Loading...
HomeMy WebLinkAboutAPPROVED A-5.03TOP OF WALL @ EL. 14'-0" A. F. F. BB-2 - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION (2) 2X8 CONT. P.T. LEDGER - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION BB-1 - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION BOTTOM OF TRUSSES @ EL. +/- 10'-0" A.F.F. TB-1 - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION ACT CEILING _ @ EL. 9'-0" A.F.F. NEW 8" CMU WALL - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION 3 PART SMOOTH STUCCO FINISH ON 8" CMU BLOCK WALL CONTINUOUS 1%2' WATERSTOP @ SLAB EDGE CONTINUOUS VINYL WEEP SCREED AT BASE OF STUCCO NEW FOUNDATIONS AT NEW WALLS - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION ■ IFA ►A IA ►1 IA A ER Eli -- L U1 PAINTED METAL FLASHING WITH DRIP EDGE OVER ROOF MEMBRANE TURNED UP CANT STRIP COVER WITH COUNTER FLASHING SCHEDULED SUSPENDED ACOUSTIC TILE CEILING SYSTEM 5/" GYP BOARD ON 1%2' METAL FURRING CHANNELS @ 16" O.0 MAX. WITH R-4 MIN FI-FOIL INSULATION WINDOW BEYOND PAINTED WOOD BASE MOLDING - I.D. TO SELECT PROFILE I.D. SELECTED CARPET TILE D \ \ E\ E D L M CT EA H\ \ \ \ \ \ X BUILDING CROSS SECTION SCALE: 1" = V-0" ROOF MEMBRANE SYSTEM OVER RIGID INSULATION (R-20 MIN.) ON %" CDX PLYWOOD ROOF SHEATHING - ATTACHMENT PER STRUCTURAL SPECIFICATIONS 1X P.T. FASCIA WITH PAINTED METAL FLASHING 2x10 P.T. SUB -FASCIA ATTACHED TO RAFTERS 2x8 RAFTERS - PER STRUCTURAL REQUIREMENTS 60 mil TPO ROOF MEMBRANE SYSTEM OVER RIGID INSULATION (R-20 MIN.) ON %" CDX PLYWOOD ROOF SHEATHING - ATTACHMENT PER STRUCTURAL SPECIFICATIONS PRE -FABRICATED WOOD TRUSSES @ 24" O.C. MAX SPACING - SEE STRUCTURAL ENGINEERING DRAWINGS FOR FURTHER INFORMATION BUILT-UP STUCCO BAND A 2X8 FRAMED WALL PAINTED METAL FLASHING WITH DRIP EDGE OVER ROOF MEMBRANE TURNED UP CANT STRIP COVER WITH COUNTER FLASHING 60 mil TPO ROOF MEMBRANE SYSTEM OVER 1V32" CDX PLYWOOD ROOF SHEATHING - ATTACHMENT PER STRUCTURAL SPECIFICATIONS jk BOTTOM OF TRUSSES @ EL. +/- 10'-0" A. F. F. r ACT CEILING @ EL. 9'-0" A.F.F. 4" SLAB ON GRADE 4 60 mil TPO ROOF MEMBRANE SYSTEM Z�2L � -5.03 OVER RIGID INSULATION (R-20 MIN.) 2 ON %" CDX PLYWOOD ROOF SHEATHING - ATTACHMENT PER STRUCTURAL SPECIFICATIONS 1X P.T. FASCIA WITH PAINTED c METAL FLASHING 1X4 P.T. WOOD DRIP CAP D 2x10 P.T. SUB -FASCIA ATTACHED TO RAFTERS 7.�7 2x8 RAFTERS - PER STRUCTURAL REQUIREMENTS ANGLE BRACING BUILT-UP STUCCO BAND BEYO D :: TIE BEAM PER STRUCTURAL SPECIFICATIONS 3 PART STUCCO FINISH ON 8" CMU BLOCK WALL FRAMED WALL BE ND FRAMED WALL BE ND — PRE -FABRICATED WOOD TRUSSES @ 24" O.C. MAX SPACING - SEE STRUCTURAL ENGINEERING DRAWINGS FOR FURTHER INFORMATION SCHEDULED SUSPENDED ACOUSTIC TILE CEILING SYSTEM BUILDING CROS ENLARG CONTIN O S METAL CHANN TOP PLA AT TOP OF WALL METALC ANNEL BETWEEN 24" O.C. MAX %" GYP. BD SOFFIT ON 3 %", 20 GA MTL FRAMING @ 24" O.C. MAX INTERIOR WALLS WITH %$" GYP BOARD ON EACH SIDE OF 3 %"x20 GA METAL STUDS @ 16" O.C. MAXIMUM SPACING S SECTION 2 SCALE: 1" = V-0" A-5.03 ED SECTION AT SOFFIT 4 SCALE: 1" = V-0" A-5.03 NEW 8" CMU WALL - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION ANGLE BF B PAINTED WOOD TONGUE AND GROOVE CEILING �D PAINTED WOOD P CROWN MOLDING D, GYP. BD SOFFIT ON 3 5/$', 20 GA MTL FRAMING @ 16" O.C. MAX iu ° . D . d D 6Do FLUID APPLIED WEATHER GYP BOARD ON 20 GA. 1 %2" METAL FURRING STRIPS @ 16" O.C. WITH R-4 MIN FI-FOIL PROOFING MEMBRANE FLASHING FROM INSIDE OF BUCK TO 12 AROUND ROUGH OPENING INSULATION (PERFORATED) PAINTED WOOD WINDOW CASING STOREFRONT DOOR AND - I.D. TO SELECT PROFILE TRANSOM SYSTEM INTERIOR STOREFRONT WINDOW BEYOND Ile PAINTED WAINSCOTING - I.D. TO SELECT PROFILE SCHEDULED STOREFRONT WINDOW Pi INTED WOOD CASING - I.D. TO SELECT PROFILE PAINTED WOOD BASE CONTINUOUS PRE -FINISHED FLASHING MOLDING - I.D. TO @ BASE OF WINDOW OPENING SELECT PROFILE I.D. SELECTED TILE NEW FOUNDATIONS AT NEW WALLS - SEE STRUCTURAL AL DRAWINGS FOR MORE ,. INFORMATION /\ x e \ \ \ \ D • .D a D. '•D '. D e� pp \ \ \ \\ \ \ \ \ \ \01,\ \ \ /X/ /\ \ \ RI T A D L ATE E \ \\ BUILDING CROSS SECTION 3 SCALE: 1" = V-0" A-5.03 Digitally signed by Brent Brent Wood DN: cn=Brent Wood, o=Brent A. Wood Architecture, LLC, ou, Woodemail=brent@bawood arch.com, c=US Date: 2021.04.29 14:09:35-04'00' 6' c a y E a U - =ay a8 ti w co Z O U U) O elf ILL. LU J H H_ m ZD U) H_ LU 11 r CV C9 C14 L N N O J m Z) Ln LU a N A m O m ❑ N 6 N 0 o Ln z Ld O o U N Z N D ❑ o � U (%j N W Q W v O Al M aD � a � x x Z > Li Z �o N I-4 z L w w (n Q m N F ti rn w M >Q z Z O z C� Q o= �w z 0 co Q Z C0 w o' W U) o Z 0 w U J a z z a w� L M r z ❑0 12�UO LL 0 U � LU U °Z Q L0 w �U) a� z COo W a> 'S ` a J 0 06 (n O U �0 's J n J Q w M O ' N Q : N r / E w 3 Z C CD N O p p N i 6-a@