HomeMy WebLinkAboutEngineering; Floor Joists'Bosecscade EME9 Single 16" BCI® 4500s-1.8
1st FloorTloorJoistslJ1(i762) (Floor Joist)
BC CALL® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
_.Job name: _ File name: __ N362326L&R.mmdl_ _
Address: Description: 1 st Floor\Floor Joists\J1(i762)
City, State, Zip: Specifier: CREEKS I DE
Customer: Designer:
Code reports: ESR-1336 Company: L O T 114
131
17-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind
Roof Live
B 1, 4"
703 / 0
176 / 0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead
Snow Wind Roof OCS
Live
Tag Description
Load Type Ref.
Start
End
Loc.
100%" 90%
115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
80 20
n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
ent:
100%
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Bole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
879 Ibs
14.4%
59.6%
Unspecified
B2 Hanger
2" x 1-3/4"
879 Ibs
76.5%
81.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
4;11034v o TS7
t
lit '�-ti '>.. j •�. ;1 i�
Page 1 of 82
Boise c scade 099E5 Single 16" BCI® 4500s-1.8
1st Floor\Floor JoistslJ1(i762) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ _ . _ ...._._ __ . --Filename: - - N362326L&R.mmdl .
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 2 of 82
6Boise cascade Single 16" BCIO 450As-1.8 �SSD
1st FloorlFloor JoistslJ1(i762) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: - _._ _. _ . __..___._.____.._...._...._File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
1311
17-09-00
Total Horizontal Product Length=17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 4"
703 / 0
176 / 0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead- Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos.. Moment -•••--: -3774 ft-Ibs... .--:.._.
_:.92:3°l0::_
__.„ . ___...100%..
,._...
.1-
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
.09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02 -..-
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
879 Ibs
14.4%
59.6%
Unspecified
B2 Hanger
2" x 1-3/4"
879 lbs
76.5%
81.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 3 of 82
`Boise Cascade - Single 16" BCI® 4500s-1.8
1st Floor1Floor Joists1J1(i762) - 01 (Floor Joist)
BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _.,._._._...._ .._._ .__..____.__..... __ . File name: _ .N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (1-/360) Total load deflectiori criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong-Tib, Inc.
BC CALC@ analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUS@ ,
Page 4 of 82
613olse cascade -- Single 16" BCI® 4500s-1.8
1st FloorlFloor JoistslJ1(U62) - 02 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _
___.__.__.._ .. _ ..., File._name:_ ..._N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J 1 (i762)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
131
17-09-00
Total Horizontal Product Length = 17-09-00
62
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
703/0
176/0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 1-25%
1 FC1 Floor Material
Unf. Lin. (lb/ft) ' L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
--Pos. Moment
., 3774.ft-Ibs-_.,,-.92.3%
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
879 Ibs
14.4%
59.6%
Unspecified
B2 Hanger
2" x 1-3/4"
879 Ibs
76.5%
81.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 5 of 82
&BolseCascade fflffEE Single 16" BCI® 4500s-1.8 1PASSED1
1st Flooffloor Joists\J1(i762) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _... ..__ ...... . .,File name:. N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 6 of 82
Single 16" BCIO 4500s-1.8
3
06oiseCascade
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
1st Flooffloor JoistslJ1(i762) - 03 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed
File name:
Description
Specifier:
Designer:
Company:
February 11, 2021 12:28:44
N362326L&R.mmdl
1 st Floor\Floor Joists\J 1(i762)
s®
0
131
n-09-00
Total Horizontal Product Length = 17-09-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
703/0
176/0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos.. Moment .. :.._, ..._...
3774 ft-Ibs
. . 92:3°5..,.,--
,,.._,:
. 100%_,..._....
_: . -. .. ..__ ..-•
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
879 Ibs
14.4%
59.6%
Unspecified
B2 Hanger
2" x 1-3/4"
879 lbs
76.5%
81.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 7 of 82
:Boise Cascade Single 16" BCI® 4500s-1.8
1st FloorlFloor JoistslJ1(i762) - 03 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ ...__... __. _.....__......___.._.....File name: _ N362326L&R,mmdl
Address: Description: 1st Floor\Floor Joists\J1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (1-/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based'on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAME), VERSA -RIM PLUS@ ,
Page 8 of 82
1Boise Cascade= Single 16" BCI® 4500s-1.8
1st FloorTloor Joists1J 1 (i764) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ ___._.. . _ ._. _.__ . .. ___. __ ... ._ File name: N362326L&R.mmdl_ .
Address: Description: 1st Floor\Floor Joists\J 1 (i764)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
17-09-00
Total Horizontal Product Length=17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
646/0
161 /0
B2, 2"
701 / 0
175 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
40 10 n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft)
L
01-07-15 17-09-00
Top
40 10 n\a
Controls Summary
YValue
% Allowable
Duration
Case
Location ~
Pos. Moment
3749 ft-Ibs
91.7%
100%
1
09-00-02
End Reaction
876 Ibs
81.1 %
100%
1
17-09-00
End Shear
860 Ibs
43.5%
100%
1
17-07-00
Hole #1 Shear
448 Ibs
81.6%
100%
3
05-00-00
Hole #2 Shear
511 Ibs
93.2%
100%
4
13-09-00
Total Load Deflection
U619 (0.337")
58.1 %
n\a
1
09-00-02
Live Load Deflection
U774 (0.269")
62.0%
n\a
6
09-00-02
Max Defl.
0.337"
33.7%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
807 Ibs
13.2%
54.7%
Unspecified
B2 Hanger
2" x 1-3/4"
876 Ibs
76.2%
81.1%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 9 of 82
Boise Cascade Single 16" BCI® 4500s-1.8 I
1st Floor\Floor JoistslJ1(i764) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ _ __ ___._____:._._. File name:.. ._ N362326L&R_mmdl _
Address: Description: 1st Floor\Floor Joists\J1(i764)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted -design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUSO ,
Page 10 of 82
013oise
Cascade --- Single 16" BCIO4500s-1.8
1st Floor\Floor Joists\J1(i766) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __ _ _ __.. _ . _ _.._. _........ _...._...________...__.__.____.File. name: . _ N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
n-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
586/0
147/0
B2, 2"
586 / 0
147 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
67 17 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos; Moment
3145 ft-Ibs.. ..,
_.,._76.9%
100%
1
End Reaction
733 Ibs
67.8%
100%
1
17-09-00
End Shear
719 Ibs
36.4%
100%
1
00-04-00
Hole #1 Shear
373 Ibs
67.9%
100%
3
05-00-00
Hole #2 Shear
428 Ibs
78.1 %
100%
4
13-09-00.
Total Load Deflection
U738 (0.283")
48.8%
n\a
1
09-00-02
Live Load Deflection
U922 (0.226")
52.1 %
n\a
6
09-00-02
Max Defl.
0.283"
28.3%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
' Material
B1 Wall/Plate
4" x 1-3/4"
733 Ibs
12.0%
49.7%
Unspecified
B2 Hanger
2" x 1-3/4"
733 Ibs
63.7%
67.8%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 11 of 82
'Boisecascade ; Single 16" BCI® 4500s-1.8
1st FloorlFloor JoistslJ1(i766) (Floor Joist)
BC CALCO Member Report Dry I 1 span No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __ __...._. ......... ....._ File name:. N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J 1 (i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 12 of 82
Boise cascade OMEEE Single 16" BCIO 4500s-1.8 �S
1st Flooffloor JoistslJ1(i766) - 01 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: ..__..File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
n-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
586/0
147/0
B2, 2"
586 / 0
147 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
67 17 n\a
Controls Summary
Value
%Allowable
Duration
Case
Location
Pos. Moment _.,--.3145-ft-Ibs
- :
.. - 76:9°/a• :._-,..100%
..
-. :.. 1
•09-00-02 - .._..._.....__ __ :,_._:_.._... .,..... ,._
End Reaction
733 Ibs
67.8%
100%
1
17-09-00
End Shear
719 Ibs
36.4%
100%
1
00-04-00
Hole #1 Shear
373 Ibs
67.9%
100%
3
05-00-00
Hole #2 Shear
428 Ibs
78.1 %
100%
4
13-09-00
Total Load Deflection
U738 (0.283")
48.8%
n\a
1
09-00-02
Live Load Deflection
L/922 (0.226")
52.1 %
n\a
6
09-00-02
Max Defl.
0.283"
28.3%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
733 Ibs
12.0%
49.7%
Unspecified
B2 Hanger
2" x 1-3/4"
733 Ibs
63.7%
67.8%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 13 of 82
eBoise Cascade Single 16" BCI® 4500s-1.8
1st FloorTloor Joists\J1(1766) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: ... .... File_name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J1(i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
'Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValueO ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 14 of 82
OBoise cascade IM99 Single 16" BCI® 4500s-1.8 P�SSI I
1st FloorlFloor JoistSW1(i769) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
- Job name: _ __._ _ .. _ ___.___._.__ ___ ._ File -name:..._ N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i769)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
1
17-09-00
B1 132
Total Horizontal Product Length = 17-09-00
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live .
Dead
Snow
Wind
Roof Live
B1,4"
817/0
204/0
B2, 2"
662 / 0
165 / 0
Load Summary
Live Dead
Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90%
115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
01-07-15
17-09-00
Top
73 18
n\a
2 J6(i771)
Conc. Pt.
(lbs) L
01-08-13
01-08-13
Top
308 77
n\a
.Controls Summary
Value
% All owable
Duration
Case
Location
Pos. Moment
3674 ft-lbs
89.8%
100%
1
08-07-13
End Reaction
827 lbs
76.5%
100%
1
17-09-00
End Shear
1021 lbs
51.7%
100%
1
00-04-00
Hole #1 Shear
401 lbs
73.2%
100%
3
05-00-00
Hole #2 Shear
49.5 lbs
90.2%
100%
4
13-09-00
Total Load Deflection
U625 (0.334")
57.6%
n\a
1
08-10-11
Live Load Deflection
U781 (0.267")
61.4%
n\a
6
08-10-11
Max Defl.
0.334"
33.4%
n\a
1
08-10-11
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
1021 lbs
16.7%
69.2%
Unspecified
B2 Hanger
2" x 1-3/4"
827 lbs
71.9%
76.5%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. .
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 15 of 82
&Boise Cascade
Single 16" BCl® 4500s-1.8
BC CALCO Member Report
Build 7493
Job.name: _ .....
Address:
City, State, Zip:
Customer:
1st Flooffloor JoistslJ1(i769) (Floor Joist)
Dry 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
_.._._...____._ ......__. __...__.._._..... ._File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J1(i769)
Specifier:
Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 16 of 82
OgNi
,Boise Cascade Single 16" BCI® 4500s-1.8
1st FloorTloor JoistsW I (i772) (Floor Joist)
BC CALC® Member Report Dry 11 span No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job_name:__ . __. .. . _ . ___. _. _ File name:_.. N362326L&R.mmdl .. _
Address: Description: 1st Floor\Floor Joists\J 1 (i772)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
n-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 4"
514/0
129/0
B2,2"
514/0
129/0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-02-00 17-09-00
Top
58 15 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2759ft-Ibs
67.5%
1.00%
1
End Reaction
643 Ibs
59.5%
100%
1
17-09-00
End Shear
631 lbs
31.9%
100%
1
00-04-00
Hole #1 Shear
327 Ibs
59.6%
100%
3
05-00-00
Hole #2 Shear
376 Ibs
68.5%
100%
4
13-09-00
Total Load Deflection
U841 (0.248")
42.8%
n\a
1
09-00-02
Live Load Deflection
U1051 (0.198")
45.7%
n\a
6
09-00-02
Max Defl.
0.248"
24.8%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
643 Ibs
10.5%
43.6%
Unspecified
B2 Hanger
2" x 1-3/4"
643 Ibs
55.9%
59.5%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 17 of 82
Boise Cascade Single 16" BCI® 4500s-1.8
1st Floor\Floor Joists1J1(i772) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: ___..,_..... __.__....File. name:. _. N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J1(i772)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (1-/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 18 of 82
&Bolse cascade --- Single 16" BCI® 4500s-1.8 P�S�EI
1st Floor\Floor JoistsW2(U45) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:... _..._.__... .._._.._.__._..._._._- . Filename:. . N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J2(i745)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
777
L �
15-04-14
131 132
Total Horizontal Product Length = 15-04-14
Reaction.Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
611/0
153/0
B2,2"
610/0
152/0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-01-12 15-04-14
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
.._--Pos:.Moment
100%--•-
.- .. 1;,.-_,-.07-09-08 ..
End Reaction
762 Ibs
70.5%
100%
1
15-04-14
End Shear
745 Ibs
37.7%
100%
1
00-04-00
Hole #1 Shear
354 Ibs
64.5%
100%
3
04-09-08
Hole #2 Shear
361 Ibs
65.8%
100%
4
10-10-08
Total Load Deflection
U915 (0.197")
39.3%
n\a
1
07-09-08
Live Load Deflection
L/1144 (0.158")
42.0%
n\a
6
07-09-08
Max Defl.
0.197"
19.7%
n\a
1
07-09-08
Span / Depth
11.3
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-09-08
8" L
12"
Circular
Horizontal
H02
10-10-08
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
764 Ibs
12.5%
51.8%
Unspecified
B2 Hanger
2" x 1-3/4"
762 Ibs
66.3%
70.5%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 19 of 82
(913oise cascade ..... = Single 16" BCI® 4500s-1.8 PAS �i
1st Flooffloor JoistSW2(1745) (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:... _... ___ _ _ ._.__ _ . _ _ _.. -__. _ __File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J2(i745)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (I") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on,3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask -
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAW, VERSA -RIM PLUS@ ,
Page 20 of 82
813olse Cascade — Single 16" BCI® 4500s-1.8 PASEA
1st FloorTloor JoistsU2(i755) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _.... __..._._._._...___ File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J2(i755)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1 15-04-14 132
Total Horizontal Product Length = 15-04-14
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B1,4" 534/0 133/0
B2, 2" 530 / 0 133 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-14
15-04-14
Top
30 7 n\a
2 FC1 Floor Material
Unf. Lin. (Ib/ft)
L
00-01-12
15-04-14
Top
40 10 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2456 ft-Ibs
60.1 %
100%
1
07-09-08
End Reaction
663 Ibs
61.3%
100%
1
15-04-14
End Shear
648 Ibs
32.8%
100%
1
00-04-00
Hole #1 Shear
308 Ibs
56.1 %
100%
3
04-09-08
Hole #2 Shear
314 Ibs
57.2%
100%
4
10-10-08
Total Load Deflection
U1052 (0.171 ")
34.2%
n\a
1
07-09-08
Live Load Deflection
U1315 (0.137')
36.5%
n\a
6
07-09-08
Max Defl.
0.171"
17.1%
n\a
1
07-09-08
Span / Depth
11.3
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height
Width
Shape
Orientation
H01
04-09-08 8"
L
12"
Circular
Horizontal'.
H02
10-10-08 8"
L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW) Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4" 667
Ibs
10.9%
45.2%
Unspecified
B2 Hanger
2" x 1-3/4" 663
Ibs
57.6%
61.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 21 of 82
Boise Cascade = Single 16" BCI® 4500s-1.8
1st Floor\Floor JoistsW2(i755) (Floor Joist)
BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _...-_..._ .. _. __... _..__ .. _ . _. File name- N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J2(i755)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (1-/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC@ analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a.
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 22 of 82
Boise Cascade — Single 16" BCIO4500s-1.8 SSE
1 st Flooffloor JoistslJ2(i759) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:. _ . _.....-_ ._ ------ . _._.-File. name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J2(i759)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-04-14
Total Horizontal Product Length=15-04-14
B2
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 4"
621 / 0 -
155 / 0
B2, 2"
610/0
152/0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-01-12 15-04-14
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2824 ft-Ibs
69.0%
100%
1
-07-09-08
End Reaction
762 Ibs
70.5%
100%
1
15-04-14
End Shear
745 Ibs
37.7%
100%
1
00-04-00
Hole #1 Shear
354 Ibs
64.5%
100%
3
04-09-08
Hole #2 Shear
361 Ibs
65.8%
100%
4
10-10-08
Total Load Deflection
U915 (0.197")
39.3%
n\a
1
07-09-08
Live Load Deflection
U1144 (0.158")
42.0%
n\a
6
07-09-08
Max Defl.
0.197"
19.7%
n\a
1
07-09-08
Span / Depth 11.3
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-09-08 8" L 12" Circular Horizontal
H02 10-10-08 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 4" x 1-3/4" 776 Ibs 12.7% 52.6% Unspecified
B2 Hanger 2" x 1-3/4" 762 Ibs 66.3% 70.5% ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 23 of 82
&Boise Cascade �- Single 16" BCI® 4500s-1.8 SDI
1st FloorTloor JoistsW(U59) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:. _.. _ File name:._ N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J2(i759)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (I") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 24 of 82
613olse Cascade RlffM
Single 16" BCI® 4500s-1.8
BC CALC® Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
131
1 st Floor\Floor Joists\J3(U37) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name:_.-_. N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J3(U37)
Specifier:
Designer:
Company:
15-01-06
Total Horizontal Product Length=15-01-06
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1,2"
566/0 142/0
B2, 2"
572 / 0 143 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
40 10 n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 15-01-06
Top
36 9 n\a
Controls Summary
Value % Allowable
Duration
Case
Location
Pos. Moment
2629 ft-Ibs 64.3%
100%
1
07-06-08
End Reaction
715 Ibs 66.2%
100%
1
15-01-06
End Shear
700 Ibs 35.4%
100%
1
00-02-00
Hole #1 Shear
338 Ibs 61.7%
100%
3
04-06-00
Hole #2 Shear
336 Ibs 61.3%
100%
4
10-07-00
Total Load Deflection
U989 (0.181 ") 36.4%
n\a
1
07-06-08
Live Load Deflection
U1236 (0.145") 38.8%
n\a
6
07-06-08
Max Defl.
0.181" 18.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00 8" L
12"
Circular
Horizontal
H02
10-07-00 8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW) Value
Support
Member
Material
B1 Hanger
2" x 1-3/4" 708 Ibs
42.5%
65.5%
IUS1.81/16
B2 Hanger
2" x 1-3/4" 715 Ibs
62.2%
66.2%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 25 of 82
•Boise cascade - - Single 16" BCI® 4500s-1.8
1st FloorlFloor JoistSW3(1737) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ __....._._._._ ._.__ . _.. ____.File name: N362326L&R.mmdl _
Address: Description: 1st Floor\Floor Joists\J3(i737)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0,75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 26 of 82
,Boise cascade Single 16" BCIO 4500s-1.8
1st Floor\Fioor Joists\J3(1742) (Floor Joist)
BC CALCO Member Report Dry 11 spantl No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:- _ File .name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
15-01-06
Total Horizontal Product Length = 15-01-06
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
605 / 0
151 / 0
B2, 2"
605 / 0
15110
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-Ibs.
67.9%-
100%-, --
1
07-06-08---- - •-- --•:
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 lbs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
L/936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
lUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 27 of 82
•Boise cascade - Single 16" BCI® 4500s-1.8
1st FloorlFloor JoistslJ3(1742) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:. _._ __ __._.__.__._,........._ File name:. N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation. .
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 28 of 82
613olse Cascade '-T Single 16" BCI® 4500s-1.8
1st FloorTloor Joists\J3(1742) - 01 (Floor Joist)
BC CALC® Member Report Dry 11 span No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _.._ _.. __. _.__-.____._.._ .-. File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
15-01-06
Total Horizontal Product Length = 15-01-06
62
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
15110
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90%' 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
-Pos. Moment
2777 ft-Ibs
- 67.9%
100%
1
— 07 06rO8. _..
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2)-Strong-Grip joist nails.
Page 29 of 82
zBolse cascade l= Single 16" BCI® 4500s-1.8 P
1st Floor\Floor JoistslJ3(1742) - 01 (Floor Joist)
BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _. _._ _ __..__ _ File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC@ analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of'suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 30 of 82
aBolse cascade - - Single 16" BCI® 4500s-1.8
BC CALC® Member Report
Build 7493
1st Flooffloor JoistsW(U42) - 02 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed
Job name: __.. _..... ___..__.._._...__.... _.File name:.. . N362326L&R.mmdl
February 11, 2021 12:28:44
Address: Description: 1 st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
61
15-01-06
Total Horizontal Product Length = 15-01-06
132
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref. Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L 00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
-.--2777ft-Ibs
100%.-- _-
1
07-06-08-
End Reaction
756 lbs
69.9%
100%
1
00-00-00
End Shear '
739 lbs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 lbs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 lbs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.16/0
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L 12"
Circular
Horizontal
H02
10-07-00
8" L 12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxV4
Value Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 lbs 45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 lbs 65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 31 of 82
•Boise Cascade OEM Single 16" BCI® 4500s-1.8
1st Flooffloor JoistslJ3(i742) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:. _ . _..___...._._.._ _.._ _ _ ....._.. _._._ _._.File name:,. _. .N362326L&R.mmdl.... ..... _ .,. .
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM@, VERSA -RIM PLUS@) ,
Page 32 of 82
613olse cascade -- Single 16" BCI® 4500s-1.8
BC CALC® Member Report
Build 7493
Job name: -
Address:
City, State, Zip -
Customer:
Code reports: ESR-1336
131
1st Flooffloor JoistslJ3(i742) - 03 (Floor Joist)
Dry 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
__._.__...._...... _._... _-File name:..___._ N362326L&R.mmdl _
Description: 1st Floor\Floor Joists\J3(i742)
Specifier:
Designer:
Company:
15-01-06
Total Horizontal Product Length = 15-01-06
62
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
605 / 0
151 / 0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
--Pos.- Moment
-2777 ft-Ibs- , _,
.,-._: 67.9%
100%----_
1 __.....07-06-08--......
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 33 of 82
Boise Cascade g� Single 16" BCI® 4500s-1.8
1st Flooffloor JoistSU3(i742) - 03 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __....... ------- name: _ N362326L&R.mmdl.
Address: Description: 1 st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
,Design meets User specified (L/480) Live load deflection criteria.
Design meets. arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC® analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC®, BC'FRAMERD , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI® ,
BOISE GLULAM-, BC FloorValue® ,
VERSA -LAM®, VERSA -RIM PLUS®,
Page 34 of 82
@Boise Cascade= Single 16" BCIO 4500s-1.8
1st FloorlFloor JoistSW3(i742) - 04 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:. _ __._ _. _ . _ _._.._ _ __.._._ ..File name:. _._ N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length = 15-01-06
Reaction Summary (Down / Uplift) (lbs)
Bearing Live Dead Snow Wind Roof Live
B1, 2" 605/0 151/0
B2, 2" 605 / 0 151 / 0
B2
Load Summary Live Dead ' Snow Wind Roof OCS
Live
Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125%
1 FC1 Floor Material Unf. Lin. (lb/ft) . L 00-00-00 15-01-06 Top 80 20 n\a
Controls Summary Value
--Pos. Moment - -
: -- =-2777 ft-Ibs -
End Reaction
756 lbs
End Shear
739 lbs
Hole #1 Shear
358 lbs
Hole #2 Shear
355 lbs
Total Load Deflection
U936 (0.191 ")
Live Load Deflection
U1170 (0.153")
Max Defl.
0.191"
Span / Depth
11.2
Hole Location
Valid
% Allowable
Duration
Case
Location
fr7.9% ._... . .:._....
100%
1.
69.9%
100%
1
00-00-00
37.4%
100%
1
00-02-00
65.2%
100%
3
04-06-00
64.7%
100%
4
10-07-00
38.5%
n\a
1
07-06-08
41.0%
n\a
6
07-06-08
19.1 %
n\a
1
07-06-08
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-06-00 8" L 12" Circular Horizontal
H02 10-07-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (Lxml Value Support Member Material
B1 Hanger 2" x 1-3/4" 756 lbs 45.4% 69.9% IUS1.81/16
B2 Hanger 2" x 1-3/4" 756 lbs 65.7% 69.9% ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 35 of 82
&Bolse Cas*cade - - Single 16" BCI® 4500s-1.8
1st FloorlFloor JoistslJ3(i742) - 04 (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job. name: _.......__..
_.. _.__.._....._....._._.......File name:. .. N362326L&R.mmdl .. _..
Address:
Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM), VERSA -RIM PLUS@ ,
Page 36 of 82
Boise Cascade `- Single 16" BCIO4500s-1.8 SASS
1st Floor\Floor JoistslJ3(i742) - 05 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __._._..__.._...._.._._.._ _. .___ __....__ -. __ .._ .___ .._ _ _ ..File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
1
15-01-06
B1 B2
Total Horizontal Product Length = 15-01-06
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B 1, 2" 605 / 0 151 / 0
B2, 2" 605 / 0 151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
-Pos. Moment <-:2777_f#-Ibs._-: ..
67.9%
100% -
,._1
07-0&O8.._.__.. _
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%,
100%
3
04-06-00
Hole #2 Shear
355 lbs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth 11.2
Hole Location Valid
Hole Summary
Center
Elevation
Ref. Height
Width
Shape Orientation
H01
04-0&00
8"
L 12"
Circular Horizontal
H02
10-07-00
8"
L 12"
Circular Horizontal
% Allow
% Allow
Bearing
Supports
Dim. (LxW)
Value
Support
Member
Material
B1
Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2
Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 1Od face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 1Od face nails, (4) 1 Od TF nails, (2) Strong -Grip joist nails.
Page 37 of 82
813olse cascade Mlff�- Single 16" 13C10 4500s-1.8 PAS�EI
1st Flooffloor JoistslJ3(1742) - 05 (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __ ._ _ __ _____._._...___...__File name:. _.. N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 38 of 82
Boise Cascade — Single 16" BCI® 4500s-1.8 �SS�
1st Flooffloor JoistslJ3(i742) - 06 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _.... __.. _ . _......___._____ . _ _ __ File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length = 15-01-06
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 2"
605/0
151 /0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos-. Moment
2777 ft-Ibs
- 67:9% -
100%
1 - ...._
07 96-08•o. —:-.- -..... -- — : • ..,<,
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth 11.2.
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-06-00 8" L 12" Circular Horizontal
H02 10-07-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Hanger 2" x 1-3/4" 756 Ibs 45:4% 69.9% IUS1.81/16
B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16
Cautions
Header for the hanger [US1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 39 of 82
Boise Cascade Single 16" BCI® 4500s-1.8
1st FloorTloor JoistsW(UQ) - 06 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job. name:
___:.__.___ ...Filename:_ . N362326L&R.mmdl. _
Address:
Description: 1 st Floor\Floor JoistsW(i742)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 40 of 82
@Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
1st FloorTloor JoistsU3(1742) - 07 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued &nailed February 11, 2021 12:28:44
.................. ... .-File name:,... N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J3(i742)
Specifier:
Designer:
Code reports: ESR-1336 Company:
15-01-06
B1 B2
Total Horizontal Product Length = 15-01-06
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment t-_..._..,
2777:#t-Ibs: ..,..
_-..67.9%..,.._._.
_.....:100°1a._..
:__-1
07-06-08-:....__,...__.:..
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
131 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 41 of 82
613olseCalcade Single 16" BCI® 4500s-1.8
1st Flooffloor Joists\J3(i742) - 07 (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __, _ _ .-,.,File name:. N362326L&R.mmdl _...... _..._
Address: Description: 1 st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 42 of 82
Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALC® Member Report
Build 7493
Job name: -
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
1st Flooffloor JoistslJ3(i742) - 08 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name:. _ .. N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J3(i742)
Specifier:
Designer:
Company:
15-01-06
Total Horizontal Product Length=15-01-06
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 2" .
60510
151 / 0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
.,Pos.-Moment - -
2777 ft-Ibs. _..,.._67:9%
100% . _. __..._._
1 -...,
wQ7-06-08.-. -___
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
1-2"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 43 of 82
-Boise Cascade= Single 16" BCI® 4500s-1.8 P,SEi
1st FloorlFloor JoistslJ3(i742) - 08 (Floor Joist)
BC CALC@ Member Report Dry 11 span I No cant. 124 OCS Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company: -
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC@ analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and' nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 44 of 82
ElffiN
•Boise cascade Single 16" BCI® 45005-1.8
1 st Flooffloor JoistSW4(i767) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ ___ File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J4(i767)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-11-05
Total Horizontal Product Length = 15-11-05
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind
Roof Live
B 1, 2"
568 / 0
142 / 0
B2, 2"
568 / 0
142 / 0
Load Summary
Live Dead
Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90%
115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-11-05
Top
71 18
n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos: Moment - -2757 ft-Ibs
67.4%
- 100%
1.
End Reaction
710 Ibs
65.7%
100%
1
00-00-00
End Shear
696 Ibs
35.2%
100%
1
00-02-00
Hole #1 Shear
448 Ibs
81.6%
100%
3
03-02-05
Hole #2 Shear
388 Ibs
70.8%
100%
4
11-11-05
Total Load Deflection
U907 (0.208")
39.7%
n\a
1
07-11-02
Live Load Deflection
U1134 (0.167")
42.3%
n\a
6
07-11-02
Max Defl.
0.208"
20.8%
n\a
1
07-11-02
Span / Depth 11.8
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 03-02-05 8" L 12" Circular Horizontal
H02 11-11-05 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Hanger 2" x 1-3/4" 710 Ibs 52.2% 65.7% IUS1:81/16
B2 Hanger 2" x 1-3/4" 710 Ibs 61.8% 65.7% ITS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 45 of 82
613olse Cascade Single 16" BCI® 4500s-1.8
1st FloorTloor JoistsW4(1767) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __ .. __..__,.,.__..__.. _.____File name: . N362326L&R.mmdl _
Address: Description: 1 st Fioor\Floor Joists\J4(i767)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum, Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability fora particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 46 of 82
2Boise cascade Single 16" BCI® 4500s-1.8
1st Flooffloor JoistSW5(i741) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ . _ _.__. _._ . . _ _ . _ . ___.__._.___ _ _. _. File name:_ . N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J5(i741)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
15-03-02
Total Horizontal Product Length = 15-03-02
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B1,2" 505/0 126/0
B2, 2"
505/0 126/0
B2
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-03-02
Top
66 17 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment —2343 ft-lb s
:57.3%
100% _
1 ......07-07
1.2.. ,,.. -_ .._ -...__ _--•._._.. --_-., ..
End Reaction
631 Ibs
58.4%
100%
1
00-00-00
End Shear
618 Ibs
31.3%
100%
1
00-02-00
Hole #1 Shear
292 Ibs
53.3%
100%
3
04-07-12
Hole 42 Shear
300 Ibs
54.6%
100%
4
10-08-12
Total Load Deflection
L/1102 (0.164")
32.7%
n\a
1
07-07-12
Live Load Deflection
L/1377 (0.131 ")
34.9%
n\a
6
07-07-12
Max Defl.
0.164"
16.4%
n\a
1
07-07-12
Span / Depth
11.3
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-07-12
8" L
12"
Circular
Horizontal
H02
10-08-12
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxM
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
631 Ibs
46.4%
58.4%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
631 Ibs
54.9%
58.4%
ITS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 47 of 82
*Boise Cascade Single 16" BCI® 4500s-1.8 I
1st Floor\Floor Joists\J5(i741) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44
Build 7493
Job_name:. File name:. .._ N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J5(i741)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 48 of 82
613olse cascade NEM Single 16" BCI® 4500s-1.8
1 St Floor\Floor JoistslJ6(i746) (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 1 24 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:- __ _...... _ ....... ____......______...File name:-- . N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J6(i746)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
03-01-11
Total Horizontal Product Length = 03-01-11
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1,2"
171/0 42/0
B2, 9-3/4"
376 / 0 93 / 0
Load Summary
Live Dead Snow Wind
Roof OCs
Live
Tag Description
Load Type Ref.
Start End
Loc. 100% 90% 115% 160%
125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 03-01-11
Top 4 1
n\a
2 J6(i785)
Cone. Pt. (Ibs) L
00-07-02 00-07-02
Top 26 6
n\a
3 J5(i741) ,._-_-:.
-.. . Cone. Pt. (Ibs)----- ---- L_--..
01-08-13- 01-08-13
Top 510-._127_... �_
,..-•-z�\a
Controls Summary
Value % Allowable Duration
Case Location
Pos. Moment
305 ft-Ibs 7.5%
100%
1 01-08-13
End Reaction
469 Ibs 31.8%
100%
1 03-01-11
End Shear
466 Ibs 23.6%
100%.
1 02-03-15
Total Load Deflection
L/999 (0.003") n\a
n\a
1 .01-08-13
Live Load Deflection
U999 (0.003") n\a
n\a
2 01-08-13
Max Defl.
0.003" n\a
n\a
1 01-08-13
Span / Depth
1.7
% Allow % Allow
Bearing Supports
Dim. (LxW) Value
Support Member
Material
B1 Hanger
2" x 1-3/4" 213 Ibs
12.8% 19.7%
IUS1.81/16
B2 Wall/Plate
9-3/4" x 1-3/4" .469 Ibs
3.1% 31.8%
Unspecified
Cautions
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 49 of 82
•Boise cascade Single 16" BCI®4500s-1.8 S
1st Floor\Floor JoistSU6(i771) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:_ __ ......- ... __ __...___ __.. __ File name:. . N362326L&R-mmdl
Address: Description: 1st Floor\Floor Joists\J6(i771)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
03-04-03
Total Horizontal Product Length = 03-04-03
B2
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 2"
310/0
78/0
B2, 2"
269 / 0
67 / 0
Load Summary
Live Dead_ Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc. 100% 90% 115% 160% 125%
1 J4(i767)
Conc. Pt. (Ibs) L
01-06-13 01-06-13
Top 579 145 n\a
Controls Summary
Value
% Allowable
Duration
Case Location
-Pos.-Moment : --•565-ft-Ibs:_..:.....-
- 13.8%,
.1: Q1-06 12 :::- ---- ..n, _.__;._:. _=_.------
End Reaction
387 Ibs
35.8%
100%
1 00-00-00
End Shear
387 Ibs
19.6%
100%
1 00-02-00
Total Load Deflection
U999 (0.007")
n\a
n\a
1 01-06-12
Live Load Deflection
U999 (0.005")
n\a
n\a
2 01-06-12
Max Defl.
0.007"
n\a
n\a
1 01-06-12
Span / Depth
2.4
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
387 Ibs
28.5%
35.8%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
337 Ibs
20.2%
31.2%
IUS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2).Strong-Grip joist nails.
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. .
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject -to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 50 of 82
SBolse Cascade Single 16" BCI® 4500s-1.8
1st FloorTloor JoistslJ6(i785) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
-- Job name: _ _
_.,__._...- _.Filename: .. N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J6(i785)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
9
B1
03-08-03
Total Horizontal Product Length = 03-08-03
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow
Wind
Roof Live
B1,4" 25/0 6/0
B2, 2" 2710 7/0
Load Summary
Live Dead
-Snow Wind Roof OCs
Live
Tag Description Load Type Ref. Start End
Loc. 100% 90%
115% 160% 125%
1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-04-00 03-08-00
Top 15 4
n\a
2 FC1 Floor Material Conc. Pt. (Ibs) L 00-03-00 00-03-00
Top 1
h\a
... =Controls Summary .._yaluL -_.. %Allowable- _-= 13uration,_,..,.,,-----'Case._-. -Location.._
Pos. Moment 26 ft-Ibs 0.6% 100%"
1 01-11-01
End Reaction 33 Ibs 3.1 % 100%
1 03-08-03
End Shear 30 Ibs 1.5% 100%
1 00-04-00
Total Load Deflection U999 (0") n\a n\a
1 01-11-01
Live Load Deflection U999 (0") n\a n\a
2 01-11-01
Max Defl. 0" n\a n\a
1 01-11-01
Span / Depth 2.5
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member
Material
B1 Wall/Plate 4" x 1-3/4" 31 Ibs 0.5% 2.1 %
Unspecified
B2 Hanger 2" x 1-3/4" 33 Ibs 2.4% 3.1 %
IUS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails.
Disclosure
Use of the Boise Cascade Software is
Notes
subject to the terms of the End User
Design meets User specified (L/360) Total load deflection criteria.
License Agreement (EULA).
Design meets User specified (L/480) Live load deflection criteria.
Completeness and accuracy of input
must be reviewed and verified by a
Design meets arbitrary (I") Maximum Total load deflection criteria.
qualified engineer or other appropriate
Design meets arbitrary (0.75") Maximum live load deflection criteria.
expert to assure its adequacy, prior to
Calculations assume member is fully braced.
anyone relying on such output as
Hanger Manufacturer: Simpson Strong -Tie, Inc.
evidence of suitability for a particular
application. The output here is based on
BC CALCO analysis is based on IBC 2009.
building code -accepted design
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
properties and analysis methods.
Design based on Dry Service Condition.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS—
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAME), VERSA -RIM PLUS@ ,
Page 51 of 82
Boise cascade Single 16" BCI® 6000s-1.8
1st FloorTloor JoistSW7(i774) (Floor Joist)
BC CALL® Member Report Dry 11 span No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ _ ._ _..... ...... _. _._.__.__. File name: N362326L&B.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i774)
City, State, Zip_: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
2__._ 3....
.v
2 3
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind
Roof Live
B1,2"
677/0
169/0
B2, 4"
692 / 0
173 / 0
Load Summary
Live Dead
Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90%
115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 19-11-00
Top
40 10
n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 03-09-00
Top
26 6
n\a
_.,,.3...,._FC1 Floor --
_-03-09-00 20-01-00----Top-_-.29._M_..7.:_
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4180ft-Ibs
76.1%
100%
1
09-11-06
End Reaction
846 Ibs
66.7%
100%
1
00-00-00
End Shear
844 Ibs
38.8%
100%
1
19-09-00
Hole #1 Shear
471 Ibs
77.9%
100%
3
05-00-00
Hole #2 Shear
172 Ibs
28.5%
100%
4
10-00-04
Hole #3 Shear
474 Ibs
78.4%
100%
6
14-11-14
Total Load Deflection
U608 (0.389")
59.2%
n\a
1
09-11-06
Live Load Deflection
U760 (0.311")
63.2%
n\a
8
09-11-06
Max Defl.
0.389"
38.9%
n\a
1
09-11-06
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
846 Ibs
73.6%
66.7%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
865 Ibs
10.7%
55.8%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 52 of 82
Boise cascade Single 16" BCI® 6000s-1.8 ��SI
1st FloorTloor JoistslJ7(1774) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: ___._ ...
_ ... _ _ File name: _.. N362326L&R_mmdl
Address:
Description: 1st Floor\Floor Joists\J7(i774)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC(D, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 53 of 82
Boise cascade -- Single 16" BCI® 6000s-1.8
1st Floor\Floor JoistSW7(i775) (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ _....... _ .
._...__.-......_.....___.w..--.... _-.File-name: - ,._ .N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
B1
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
797 / 0
199 / 0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment :....,,: ,.. ,._ :- .4854:ft-Ibs._...
_- ---88:39/0-.......
—.....,.:100%il
.__..
-1
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS.2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger-ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 54 of 82
Boise Cascade= Single 16" BCI® 6000s-1.8
1st Floor\Floor Joists\J7(i775) (Floor Joist)
BC CALCO Member Report Dry 11 span No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ _ .___.._.._..__..._... _ __ _..__ ._._...File name:. _ _ N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria: '
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 55 of 82
Boise Cascade— Single 16" BCIO 6000s-1.8
1st FloorTloor JoistslJ7(i775) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job. name: _ - . ___-File-name:_..:. N362326L&R.mmdl.
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
1.
r 1 nm, E 2,' 3` s
B1
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2" .797/0
199/0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%"
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos; Moment
-4854•ft-Ibs•.:- .,,.__:
..,88:3%
..- -
-100% _-,.....r.
1 .n._._,4941<08._......
_ ...
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 lbs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1 %
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation' Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular.
Horizontal
H02
10-00-04
8". L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
%" Allow
Bearing Supports
Dim. (LxM
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 56 of 82
Boise cascade - Single 16" BCI® 6000s-1.8
1st Flooffloor JoistsU7(1775) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: _ ___ N362326L&R.mmdl .
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 57 of 82
f Boise cascade Single 16" BCI® 6000s-1.8 B
1st Flooffloor Joists\J7(1775) - 02 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job. name:. _ .._ .File -name: N362326L&R.mmdl.
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration '
Case
Location
_Pos:•Moment...: _.:,..:.
,: 4854ft-Ibs
88:3°/a
.....-..._:.._100%
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 lbs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 58 of 82
Boise cascade Min—= Single 16" BCI® 6000s-1.8
1st Flooffloor Joists\J7(U75) - 02 (Floor Joist)
F.:t' -.. 3�'.....
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job. name: _. _... _ .. _._.._._._ _. _.__ _..._.__.....__._...___ . _File name:_ _. N362326L&R.mmdl _. .......
Address: Description: 1 st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4' thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 59 of 82
0
Boise cascade MEM Single 16" BCIO 6000s-1.8
BC CALL® Member Report
Build 7493
Job name: _
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
1st Flooffloor JoistsW(U75) - 03 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
__-File name: N362326L&R_mmdl_..
Description: 1 st Floor\Floor Joists\J7(i775)
Specifier:
Designer:
Company:
20-01-00
Total Horizontal Product Length = 20-01-00
62
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 2"
797 / 0
199 / 0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%"
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment _--q.8,5.1ft-Ibs-=-.
88.3%
100%_.,..,
1
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth 14.8
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 05-00-00 8" L 12" Circular Horizontal
H02
H03
10-00-04 8" L 12"
14-11-14 8" L 12"
Circular Horizontal
Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16
B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 60 of 82
Bose cascade MIM9-- Single 16" BCI® 6000s-1.8
1st FloorTloor JoistsW(U75) - 03 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
Address: Description: 1 st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (1-/360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 61 of 82
} Boise cascade Single 16" BCI® 6000s-1.8 PSD.
1st Flooffloor JoistSU7(i776) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ ___._.._ File name: . N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
20-02-08
Total Horizontal Product Length = 20-02-08
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
797 / 0
199 / 0
B2, 5-1/2"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin.
(lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
.-Po§:-Moment
4854 ft-Ibs- _- _--.::88.3%
- -. . _
100%
1 : ,
..09 '•1-08 -__ _,,_,.--- ... _..__.,__>.__.__. __._�:..—:.,,
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02'
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
Bearing Supports
Dim. (Lxwl
Value
% Allow
Support
% Allow
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
5-1/2" x 2-5/16"
996 Ibs
18.4%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 62 of 82
6Boise Cascade _ Single 16" BCI® 6000s-1.8
1st FloorTloor JoistslJ7(i776) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: __ _._. __ __ .._ _ ..._ . _ _..___.____ _ __.__.File.name:. _ ._ N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4"thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValueO ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 63 of 82
Boise cascade Single 16" BCI® 6000s-1.8 pBSIEI
1st FloorTloor JoistSU7(i776) - 01 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed. February 11, 2021 12:28:44
Build 7493
Job name: _._..._._.....__ ..._ _ File. name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
20-02-08
Total Horizontal Product Length = 20-02-U8
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 5-1/2"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment _ -4854 ft-Ibs •
.88.3% ..__........:..
.100% _ _.;.....
_.,1•
. '09-11-08 ...... _, ....�,.�._: _.__.. _ .._
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1 %
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular.
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
5-1/2" x 2-5116"
996 Ibs
18.4%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 64 of 82
6Boise cascade fflgM Single 16" BCI® 6000s-1.8 PAS�EI
1st Flooffloor JoistslJ7(1776) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job -name: _ _ _ ..___..._. __ _ .. File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 65 of 82
Boise cascade- Single 16" BCI® 6000s-1.8 S
1st Floor\Floor JoistsW(U78) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job. name: __ . _ __...._ __ _ ...File name:... N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i778)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
0
=e
20-02-08
Total Horizontal Product Length = 20-02-08
B2
Reaction Summary (Down / Uplift) (Ibs)
_Bearing
Live
Dead
Snow
Wind
Roof Live
B 1, 2"
797 / 0
199 / 0
B2, 5-1/2"
797 / 0
199 / 0
Load Summary
Live Dead
Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90%
115% 160% 125%
1 FC1 Floor Material
Unf. Lin.
(lb/ft) L
00-00-00 19-11-00
Top
80 20
n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos, Moment
4854 ft-•Ibs
-88.3%
100%
1
094-1_08..._.._
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
Bearing Supports
Dim. (Lx1N1
Value
% Allow
Support
% Allow
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
5-1/2" x 2-5/16"
996 Ibs
18.4%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 66 of 82
Boise cascade Single 16" BCI® 6000s-1.8
1st FloorTloor JoistskR(i778) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 1 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ __....._._._..._
.... _..._..._..__._____._......_ _ File. name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J7(i778)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAW, VERSA -RIM PLUS@ ,
Page 67 of 82
' Boise cascade =�g Single 16" BCI® 6000s-1.8 SSED
1st Flooffloor JoistsW7(i781) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44
Build 7493
Job -name:. - __.. __.__. __._ . _ ___ File name: _ _ N362326L&R.mmdl..
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
Description: 1 st Floor\Floor Joists\J7(i781)
Specifier:
Designer:
Company:
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
797 / 0
19910
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment _.......:
-4854.ft-Ibs
88:3%
100%,
1
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1 %
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 lbs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 68 of 82
aBolse cascade Single 16" BCI® 6000s-1.8
1st FloorTloor JoistslJ7(1781) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ _ _ _ ___..._ _ . _ _.._______. __...._ .File name:-.--. N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i781)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 69 of 82
0 Boise Cascade= Single 16" BCI® 6000s-1.8
1 st FloorTloor JoistsW(U83) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _.__...._ . _ .. _.. _.._.-._____...... _. File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i783)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
20-00-08
Total Horizontal Product Length = 20-00-08
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
607/0
152/0
B2, 3-1/2"
607 / 0
152 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
61 15 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
-. -Pos. Moment . _....- 3697.ft-lbs..._......_.__.,67.3%
100% ...,.
:,.._... 1._.. _G9-11_08 . .......
End Reaction
758 Ibs
59.8%
100%
1
00-00-00
End Shear
746 Ibs
34.3%
100%
1
00-02-00
Hole #1 Shear
415 Ibs
68.6%
100%
3
05-00-00
Hole #2 Shear
153 Ibs
25.3%
100%
4
10-00-04
Hole #3 Shear
419 Ibs
69.3%
100%
6
14-11-14
Total Load Deflection
U687 (0.344")
52.4%
n\a
1
09-11-08
Live Load Deflection
U858 (0.275")
55.9%
n\a
8
09-11-08
Max Defl.
0.344"
34.4%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxM
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
758 Ibs
65.9%
59.8%
ITS2.37/16
B2 Wall/Plate
3-1/2" x 2-5/16"
758 Ibs
10.7%
48.9%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 70 of 82
Boise cascade gigig Single 16" BCI® 6000s-1.8
BC CALCO Member Report
Build 7493
Job. name: _
Address:
City, State, Zip:
Customer:
1st Flooffloor JoistslJ7(i783) (Floor Joist)
Dry 11 span I No cant. 124 OCS .Repetitive I Glued & nailed February 11, 2021 12:28:44
_File name:. . N362326L&R.mmdl _
Description: 1st Floor\Floor Joists\J7(i783)
Specifier:
Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 71 of 82
0121olse
Cascade MSingle 16" BCI® 6000s-1.8
1st Floor\Floor Joists\J8(i751) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job.name: _ . - _ . ___.._-.....___._-__._..__.__...--.__File-name: N362326L&R-mmdl
Address: Description: 1st Floor\Floor Joists\J8(i751)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
19-01-00
Total Horizontal Product Length=19-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 3-1/2"
61110
153 / 0
B2, 2"
614/0
154/0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref. Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (Ib/ft) L 00-02-00 19-01-00
Top
65 16 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
3559ft-Ibs
64.8%...._
100%
1
09-0649-...--..,•.-._.,
End Reaction
768 Ibs
60.5%
100%
1
19-01-00
End Shear
754 Ibs
34.7%
100%
1
00-03-08
Hole #1 Shear
209 Ibs
34.6%
100%
3
08-05-11
Total Load Deflection
U741 (0.304")
48.6%
n\a
1
09-06-15
Live Load Deflection
U926 (0.243")
51.8%
n\a
4
09-06-15
Max Defl.
0.304"
30.4%
n\a
1
09-06-15
Span / Depth
14.1
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L 12"
Circular
Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 3-1/2" x 2-5/16" 764 Ibs 10.8% 49.3% Unspecified
B2 Hanger 2" x 2-5/16" 768 Ibs 66.8% 60.5% ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 72 of 82
f
613olse Cascade Single 16" BCI® 6000s-1.8 SS
1 st FloorTloor JoistSXJ9(i736) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _.._ ....._.._.... ___ _ _.._.._ . _..____.__....___.__File.name:. N362326L&R.mmdl.
Address: Description: 1st Floor\Floor Joists\J9(i736)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
61
0
19-01-00
Total Horizontal Product Length = 19-01-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1,4"
787/0 196/0
B2, 2"
748 / 0 187 / 0
Load Summary
Live Dead Snow Wind Roof
OCS
Live
Tag Description
Load Type Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
40 10
n\a
_2 _..FC_1 F)oor.,Matedia.l.
_ _...._ . _ ..Unf... Lin. (lb/ft) L.
, ._t10-p4_Of.), .0.3-
Top
15.._ .._.__4__..__._,� _.. ,�...__., ,_..._..._.___--
_.. n\a
3 FC1 Floor Material
Unf. Lin. (lb/ft) L
03-09-01 19-01-00
Top
37 9
n\a
4 J6(i746)
Conc. Pt. (Ibs) L
03-09-01 03-09-01
Top
166 41
n\a
Controls Summary
Value % Allowable Duration
Case
Location
Pos. Moment
4472 ft-Ibs 81.4%
100%
1
09-03-08
End Reaction
935 Ibs 73.7%
100%
1
19-01-00
End Shear
975 lbs 44.8%
100%
1
00-04-00
Hole #1 Shear
242 Ibs 40.1 %
100%
3
08-05-11
Hole #2 Shear
542 Ibs 89.7%
100%
4
14-06-11
Total Load Deflection
U587 (0.382") 61.3%
n\a
1
09-06-05
Live Load Deflection
U734 (0.306") 65.4%
n\a
6
09-06-05
Max Defl.
0.382" 38.2%
n\a
1
09-06-05
Span / Depth
14.0
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height Width
Shape
Orientation
H01
08-05-11 8" L
12"
Circular
Horizontal
H02
14-06-11 8" L
12"
Circular
Horizontal
% Allow % Allow
Bearing Supports
Dim. (LxW) Value
Support Member
Material
B1 Wall/Plate
4" x 2-5/16" 983 Ibs
12.1% 63.4%
Unspecified
B2 Hanger
2" x 2-5/16" 935 Ibs
81.3% 73.7%
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 73 of 82
Boise Ca - - Single 16" BCI® 6000s-1.8
1st Flooffloor JoistsW9(i736) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job.name _..___..._ __.._ _.._.File. name:....... N362326L&R.mmdl _. ._.... .
Address: Description: 1st Floor\Floor Joists\J9(i736)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUSO ,
Page 74 of 82
013olse cascade - Single 16" BCI® 6000s-1.8 I SSI
1st FloorTloor JoistskA(U49) (Floor Joist)'
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job -name:. _ -... _.__._,........_ _ _______._._.__._.._ _ .File name:.._.. N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
►—e
B1
19-01-00
Total Horizontal Product Length = 19-01-00
62
Reaction Summary.(Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 5-1/2"
762 / 0'
190 / 0
B2, 2"
752 / 0
188 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos:.Moment
4318 ft Ibs-:.....-78.6%. =
100%
End Reaction
940lbs
74.1%
100%
1
19-01-00
End Shear
923 Ibs
42.4%
100%
1
00-05-08
Hole #1 Shear
262 Ibs
43.4%
100%
3
08-05-11
Hole #2 Shear
529 Ibs
87.5%
100%
4
14-06-11
Total Load Deflection
U615 (0.363")
58.5%
n\a
1
09-08-04
Live Load Deflection
U769 (0.29")
62.4%
n\a
6
09-08-04
Max Defl.
0.363"
36.3%
n\a
1
09-08-04
Span / Depth
13.9
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L
12"
Circular
Horizontal
H02
14-06-11
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
5-1/2" x 2-5/16"
952 Ibs
17.6%
61.4%
Unspecified
B2 Hanger
2" x 2-5/16"
940 Ibs
81.7%
74.1 %
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 75 of 82
Boise cascade -- Single 16" BCI® 6000s-1.8
1st Floor\Floor Joists\J9(i749) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
.Job name:_ . ... __.._.. _ _.... _ _... ._ _ _ -File name:_ ._ N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 76 of 82
8Boise Cascade � Single 16" BCIO 6000s-1.8
1st FloorTloor JoistSW9(i749) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: - _ __._._.�_._..._._.___ Eile name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
imi-oo
Total Horizontal Product Length = 19-01-00
132
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 5-1/2"
762 / 0
190 / 0
B2, 2"
752 / 0
188 / 0
Load -Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment-_._.. -_
. - 4318 ft-Ibs
....78:6%
. .......
100%
1
09708-04•-•=7._,.., ._ .. ,,: _ .:.... _. -- -.._.. _ .........._.
End`Reaction
940lbs
74.1%
100%
1
19-01-00
End Shear
923 Ibs
42.4%
100%
1
00-05-08
Hole #1 Shear
262 Ibs
43.4%
100%
3
08-05-11
Hole #2 Shear
529 Ibs
87.5%
100%
4
14-06-11
Total Load Deflection
U615 (0.363")
58.5%
n\a
1
09-08-04
Live Load Deflection
U769 (0.29")
62.4%
n\a
6
09-08-04
Max Defl.
0.363"
36.3%
n\a
1
09-08-04
Span / Depth
13.9
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L
12"
Circular
Horizontal
H02
14-06-11
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
5-1/2" x 2-5/16"
952 Ibs
17.6%
61.4%
Unspecified
B2 Hanger
2" x 2-5/16"
940 Ibs
81.7%
74.1 %
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 77 of 82
Boise cascade - Single 16" BCI® 6000s-1.8
1st FloorlFloor JoistslJ9(i749) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44
Build 7493
_.Job name: __....____....__ _.... File name: N362326L&R.mmdl ._ . __ ...._
Address: Description: 1st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 78 of 82
Boise cascade Single 16" BCIO 6000s-1.8 PASSES
1st FloorlFloor Joists\J9(i749) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: _ __ _ _ ..._ ._ . ___.__...File..name:. _ N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
19-01-00
Total Horizontal Product Length = 19-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 5-1/2"
762 / 0
190 / 0
B2, 2"
752 / 0
188 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
---4318-ft.,lbs.........
78.6%
- 100%.... .......m
_I
,.09-08-04 - _..__.-�...-__ ..:......
End Reaction
940 Ibs
74.1%
100%
1
19-01-00
End Shear
923 Ibs
42.4%
100%
1
00-05-08
Hole #1 Shear
262 Ibs
43.4%
100%
3
08-05-11
Hole #2 Shear
529 Ibs
87.5%
100%
4
14-06-11
Total Load Deflection
U615 (0.363")
58.5%
n\a
1
09-08-04
Live Load Deflection
U769 (0.29")
62.4%
n\a
6
09-08-04
Max Defl.
0.363"
36.3%
n\a
1
09-08-04
Span / Depth 13.9
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 08-05-11 8" L 12" Circular Horizontal
H02 14-06-11 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 5 1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified
B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 79 of 82
*Boise Cascade Single 16" BCI® 6000s-1.8
1st FloorTloor JoistsU9(i749) - 02 (Floor Joist)
BC CALC@ Member Report Dry 1.1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job -name: _.__. _._ ..__....__..._....__.._. .. File name:.. _ _ ._N362326L&R.mmdl _._ .................__ .. .....
Address: Description: 1 st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1.") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC® analysis is based -on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 80 of 82
aBoise Cascade
BC CALCO Member Report
Build 7493
Job -name: ...
Address:
City, State, Zip:
Customer:
Double 1-3/4" x 16" VERSA -LAM® 2.0 3100 SP
i
1st Floor\Flush BeamslBM1(i744) (Flush Beam)
Dry 11 span I No cant. February 11, 2021 12:28:44
name: _ _ _.N362326L&R.mmdl
Description: 1st Floor\Flush Beams\BM1(i744)
Specifier:
Designer:
Code reports: ESR-1040 Company:
2b-oi-o2
131 132
Total Horizontal Product Length = 20-01-02
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live Dead
Snow
Wind Roof Live
B1, 7"
3879 / 0 . 1136 / 0
B2, 2"
3187 / 0 957 / 0
Load Summary
Live Dead Snow Wind Roof
Tributary
Live
Tag Description
Load Type Ref.
Start End
Loc.
100% 90% 115% 160% 125%
0 . Self -Weight
= - Unf. Lin. (Ib/ft).- L
00-00-00 20-01-02
Top
_ 16 ,-
00-00-00 _
1 Smoothed Load
Unf. Lin. (lb/ft) L
00-00-00 17-03-11
Top
320 80
n\a
2 FC1 Floor Material
U.nf. Lin. (lb/ft) L
03-09-01 20-01-02
Top
39 10
n\a
3 J6(i771)
Cone. Pt. (Ibs) L
03-09-15 03-09-15
Top
271 68
n\a
4 J3(i737)
Cone. Pt. (Ibs) L
18-03-11 18-03-11
Top
575 144
n\a
Controls Summary
Value % Allowable Duration
Case
Location
Pos. Moment
21796 ft-Ibs 58.3%
100%
1
10-03-11
End Shear
4199 Ibs 39.5%
100%
1
01-11-00
Total Load Deflection
U377 (0.62") 63.7%
n\a
1
10-03-10
Live Load Deflection
U488 (0.479") 73.7%
n\a
2
10-03-10
Max Defl.
0.62" 62.0%
n\a
1
10-03-10
Span / Depth
14.6
% Allow % Allow
Bearing Supports
Dim. (Lx" Value
Support Member
Material
B1 Wall/Plate
7" x 3-1/2" 5015 Ibs
23.4% 27.3%
Unspecified
B2 Hanger
2" x 3-1/2" 4144 Ibs
n\a 78.9%
Hanger
Cautions
Hanger model Hanger was not found. Hanger has not been analyzed for adequate capacity.
Notes
Design meets Code minimum (L/240) Total load deflection criteria.
Design meets Code minimum (L/360) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Unassigned
BC CALCO analysis is based on IBC 2009.
Design based on Dry Service Condition.
Page 81 of 82
6MMEE
Boise Cascade Double 1-3/4" X 16" VERSA -LAM® 2.0 3100 SP IIaSSIrD
1st Floofflush BeamsIBM1(1744) (Flush Beam)
BC CALCO Member Report Dry 11 span I No cant. February 11, 2021 12:28:44
Build 7493
Job name:.. _._......_File.name:._. N362326L&R.mmdl _. .
Address: Description: 1st Floor\Flush Beams\BM1(i744)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1040 Company:
Connection Diagram: Full Length of Member
r-• b If r•— d —*-i
a
•
c
f • •
a
a minimum = 2" c = 6"
b minimum = 3" d = 24"
Calculated Side Load = 385.0 Ib/ft
Connectors are: 16d Common Nails
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 82 of 82
Boise Cascade
Al
,D
-Hand Driven Nailin
When using multiple ply 1 3/4' VERSA -LAM® beams to create a wider member, the connection of the
plies is as critical as determining the beam size. When side loaded beams are not connected properly,
the inside plies do not support their share of the load and thus the load carrying capacity of the full
member decreases significantly..
BC CALC® reports show a connection'detail.for connecting multiple ply 1'3/4' VERSA -LAM® beams. BC
CALC® reports will either show the member having no side loads or the calculated side load. When the
nails shown on the connection detail are not readily available on the job site, the following table may be
used to substitute power driven nails or hand driven nails.
Example: Connection detail on the BC CALC® report shows 16d sinker nails at .12". o.c. As an
alternative, 3" x 0.131" power driven nails can be used at 8" o.c. or 16d common nails can be used at
14" o.c.
As Shown on BC
Power Driven Nails
Hand Driven Nails
CALe Report
0)CO
.0
00
_M
r
rr cD
CD
X CO
°-
T
o
V
Cr
0
T N
0
` T
E 6
T�
Y
o
O T
m o
Nail
CO
X
0
X 0
X 0
X
CO X
-0-
-0 X
U
�
x
� x
m
� x
�
a�
a
CD
T
O
CO
CO
CO
m CO
T CO
CO
24"
24"
20"
16"
12".
24"
20"
16"
16d Common
12"
12"
10"
8"
6"
12"
10"
8"
3 1/2" x 0.162"
6"
6"
N/A
N/A
N/A
6"
N/A
N/A
2419
2411
24„
18"
16"
24„
24„
20"
16d Sinker
12
14
12
8
8
14
12
10
3 1/4 " x 0.148"
6"
6"
6"
N/A
N/A
6"
6"
N/A
24"
24"
24"
22"
18"
24"
24"
24"
16d. Box
'12"
16"
12"
10"
8"
16"
12"
12"
3 1/2" x 0.1351, .
_ 6"
8"
6"
N/A
N/A
8"
6"
6"
w:=
Alternate On -Center Spacing
Notes:
• For multiple ply 1 3/4' VERSA -LAM® beams with only top load, beam may be fastened at 24" o.c.
for all nails shown above (top mounted hangers shall be analyzed as side loads).
• Use end distance, edge distance, row spacing and number of rows shown on connection detail
found on BC CALC® Report.
• Alternate nailing not available for all nail types.
• Contact professional of record for connection design of side -loaded point loads beyond what is
shown in Boise Cascade Tech Note LVL-4 and LVL-10.
• Table is not applicable for 1 1/2' wide VERSA -LAM° beams.
Tech Note LVL-17 Page 1 of 1 11/12
41
- Boise Cascade®
ENGINEERED WOOD PRODUCTS
Tem
)f Masonry Block
on BCI° / AJS° Joist Floors
In areas where concrete masonry block is -.used in the construction of walls, limited job site
space may require the short-term storage of blocks on a BCI®/ AJS° floor. Because of the
significate weight, caution should be used in the block stack placement location and size. The
following guidelines shall be followed.
General.Notes
• Limits based upon a normal weight concrete masonry unit (8x8x16) weight of 37 pounds
(Reinforced Masonry Engineering Handbook, Masonry Institute of America).
• No more than one masonry block stack shall be placed on any joist.
• Limits shown are valid for all series and depths if the specific floor joists are properly sized
for the occupancy design loads.
• BCI® / AJS® joist shall not be spaced greater than 24" on -center. Floor sheathing shall be
designed by the structure's design professional of record and installed properly prior to
block storage.
The floor shall not be loaded"with concrete masonry block for a period longer than three
days.
• Avoid allowing the joists or floor sheathing to get wet before or during loading. Wet wood
may take a permanent set under load in the deflected shape.
No Shoring Required
8" tall masonry block stack
maximum 48" x 48" footprint,
maximum 2 courses tall
BCl/AJS Joists,
max 24" o.c.s.
Temporary Storage of Masonry Block Page 1 of 2 1`05/2019
Boise Cascade®
ENGINEERED WOOD PRODUCTS -
Masonry block stack may be placed anywhere along span length with the exception of no
closer than 4'-0" from any intermediate bearing.
• . Concrete masonry units (8x8x16) shall be stacked no higher than two courses tall by 48
inches wide.
Deviation of preceding provisions voids BCI® / AJS® product warranty.
Shoring Required
CSI,I/HJA JOISiS,
max 24" o.c.s.
:)nry block stack
18" x 48" footprint,
3 courses tall
3sign by others
I.)
uu0jy11 Uy others
• The design of the shoring members and transfer of load from the shoring is the
responsibility of the design professional of record. Inadequate shoring design voids
the BCI® / AJS° product warranty.
• Concrete masonry units (8x8x16) shall be stacked no higher than six courses tall by 48
inches wide.
Temporary Storage of Masonry Block
Page 2 of 2
ro5/2o1 g
19
Boise Cascade
Engineered Wood Products
Temporary Storage of
BCI°/AJ
Technical
sum Wallboard on
Joists
The practice of stacking gypsum wallboard on wood floors prior to the installation is common
and necessary to the successful completion of any residential project. Because of the
enormous weight, caution should be used in the placement location and size. The following
guidelines.are recommended by Boise Cascade EWP Engineering.
• Gypsum wallboard shall be stacked no higher than 11 inches (22 sheet limit for 1/2"
gypsum board, 17 sheet limit for 5/8" gypsum board).
• Placement of wallboard stacks in the middle of a room is not allowed. Loading in the
middle of the joist span induces greater deflections compared to loads placed near the
joist's supports.
• No more than one gypsum stack shall be placed on a single joist.
• Wallboard stacks shall be oriented with their long dimension perpendicular to the joist
layout direction. In this orientation, more joists are supporting the wallboard.
• The floor shall not be loaded with wallboard for a period longer than 4 weeks.
• Avoid allowing the joists or floor sheathing to get wet while loaded. Wet wood will take a
permanent set, which may be unsightly.
Tech Note U-7 Page 1 of 1 r4i10
ITS/MIT/HIT -
._............._.._...._...._._.-..._.._.................. ._......._.....
- - .--Engineered- Wood Product Top -Flange -Hangers - --- - -
This product Is preferable to similar connectors because
W of (a) easier installation, (b) higher loads, (W lower Installed
73 cost, or combination of these femfures.
Simpson Strong -Tie offers a dedicated range of top -flange I -joist
hangers that meet the unique needs of 1-joists while offering superior
performance and ease of installation..
ITS
The Innovative ITS sets the standard for engineered wood top -
flange hangers. The ITS Installs faster and uses fewer nails than
any other EWP top -flange hanger. The Strong -Grip'" seat and
Funnel Flange' features allow standard joist Installation without
requiring joist nails, resulting In the lowest installed cost. The
Strong -Grip seat firmly secures l jolsts with flange thicknesses
from 1 gib" to 1 1/s".
MIT/HIT — Positive -Angle Nailing (PAN)
PAN is specifically designed for I jolsts when used with the MIT or
r. Wit
h PAN, the nail hole material is not removed, butis formed
to channel and confine the path of the nail at approximately 450.
PAN minimizes splitting of the flanges while permitting time -saving
nailing from a. better angle. See top flange tables on pp. 173-182.
Refer to joist manufacturees literature or appropriate Simpson. .
Strong -Tie Connector Selection Guide for actual joist sizes.
Material: ITS — 18 gauge; MIT, HIT — 16 gauge
Finish: Galvanized
Installation:
• Use all specified fasteners. Verify that the header
can take the required fasteners specified In the. table.
• See pp.95-96 for more installation Information.
• iTS — no joist nailing required for standard 1-Joist installation
without web stiffeners. When supporting 1-joists with web
stiffeners or rectangular SCL member.(2) 0,148" x 11W nails
must be installed into optional triangle joist nail holes for
standard installation values.
• ITS — optional triangle nail holes may be used for additional
load. See allowable load tables.
• MiT — optional triangle nail holes may be. used for increased
uplift capacity. See Optional Nailing. For Increased Uplift table.
• HIT — closed PAN nail'holes may be used for increased
uplift capacity. See Optional Nailing For Increased Uplift table.
• For sloped joists up to'/i:12 there is. no reduction, between
1/4:12 and up to 1W 2, tests show a 10% reduction in ultimate
hanger strength. Local crushing of the bottom flange or excessive
deflection may be limiting; check with joist manufacturer for
specific limitations on bearing of this type.
Allowable Loads:
• The ITS, MIT and Hi r hangers have locations for optional nails
If additional uplift is needed. Optional uplift nailing requires the
addition of properly -secured web stiffeners. See the load tables
for minimum required fasteners and allowable uplift loads,
• For attaching to multi -ply headers, refer to technical bulletin
T-C-MPLYHEADR at strongtie.corri.
Options:
• Because these hangers are fully die -formed, they cannot be
modified. However these models will normally accommodate
a skew of up to 5•.
Codes: -See p.12 for Code Reference Key Chart
o�umal
lolstnaU
oea5m -
tor:u�irt
W MIT
OrHIT
Funnel flange
iVplcal MIT Installed.
on a Double LVL
HIT Installation
on a 3x Nailer mounted
on a Steel Beam
(ITS, MIT similar)
0
-T vVI:L r c: ;,: f;:; r::,r ;, „ SIMPSON
Strong -Tie
_ - - . I -Joist- Hunger-s..-.._—_ _...-- . - ..-_ -.__.a._....... - .... .
1
R
6 This product Is preferable to similar connectors because
W of (a) enter installation, (b) higher loads, (a) tower installed
cost, ore combination of these features.
A "
The IUS is a hybrid Banger that incorporates the advantages of
the face -mount and top -mount hanger. Installation is fast with the
Strong -Grip'" seat, easy -to -reach face nails and self -jigging locator tabs.
The MIU series hangers are designed for commercial and high -load
I joist applications without requiring web stiffeners. The MIU features
Positive Angle Nailing (PAN), which minimizes splitting of the flanges
while permitting time -saving nailing from a better angle.
Material: IUS — 18 gauge;. MIU —16 gauge
Finish: Galvanized
Uplift Loads:
• Models have optional triangle joist nail holes for additional uplift.
Properly attached web stiffeners: are required.
• MIU — add four additional 0.148° x 1 W joist nails for a total
.uplift load of 975 lb.
Funnel
flame"
• IUS — add.web stiffeners and two 0.148° x 11/z' jolst nails In the triangle
Kir %4
Installation:
• Use all specified fasteners. Verify that the header can
take the required fasteners specified in the table.
See pp. 95-96 for more installation information.
• IUS — fasten hanger to header. Position [-joist into
hanger and snap into place. No joist nailing required.
Some IUS models have triangle and round header
nail holes. To achieve max download, fill both round
and triangle holes.
• IUS — Locator tabs are not structural. They may
be bent back to. adjust for hanger placement.
• IUS — for rimboard applications see technical
bulletin T RIMBDHGR at strongtie.com.
• IUS — I -joists with web stiffeners or rectangular
sections can be used with the installation of
(2) 0.148" x 1 %a nails into the optional triangle
joist nails.
• IUS — web stiffeners are not required with I joists
when the top flange is laterally supported by the
sides,of.the hanger unless required by kjoist
manufacturer.
Options:
• These hangers cannot be modified. However, these
models will normally accommodate a skew of up to 51.
For sloped joists up to 1/4:12 there is no reduction;
between 1/4:12 and up to 1W 2, tests show a 10%
reduction in ultimate hanger strength. Local crushing
of the bottom flange or excessive deflection may be
limiting; check with joist manufacturer for specific
limitations on bearing of this type.
Codes; See p.12 for Code Reference Key Chart
The Strong -Grip'" seat
secures I joists in position
without joist nails.
Avoid a
Misinstallation
Do not make your own holes.
Do not.nail the bottom flange.
(some IUS models
have triangle holes
in header flanges
for min./max. nailing)
U.S. Patent 6,523,321
IUS Installation Sequence
Step 1 Step 2
Attach the IUS to Slide the I joist downward
the header. Into the IUS until it rests
above the large teardrop.
MIU
Stet
Fim
I joi;
seal
.MIU with Correct
PAN Installation