HomeMy WebLinkAboutAPPROVED D-1.11DEMOLITION NOTES 1. DO NOT CONSIDER DEMOLITION NOTES TO BE ALL INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS THE SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. BRING ALL DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED BY FIELD CONDITIONS TO THE ATTENTION OF THE ARCHITECT. 2. CUTTING AND REMOVAL INDICATED ON THE DRAWINGS ARE GENERAL INDICATIONS ONLY AND DO NOT NECESSARILY SHOW THE FULL EXTENT OF CUTTING AND REMOVAL WHICH MAY BE REQUIRED BY THE JOB CONDITIONS. 3. CONTRACTOR SHALL VERIFY AND ESTABLISH EXISTING CONDITIONS AND DIMENSIONS BEFORE PROCEEDING WITH ANY PORTION OF THE WORK. 4. CONTRACTOR SHALL VERIFY LOCATIONS AND EXTENT OF STRUCTURE AND ITEMS TO BE DEMOLISHED AND REMOVED. 5. EXTENT OF DEMOLITION AND REMOVAL WORK IS SHOWN ON DRAWINGS AND INCLUDES, BUT IS NOT NECESSARILY LIMITED TO THE FOLLOWING; EXISTING INTERIOR & EXTERIOR FINISHES, INTERIOR PARTITIONS, DOORS, FRAMES, CEILING SYSTEMS, MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, STRUCTURAL WALLS, BEAMS & COLUMNS, ROOFING, WATERPROOFING, DOORS AND WINDOWS. 6. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED BY LOCAL AUTHORITIES HAVING JURISDICTION. 7. ALL DEMOLITION WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LOCAL ORDINANCES AND BUILDING CODES. 8. REMOVE AND DISPOSE OF ALL STRUCTURE AND ITEMS AS INDICATED. DEMOLISHED AND REMOVED ITEMS SHALL BE DISCARDED. TRANSPORT DEMOLISHED MATERIALS OFF OF THE OWNERS PROPERTY AND LEGALLY DISPOSE OF THEM. 9. THE CONTRACTOR SHALL SUPPLY AND COORDINATE WITH PROPERTY OWNER FOR LOCATION OF GARBAGE DUMPSTERS PRIOR TO COMMENCEMENT OF DEMOLITION. 10. CONTRACTOR IS RESPONSIBLE FOR AND WILL HAVE CONTROL OF DEMOLITION MEANS, METHODS, AND TECHNIQUES. SEQUENCES AND PROCEDURES. THE CONTRACTOR SHALL PROVIDE FOR THE SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE ARCHITECT WILL NOT BE RESPONSIBLE FOR THE CONTRACTORS FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 11. THE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO DEMOLITION AND/OR CONTRACT NEGOTIATIONS AND SHALL VERIFY EXISTING CONDITIONS WITH THE DEMOLITION DOCUMENTS. DISCREPANCIES BETWEEN DEMOLITION DOCUMENTS (AND THEIR INTENT) SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR CLARIFICATION. BIDS SHALL NOT BE SUBMITTED OR CONTRACTS NEGOTIATED BY THE CONTRACTOR PRIOR TO CLARIFICATION OF THE INTENT OF THE DEMOLITION DOCUMENTS WHERE SUCH INTENT IS IN DOUBT. 12. CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION TO PORTIONS OF THE BUILDING TO REMAIN IN THE COMPLETED PROJECT. 13. NOTIFY THE ARCHITECT IF UNDOCUMENTED STRUCTURAL MEMBERS ARE UNCOVERED DURING THE COURSE OF DEMOLITION. KEEP THE ARCHITECT NOTIFIED OF THE PROGRESS OF DEMOLITION. 14. PRIOR TO THE START OF DEMOLITION AND EXCAVATION WORK, THE CONTRACTOR SHALL CALL 48 HOURS BEFORE DIGGING; "SUNSHINE 811 -CALL BEFORE YOU DIG" TO LOCATE ALL EXISTING UTILITY LINES. ANY DISRUPTION OF UTILITY SERVICES CAUSED BY FAILURE OF PRIOR NOTIFICATION OF UTILITY COMPANIES SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. AND ALL COSTS ASSOCIATED WITH PROPER REPAIR AND RESTORATION OF DAMAGED UTILITY SERVICES SHALL BE BORNE BY THE CONTRACTOR. 15. WHERE ELECTRICAL WIRES ARE EXPOSED, CONTRACTOR SHALL CAP ENDS OF CUT WIRES TO PROTECT AGAINST ELECTRIC SHOCK. 16. REMOVE PROJECTIONS, HANGERS, BOLTS, NAILS, ETC. FROM EXISTING SURFACES. PATCH ALL HOLES TO MATCH THE ADJACENT SURFACES TO REMAIN. 17. CONTRACTOR SHALL SUBMIT SCHEDULE OF OPERATIONS, PHASING PLAN & SCHEDULE AND ACTION PLAN FOR OWNERS AND ARCHITECTS APPROVAL. SCHEDULE AND ACTION PLAN SHALL INCLUDE PHASING, HOURS OF OPERATION, STAGING AREA AND USE OF UTILITY SERVICES. HOURS OF OPERATION SHALL BE GOVERNED BY THE LOCAL JURISDICTION POA AND OWNER'S CONSENT. 18. CONTRACTOR SHALL SUBMIT WASTE REMOVAL PLAN, WHICH SHALL INCLUDE LOCATION PLAN OF ALL DEBRIS DUMPSTERS AND SHALL BE GOVERNED BY LOCAL JURISDICTION AND SAILFISH POINT POA REGULATIONS. 19. CONTRACTOR SHALL COORDINATE WITH THE PROPERTY OWNER FOR ALL SYSTEMS AND UTILITIES SHUT-OFF REQUIREMENTS WITH BUILDING OPERATIONS. 20. PEDESTRIAN PROTECTION:THE WORK OF DEMOLISHING ANY BUILDING SHALL NOT BE COMMENCED UNTIL PEDESTRIAN PROTECTION IS IN PLACE AND APPROVED BY LOCAL JURISDICTION & POA AS GOVERNED BY THE AUTHORITY HAVING JURISDICTION. 21. WATER ACCUMULATION: CONTRACTOR SHALL MAKE PROVISIONS TO PREVENT THE ACCUMULATION OF WATER AND/OR DAMAGE TO ANY PROPERTY OR FOUNDATIONS ON THE PREMISES OR ANY ADJOINING PROPERTY. 22. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP THE JOBSITE CLEAN AND CLEAR OF DEBRIS DURING DEMOLITION. UPON COMPLETION OF THE WORK THE CONTRACTOR SHALL ENSURE THAT THE JOB SITE HAS BEEN CLEANED TO THE OWNER'S SATISFACTION, PRIOR TO THE CONTRACTOR VACATING THE SITE. 23. UTILITY CONNECTIONS: UTILITY SERVICE CONNECTIONS SHALL BE DISCONTINUED AND CAPPED IN ACCORDANCE WITH APPROVED RULES AND REGULATIONS PER THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. #3 @ 12" 0. C. x TRENCH WIDTH. DRILL & EPDXY 4" INTO EDGE OF EXISTING SLAB @ MID -DEPTH ALIGN / I ALIGN 717 EXISTING SOIL / SLAB FOUNDATION/�� III GRADE, MATCH G ICKNESS, BUT CONTINUOUS 6 mil VAPOR / �j / / \ /\ /FiAN 4" BARRIER NEW PLUMBING LINES /\� �� / T�EATED, CLEAN ELECTRICAL CONDUIT >/jj�j \ /\ �\ �\ �\ �� \ \ ACTED FILL SLAB TRENCHING / IN -FILL DETAIL 2 SCALE: 3/4" = V-0" ❑-1.1 REMOVE WALL & BEAM. . 'O EXTENTS INDrcATED. PREPARE OPENING TO ECIEVE. NEW --BEAM -PER TRUGTURAL- ENG--DWGS _ 1�-0 9'-01, 4'-0" 9'-01, 33'-7„ 3'-0" 3'-0" 3'-0" 2'-4" 6'-8" 4'-4" 3'-4" 5'-11 " 3'4" 4'-4" HATCHED AREA INDICA= APPDXIMATE LOCATION TO REMOVE SIDEWALK ND PREPARE FOR NEW SLAB N GRADE, FOUNDATIONS, AND LANDSCAPING AREA - SEE A-1.11 F R MORE INFO TION - REMO E DOORS & VYINDOWS & PREPARE O ENINGS TO ECIEVE NEW I DOORS, WINDOWS O MASONARY INFILL. SE 1/A-1.11 FO NEW LAYOUT w DEMOLITION LEGEND EXISTING GLAZING SYSTEM TO REMAIN EXISTING 8" CMU EXTERIOR WALL TO REMAIN EXISTING INTERIOR FRAMED PARTITION TO REMAIN 8" CMU EXTERIOR WALL TO BE REMOVED EXISTING CONSTRUCTION TO BE REMOVED ■ ■ ■� I �■ - - fin. 4%2' 1 %2" 3'4" .2'-2" . 3'-0" ,. 5'-0" 1- ■ ■ ■ ■ ■ ■ 7__7 CV R MOVE & DISCARD ALL OR WALLS, FINISHES FIXTURES & ■ PLUMBING. EXPOSE FLOOR SL ROOF STRUCTURE, REMOVE ROOF & ROOF STRUCTURE & PREPARE OF TIE BEAM TO RECEIVE NEW ROOF . STR CTURE. SEE ARCH & S RAL DRAWINGS FOR NEW DESIGN. .- -. - - L? r - ■ T E A A A S P ■ N I- O TI N M H C D A `� F O S B DI AT S P XI A F R E S B C T E N R E N L L D U D 10 S A F W L ■ ■ E D 6' F U A O r - 2'-2" O ' f7 00 . I 0 HATCHED A I DICATES APPDXIMATE ��_LOCA71ON7 FLOOR SLAB &TRENCH FOR E O 10 NEW PLUMBI IXTURES. COORDINATE WITH V E O F A D NEW LAYO 1/A-1.11 O D E -' W L , F IS W L F IS B G 4 0 _ op , S, I A S co ■ L B G N NAS SI E O W LL U 1 T D F DI A B L G S N- is 1 1 C 7'-10" : I- REMOVE BRICK VENEER FROM ALL Q EXTERIOR WALLS TO REMAIN 00 <. REMOVE EXISTING PROPANE _ TANK & SAS:LINES= .CD EXISTING:ELECTRIC _ - . ■ METERS TO BE -REMOVED.- & REPLACED WITH SINGLE 'ELEC7R EtCE 0. co 8" 3 7/z 3' Y2= : . 3-4 •2-b. 2-0 3-4 9.-2 4- Al V-8" 2Fi20" 3'-0" 4'-3Y2'I 4'-6" ' 111 32'-5" 3'-10%2' 1'K 0*2" 1, 3, 0„ 2,_0„ oe 1 '-0" REMOVE DOORS & WINDOWS & PREPARE OPENINGS TO RECI EVE NEW DOORS, WINDOWS ORMASONARY INFILL SEE 1/A-1.11 FOR NEW LAYOUT NOTE. EXISTING HVAC CONDENSING UNITS INDICATED HERE TO BE REMOVED/REPLACED WITH NEW - COORDINATE WITH MECHANICAL DRAWINGS AND SPECIFICATIONS PRIOR TO DEMOLITION 11% REMOVE DOORS & WINDOWS & PREPARE OPENINGS TO RECIEVE NEW DOORS, WINDOWS OR MASONARY INFILL. SEE VA-1,11 FOR NEW LAYOUT Digitally signed by BrentDN: Brent Wood cn=Brent Wood, o=Brent A. Wood Architecture, LLC, ou, email=Brent@bawoo wo O U darch.com, c=US Date: 2021.01.26 16:53:12-05'00' DEMOLITION FLOOR PLAN 1 SCALE: 1/4" = V-0" NORTH O V OC U) O U 0� O ILL J Q H H_ m F_ � ��/ Of Lu EL N N 1 N ro Q N Z Q Z Q W 0 r- Lu > o❑ z a° ULL O x = U �a �w O m 0 Z m w dZ �w LO Lu �o z a° ULL C: xU �a �w O m mZ ,r, w toz aw m da N N O N � E z hi z N N N ❑ O p N a a O