Loading...
HomeMy WebLinkAbout30 DAY Power Release Planning a isilop ellit se1tv"10as �� �ili'g!1i119*: �. RECEIVE') rcej, FL.3 932 MAY 12 2021 _ 772-462 2, 5 Fax 772=46 443Far to 9 Ospartmerat St. Lucia--cuinta O es or 30'-Daytemporary,` d er il`S tease Date` /t/Z do Permit Number: G? . = Z- , Project.Address: °� : r /i 4 THE,tlNDERSIGNED iEREBY:?REQi1EST RELEASE OF ELECTRICAL POWER-TO THE:.ABOUE DESCRIBED PROPERTY, FORA PERIOD NOT Tb EXCEED THIRTY (30) DAYS; FOR THE PURPOSE-0F TESTING SYSTEMS" ND EQUIPMENT IN:PREPARATION'FORA FINAL,INSPEC UON IN CONSIDERATION OF.APPR6VAL.OF THE.' REOOEST WE*HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:. 1, This-temporary poWer releasels requested for the above stateupurpose oniy,and there Will'be no occupancy of any,type;other than-thatpermitted.by.construction during this time,peribd I As.vuitness by oursignatures,we hereby.agree.ta.abide-by a(G.terrns;and conditions of'this,agreement, inciudtng Building,Division-Poticy,`whic{i'is incorporaterl.herein.by reference Y . 3. A((.condit(dns and;requirements listed in the attached document entitled"Requirements far 3 .Day Power for Testing".have been fulfilled and the premise:is ready'for c'6fnO(iance`inspection 4. Al(requests`for an'extensibn beyond 3 days must be.made►n writing to the Budding Official stating the'reason:for the;:request. .Power.may removed from the site and/or a Stop Work.Order Issued cif the Fi'af:inspection.has not been approved within 30'days. A;fee of$10A OQ will be required to lift the Stop iNork;Ordleri 1ttilE HEREBX RELEASE AND:AGREE:T©:HELD HARMLESS, ST. LUCIE COUNTY,AND THEIR EMPLOYEES'FROM ALL-.LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE:WHICH MAY ARISE NO- OR IN THE_FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE`,INCiJRRED DUE TO`THE DI$CONNEC `IOKOF ELECTRICAL POWER IN THE EVENT OF VIOLATION 0 THIS AGREEMENT. . S 0DATF WNER'S G . ,TURF GENERA .CO. CTOR.SIGNATURE rDATE' _ ELECTRICAL CONTRAC•r0[ SICNATUR DA