HomeMy WebLinkAboutAPPROVED A-5.02TOP OF PARAPET W
@ EL. 14'-0" A.F.F.
BOTTOM OF AWNING
@ EL. 1 V-0" A.F.F.
JkBOTTOM OF HEADE
@ EL. 10'-0" A.F.F.
60 mil TPO ROOF MEMBRANE SYSTEM OVER
RIGID INSULATION (R-20 MIN.) ON %" CDX
PLYWOOD ROOF SHEATHING - ATTACHMENT
PER STRUCTURAL SPECIFICATIONS
1X P.T. FASCIA WITH PAINTED
METAL FLASHING
1X4 P.T. WOOD DRIP CAP
2x10 P.T. SUB -FASCIA ATTACHED
TO RAFTERS
2x8 RAFTERS - PER STRUCTURAL
REQUIREMENTS
SUPPORT BRACKETS ATTACHED TO CMU
WALL PER MANUFACTURER REQUIREMENTS
DASHED LINE INDICATES ROOF
SLOPES DOWN 4" PER FOOT, MIN
PRE-ENGINEERED CANOPY STRUCTURE
ATTACHED PER MANUFACTURER
REQUIREMENTS
BUILT-UP STUCCO BAND
3 PART SMOOTH STUCCO FINISH
ON 8" CMU WALL
ROOF SLOPES DOWN '14" PER FOOT MIN
/ �iT
FLUID APPLIED WEATHER
PROOFING MEMBRANE FLASHING
FROM INSIDE OF BUCK TO 12" �D
AROUND ROUGH OPENING °
SMOOTH STUCCO SURFACE BEYOND
ALUMINUM CHANNEL REVEAL BEYOND
--0 PF
EN CE OAM INSULATION SPRAY A PLZDJC
UNDERSIDE OF ROOF SHEATHING - -20 MIN.
INTUMISCENT PAINT CR TEA 0 MINUTE PFIRE BARR ON ERPLIED TO U IINIIMUM O
I
/ ANGLE BRA
BEN
4
-5.03
TYP.
%" GYP. BD SOFFIT ON 3 %",
20 GA MTL FRAMING @ 16"
O.C. MAX
%$" GYP BOARD ON 20 GA. 1 %2"
METAL FURRING STRIPS @
O.C. WITH R-4 MIN FI-FOIL
INSULATION (PERFORATED)
PAINTED WOOD JAMB AND
CASING - I.D. TO SELECT
TRIM PROFILES
STOREFRONT DOOR AND
TRANSOM SYSTEM
CONTINU(
TOP PL
-UDS ATTACHED TO BOTT M CHORD
,OF TRUSSES @ 24" O.C. MAX
OUS 1V32' PLYWOOD SHEATHING
- PAINTED WOOD
TONGUE AND
GROOVE CEILING
PAINTED WOOD
CROWN MOLDING
ANGLE BR/
BE
METAL CHANNEL
AT TOP OF WALL
INTERIOR WINDOW AND
—SMOOTH STUCCO BAND BEYOND PAINTED CASING BEYOND
OPEN TO
BEYOND
SMOOTH STUCCO SURFACE BEYOND
WAITING WAITING
OWNER SELECTED STONE
2" STUCCO BAND BEYOND CUSTOM PAINTED
WOOD RECESSED PANELS
N AT RECEPTION DESK
OPEN TO
SCHEDULED STOREFRONT BEYOND
DOOR
PAINTED WOOD JAMB AND \
CASING - I.D. TO SELECT
TRIM PROFILES \
' TILE SURFACE BEYOND
N I.D. SELECTED TILE \
OVER CONCRETE SUBSTRATE
/ [in I
- I.D. SELECTED
SLO E TO PA KING LOT
D D
b.
/ °.,p D D D D n D DA °777
° d
\ \ .a DIP � � /\
l.E F Q D D a. D. \ / N
\ \ \ \ \ \ ST U L D S
PARTIAL BUILDING SECTION
SCALE: 1" = V-0"
ROOF SLOPES DOWN %d" PER FOOT MIN
MED WALL B
C
4
TYP.
PRE -FABRICATED W
TRUSSES @ 24" O.C.
SPACING - SEE STRUC
ENGINEERING DRAW1N,
%" GYP. BD SOFFIT ON 3 %",
20 GA MTL FRAMING @ 24"
O.C. MAX
INTERIOR WALLS WITH %" GYP
BOARD ON EACH SIDE OF
3 %"x20 GA METAL STUDS @ 16" O.0
MAXIMUM SPACING
PAINTED WOOD DOOR CASING
- I.D. TO SELECT PROFILE
SCHEDULED GLASS DOOR
S
I.D. SE _E:C1 EE P
PAINTEDWCOE B
I.D. SE _E:C1 EE P
I.D. SELECTED TILE
SIAa>A
60 mil TPO ROOF MEMBRANE SYSTEM
OVER RIGID INSULATION (R-20 MIN.)
ON %" CDX PLYWOOD ROOF
SHEATHING -ATTACHMENT PER
STRUCTURAL SPECIFICATIONS
I P.T. DRIP CAP WITH PAINTED
METAL FLASHING INTEGRATED
WITH ROOF GUTTER
PAINTED METAL GUTTER SYSTEMS
- COLOR TO MATCH FASCIA
1X4 P.T. WOOD DRIP CAP
2x10 P.T. SUB -FASCIA ATTACHED
TO RAFTERS
2x8 RAFTERS - PER STRUCTURAL
REQUIREMENTS
BUILT-UP STUCCO BAND
RAIN LEADER BEYOND
3 PART SMOOTH STUCCO FINISH ON
PAPER BACKED WIRE LATH OVER
CONTIUOUS BUILDING WRAP ON
19/2' CDX PLYWOOD SHEATHING
2X12 TIGHT FIT
2x8 FRAMED WALL BETWEEEN TRUSSES
2 ROOF SLOPES DOWN !" PER FOOT MIN
PAINTED METAL FLASHING
WITH DRIP EDGE OVER ROOF
MEMBRANE TURNED UP CANT
STRIP COVER WITH COUNTER
FLASHING
SPLASH BLOCK ON EDPM PAD AT
BASE OF E CH RAINLEADER P E-FABRIC D W D
RUSSES @ 24" MA
— — — — PACING - SEE STRUC RAL
ENGINEERING DRAWINGS R
FURTHER INFORMATION °I
60 mil TPO ROOF
SYSTEM O
ROOF SHE
R STRU
MEMBRANE
ER 1%2' CDX PLYWOOD
THING - ATTACHMENT
TURAL SPECIFICATIONS
3-PLY GIRDER
TRUSS
3/4' WOOD FURRING
STRIPS @ 24" O.C.
MAX @UNDERSIDE
OF WOOD TRUSSES
°
I
II
SIMPSON CLIP EVERY
OTHER BLOCK -SEE
STRUCTURAL DRAWINGS
FOR MORE INFORMATION
TB-1 - SEE STRUCTURAL
DRAWINGS FOR MORE
INFORMATION _zl
%" GYP BOARD ON 1%2"
METAL FURRING
CHANNELS @ 16" O.C.
MAX SPACING WITH R-4
MIN FI-FOIL INSULATION
Ali
°
o
�e
PAINTED WOOD TONGUE
AND GROOVE CEILING
PAINTED WOOD
CROWN MOLDING
PAINTED WOOD JAMB
AND CASING - I.D. TO
SELECT TRIM PROFILES
FERENCE A/C
107 108
e ° • 8° d 4..°.
� C E TFL O SVA
O U R O
T TE R E ,W A T \ \ \
i� ice' /
PARTIAL BUILDING SECTION 2
SCALE:
�m
Digitally signed by - -
Brent Wood -
Brent 3
DN: cn=Brent Wood, d t
o=Brent A. Wood d = V
c a a
Architecture, LLC, ou, y .E'F
Woodemail c, =US _
darch.comomcUS
Date: 2021.04.29
14:09:08-04'00' a
=ay
O
U
O
Of
O
_ TOP OF PARAPET WALL ILL
@ EL. 14'-0" A.F.F.Ljj
'
H
U)
J
Q
60 mil TPO ROOF MEMBRANE ~
SYSTEM OVER RIGID INSULATION ~
(R-20 MIN.) ON %" CDX PLYWOOD
ROOF SHEATHING -ATTACHMENT CIO
PER STRUCTURAL SPECIFICATIONS U)
BOTTOM OF SLOPED ROOF ~
@ EL. +/- 11'-10" A.F.F.
1X4 P.T. DRIP CAP WITH PAINTED W
METAL FLASHING INTEGRATED
WITH ROOF GUTTER IL
CV
O
GUTTER SYSTEMS -COLOR TO CV
MATCH FASCIA CD
O
2x6 P.T. FASCIA ATTACHED TO
STUCCO WALL
BOTTOM OF TRUSSES
@ EL. +/- 10'-0" A.F.F.
3 PART STUCCO FINISH ON PAPER
BACKED WIRE LATH OVER
CONTIUOUS BUILDING WRAP ON
CDX PLYWOOD SHEATHING
OPEN CELL FOAM INSULATION
SPRAY APPLIED TO UNDERSIDE
OF ROOF SHEATHING - R-20 MIN.
INTUMESCENT PAINT APPLIED
TO INSULATION TO CREATE A 20
MINUTE FIRE BARRIER MINIMUM
WIRE MESH LATH AT ALL MATERIAL
CHANGE JOINTS FOR CRACK
PREVENTION - MIN. 12"
PRECAST LINTEL - SEE
STRUCTURAL DRAWINGS
FOR MORE INFORMATION
FLUID APPLIED WEATHER
PROOFING MEMBRANE FLASHING
FROM INSIDE OF BUCK TO 12"
AROUND ROUGH OPENING
RETURN STUCCO TO DOOR
FRAME
1X P.T. BUCK
SCHEDULED DOOR
EXISTING SLAB FOUNDATION
TO REMAIN
SPLASH BLOCK AT BASE OF
EACH RAINLEADER
_ FINISI FLOOR
a e a. • °' ° '° a4 — — — — — @ EL. '-0" A.F.F.
fj a o p
;ONCRETE FOUNDATION &
- SEE STRUCTURAL ENG a.
DWGS FOR FURTHER ° a • ° D D \ \
INFOA.
e
\ a °
/T T R D, E MP E T \
PARTIAL BUILDIN
G SECTION 3
SCALE: 1" = V-0" A-5.02
N
N
0
J
Q
m
m
Z)
C0
2
w
a
N
A
m
❑
N
N
�
o
Cn
z
w
0
o
U
_?
r
N
Z
N
D
o
�
D
(%j
N
M
7
In
rD
D-
OJ
Q
W
0
v
OaD
m
M
a
3�
Q
X
Z
> wi
O
0
mo
Q
U N
I-4
z
L
w
w
CO r
Q
CD
N F
J
LU
IY
Z
a
L�
r
Z
O
LL
2
U
E LU
z m
t
A)
a`
N
4
E
Z
N
N
L
N
'r0A'
r /
m
w �
> M
Q
❑ 0
Z
O
U�
OV
2 Q
�w
� 00
OZ
�w
NU)
�Z
ow