Loading...
HomeMy WebLinkAboutAPPROVED A-5.02TOP OF PARAPET W @ EL. 14'-0" A.F.F. BOTTOM OF AWNING @ EL. 1 V-0" A.F.F. JkBOTTOM OF HEADE @ EL. 10'-0" A.F.F. 60 mil TPO ROOF MEMBRANE SYSTEM OVER RIGID INSULATION (R-20 MIN.) ON %" CDX PLYWOOD ROOF SHEATHING - ATTACHMENT PER STRUCTURAL SPECIFICATIONS 1X P.T. FASCIA WITH PAINTED METAL FLASHING 1X4 P.T. WOOD DRIP CAP 2x10 P.T. SUB -FASCIA ATTACHED TO RAFTERS 2x8 RAFTERS - PER STRUCTURAL REQUIREMENTS SUPPORT BRACKETS ATTACHED TO CMU WALL PER MANUFACTURER REQUIREMENTS DASHED LINE INDICATES ROOF SLOPES DOWN 4" PER FOOT, MIN PRE-ENGINEERED CANOPY STRUCTURE ATTACHED PER MANUFACTURER REQUIREMENTS BUILT-UP STUCCO BAND 3 PART SMOOTH STUCCO FINISH ON 8" CMU WALL ROOF SLOPES DOWN '14" PER FOOT MIN / �iT FLUID APPLIED WEATHER PROOFING MEMBRANE FLASHING FROM INSIDE OF BUCK TO 12" �D AROUND ROUGH OPENING ° SMOOTH STUCCO SURFACE BEYOND ALUMINUM CHANNEL REVEAL BEYOND --0 PF EN CE OAM INSULATION SPRAY A PLZDJC UNDERSIDE OF ROOF SHEATHING - -20 MIN. INTUMISCENT PAINT CR TEA 0 MINUTE PFIRE BARR ON ERPLIED TO U IINIIMUM O I / ANGLE BRA BEN 4 -5.03 TYP. %" GYP. BD SOFFIT ON 3 %", 20 GA MTL FRAMING @ 16" O.C. MAX %$" GYP BOARD ON 20 GA. 1 %2" METAL FURRING STRIPS @ O.C. WITH R-4 MIN FI-FOIL INSULATION (PERFORATED) PAINTED WOOD JAMB AND CASING - I.D. TO SELECT TRIM PROFILES STOREFRONT DOOR AND TRANSOM SYSTEM CONTINU( TOP PL -UDS ATTACHED TO BOTT M CHORD ,OF TRUSSES @ 24" O.C. MAX OUS 1V32' PLYWOOD SHEATHING - PAINTED WOOD TONGUE AND GROOVE CEILING PAINTED WOOD CROWN MOLDING ANGLE BR/ BE METAL CHANNEL AT TOP OF WALL INTERIOR WINDOW AND —SMOOTH STUCCO BAND BEYOND PAINTED CASING BEYOND OPEN TO BEYOND SMOOTH STUCCO SURFACE BEYOND WAITING WAITING OWNER SELECTED STONE 2" STUCCO BAND BEYOND CUSTOM PAINTED WOOD RECESSED PANELS N AT RECEPTION DESK OPEN TO SCHEDULED STOREFRONT BEYOND DOOR PAINTED WOOD JAMB AND \ CASING - I.D. TO SELECT TRIM PROFILES \ ' TILE SURFACE BEYOND N I.D. SELECTED TILE \ OVER CONCRETE SUBSTRATE / [in I - I.D. SELECTED SLO E TO PA KING LOT D D b. / °.,p D D D D n D DA °777 ° d \ \ .a DIP � � /\ l.E F Q D D a. D. \ / N \ \ \ \ \ \ ST U L D S PARTIAL BUILDING SECTION SCALE: 1" = V-0" ROOF SLOPES DOWN %d" PER FOOT MIN MED WALL B C 4 TYP. PRE -FABRICATED W TRUSSES @ 24" O.C. SPACING - SEE STRUC ENGINEERING DRAW1N, %" GYP. BD SOFFIT ON 3 %", 20 GA MTL FRAMING @ 24" O.C. MAX INTERIOR WALLS WITH %" GYP BOARD ON EACH SIDE OF 3 %"x20 GA METAL STUDS @ 16" O.0 MAXIMUM SPACING PAINTED WOOD DOOR CASING - I.D. TO SELECT PROFILE SCHEDULED GLASS DOOR S I.D. SE _E:C1 EE P PAINTEDWCOE B I.D. SE _E:C1 EE P I.D. SELECTED TILE SIAa>A 60 mil TPO ROOF MEMBRANE SYSTEM OVER RIGID INSULATION (R-20 MIN.) ON %" CDX PLYWOOD ROOF SHEATHING -ATTACHMENT PER STRUCTURAL SPECIFICATIONS I P.T. DRIP CAP WITH PAINTED METAL FLASHING INTEGRATED WITH ROOF GUTTER PAINTED METAL GUTTER SYSTEMS - COLOR TO MATCH FASCIA 1X4 P.T. WOOD DRIP CAP 2x10 P.T. SUB -FASCIA ATTACHED TO RAFTERS 2x8 RAFTERS - PER STRUCTURAL REQUIREMENTS BUILT-UP STUCCO BAND RAIN LEADER BEYOND 3 PART SMOOTH STUCCO FINISH ON PAPER BACKED WIRE LATH OVER CONTIUOUS BUILDING WRAP ON 19/2' CDX PLYWOOD SHEATHING 2X12 TIGHT FIT 2x8 FRAMED WALL BETWEEEN TRUSSES 2 ROOF SLOPES DOWN !" PER FOOT MIN PAINTED METAL FLASHING WITH DRIP EDGE OVER ROOF MEMBRANE TURNED UP CANT STRIP COVER WITH COUNTER FLASHING SPLASH BLOCK ON EDPM PAD AT BASE OF E CH RAINLEADER P E-FABRIC D W D RUSSES @ 24" MA — — — — PACING - SEE STRUC RAL ENGINEERING DRAWINGS R FURTHER INFORMATION °I 60 mil TPO ROOF SYSTEM O ROOF SHE R STRU MEMBRANE ER 1%2' CDX PLYWOOD THING - ATTACHMENT TURAL SPECIFICATIONS 3-PLY GIRDER TRUSS 3/4' WOOD FURRING STRIPS @ 24" O.C. MAX @UNDERSIDE OF WOOD TRUSSES ° I II SIMPSON CLIP EVERY OTHER BLOCK -SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION TB-1 - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION _zl %" GYP BOARD ON 1%2" METAL FURRING CHANNELS @ 16" O.C. MAX SPACING WITH R-4 MIN FI-FOIL INSULATION Ali ° o �e PAINTED WOOD TONGUE AND GROOVE CEILING PAINTED WOOD CROWN MOLDING PAINTED WOOD JAMB AND CASING - I.D. TO SELECT TRIM PROFILES FERENCE A/C 107 108 e ° • 8° d 4..°. � C E TFL O SVA O U R O T TE R E ,W A T \ \ \ i� ice' / PARTIAL BUILDING SECTION 2 SCALE: �m Digitally signed by - - Brent Wood - Brent 3 DN: cn=Brent Wood, d t o=Brent A. Wood d = V c a a Architecture, LLC, ou, y .E'F Woodemail c, =US _ darch.comomcUS Date: 2021.04.29 14:09:08-04'00' a =ay O U O Of O _ TOP OF PARAPET WALL ILL @ EL. 14'-0" A.F.F.Ljj ' H U) J Q 60 mil TPO ROOF MEMBRANE ~ SYSTEM OVER RIGID INSULATION ~ (R-20 MIN.) ON %" CDX PLYWOOD ROOF SHEATHING -ATTACHMENT CIO PER STRUCTURAL SPECIFICATIONS U) BOTTOM OF SLOPED ROOF ~ @ EL. +/- 11'-10" A.F.F. 1X4 P.T. DRIP CAP WITH PAINTED W METAL FLASHING INTEGRATED WITH ROOF GUTTER IL CV O GUTTER SYSTEMS -COLOR TO CV MATCH FASCIA CD O 2x6 P.T. FASCIA ATTACHED TO STUCCO WALL BOTTOM OF TRUSSES @ EL. +/- 10'-0" A.F.F. 3 PART STUCCO FINISH ON PAPER BACKED WIRE LATH OVER CONTIUOUS BUILDING WRAP ON CDX PLYWOOD SHEATHING OPEN CELL FOAM INSULATION SPRAY APPLIED TO UNDERSIDE OF ROOF SHEATHING - R-20 MIN. INTUMESCENT PAINT APPLIED TO INSULATION TO CREATE A 20 MINUTE FIRE BARRIER MINIMUM WIRE MESH LATH AT ALL MATERIAL CHANGE JOINTS FOR CRACK PREVENTION - MIN. 12" PRECAST LINTEL - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION FLUID APPLIED WEATHER PROOFING MEMBRANE FLASHING FROM INSIDE OF BUCK TO 12" AROUND ROUGH OPENING RETURN STUCCO TO DOOR FRAME 1X P.T. BUCK SCHEDULED DOOR EXISTING SLAB FOUNDATION TO REMAIN SPLASH BLOCK AT BASE OF EACH RAINLEADER _ FINISI FLOOR a e a. • °' ° '° a4 — — — — — @ EL. '-0" A.F.F. fj a o p ;ONCRETE FOUNDATION & - SEE STRUCTURAL ENG a. DWGS FOR FURTHER ° a • ° D D \ \ INFOA. e \ a ° /T T R D, E MP E T \ PARTIAL BUILDIN G SECTION 3 SCALE: 1" = V-0" A-5.02 N N 0 J Q m m Z) C0 2 w a N A m ❑ N N � o Cn z w 0 o U _? r N Z N D o � D (%j N M 7 In rD D- OJ Q W 0 v OaD m M a 3� Q X Z > wi O 0 mo Q U N I-4 z L w w CO r Q CD N F J LU IY Z a L� r Z O LL 2 U E LU z m t A) a` N 4 E Z N N L N 'r0A' r / m w � > M Q ❑ 0 Z O U� OV 2 Q �w � 00 OZ �w NU) �Z ow