
Proctor Max. Dry Density:P.C.F. C I I I I I I
108.8 10 7.0 •_.I-. _.I._.._I._••—I.. ._...
F I I I I I
@ Test Locations the Density& I I I I
Penetrometer readings indicate the D 106.0 — — —
Degree of Compaction Meets R
Minimum Requirement Y
for Staked Foundation 105.0
Respectfully Submitted:. 7 8 9 10 11 12 13
Moisture-%of Dry Weight
Disclaimer: Contractor is responsible to maintain
the tested area in the condition that KSM
completed.the indicated passed compaction test.
KSM is not responsible if the tested area has been
altered from the approved inspected condition.
Bryan E. Dahlke,'P.E.
V.P.of Engineering
PE#81439 4/1/2021