Loading...
HomeMy WebLinkAboutEngineering; Floor Joisti a - Single 16" BCI® 4500s-1.8 0 BoiseCascade 11 1st FloorlFloor JoistSW1(i762) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 ,Job name: - File name: _ N362326L&R.mmdl Address: Description: 1st Fioor\Floor Joists\J 1 (i762) City, State, Zip: Specifier: C RE E K S I D E Customer: Designer: LOT 110 Code reports: ESR-1336 Company: i n-09-00 B1 Total Horizontal Product Length = 17-09-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind B 1, 4" 703 / 0 176 / 0 B2, 2" 703 / 0 116 / 0 Load Summary 132 Roof Live Live Dead Snow Wind Roof OCS Live Ref. Start End Loc. 106% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summa End Reaction End Shear Hole #1 Shear Hole #2'Shear Total Load Deflection Live Load Deflection Max Defl. Span / Depth Hole Location Value i % Allowable Duration 3774 ft-IbS. 920011,-._­_.. � 1.00% 879lbs 81.3% 100% 863lbs 43.7% 100% 447lbs 81.5% 100% 514lbs 93.7% 100% U615 (0.339") 58.6% n\a U768 (0.271 ") 62.5% n\a 0.339" 33.9% n\a 13.0 Valid Case Location' 1 17-09-00 1 00-04-00 - 3 05-00-00 4 13-09-00 1 09-00-02 6 09-00-02 1 09-00-02 Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 1 of 82 BoiseCasaade g Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistslJ1(i762) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ _.__ .__........._._ _. File. name: __ N362326L&R mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i762) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS7m, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 2 of 82 y @),Boise Cascade BC CALCO Member Report Build 7493 Single 16" BCI® 4500s-1.8 1st Flooffloor JoistslJ1(i762) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021.12:28:44 Job name: _ .._ ._ ,___ ._. _ __._....__._._........_File name: _ N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i762) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 17-09-00 B1 B2 Total Horizontal Product Length = 17-09-00 Reaction Summary (Down / Uplift) (Ills) Bearing Live Dead Snow Wind Roof Live 131,4" 703/0 176/0 B2, 2" 70310 176 / 0 Load Summary Live Dead Snow Wind Roof' OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft)I L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value I % Allowable Duration Case Location Pos. Moment -,- ------�L774ft Ibs_ .._... 92:3% :.. _...._,•:100%­ - _ <,. ,.1 _,..,..,09-00-02 End Reaction 879 Ibs 81.3% 100% 1 17-09-00 End Shear 863 Ibs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 Ibs 81.5% 100%. 3 05-00-00 Hole #2 Shear 514 Ibs 93.7% 100% 4 13-09-00 Total Load Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271 ") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LXW) Value Support Member Material 131 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified 132 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 111/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 3 of 82 aBoise Cascade Single 16" BCI® 4500s-1.8 1st Flooffloor Joists\J1(i762) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:. _ _.__......_._... _ _..._ ... File name: .. N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i762) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (U360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite EI value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJST" ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAMTm, BC FloorValue(D, VERSA -LAM), VERSA -RIM PLUSO , Page 4 of 82 *Boise cascade _ _ _. __. Single 16" BCIO 4500s-1.8 �ASSEI 1st FloorlFloor JoistsUI(i762) - 02 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 n-09-00 B1 B2 Total Horizontal Product Length = 17-09-00 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B 1, 4" 703 / 0 176 / 0 B2, 2" 703 / 0 176 / 0 Load Summary Live . Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location -Po,:,Moment 3774 ft-Ibs - ... -.--. .92.3%:...; . 100% - .. _........:'I --1-09-00-02-.._._. _... End Reaction 879 Ibs 81.3% 100% 1 17-09-00 End Shear 863 Ibs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 Ibs 81.5% 100% 3 05-00-00 Hole #2 Shear 514 Ibs 93.7% 100% 4 13-09-00 Total Load Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal - % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 5 of 82 Boise Cascade Single 16" BCI® 4500s-1.8�D 1st Flooffloor Joists\J1(i762) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ _ .. _,_. _....____._..._____... Filename: N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i762) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS— ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 6 of 82 Boise Cascade Single 16" BCI® 4500s-1.8 1st Flooffloor Joists\J1(i762) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: __. _ _ _ ... _ _ __..___ . _ __._File name:. _ N362326L&R.mmdl _ Address: Description: 1 st Floor\Floor Joists\J 1(i762) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 n-09-00 Total Horizontal Product Length=17-09-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 703/0 176/0 B2, 2" 703 / 0 176 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos.-Moment 92.3% _ 100%---- 1 End Reaction 879 Ibs 81.3% 100% 1 17-09-00 End Shear 863 Ibs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 Ibs 81.5% 100% 3 05-00-00 Hole #2 Shear 514 lbs 93.7% 100% 4 13-09-00 Total Load_ Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1=1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 7 of 82 Boise cascade Single 16" BCI® 4500s-1.8 PAE 1st FloorlFloor JoistslJ1(i762) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _.F.ile.name:.... _...N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i762) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live -load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by.a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOI$T@ , BC RIM BOARDTm, BCI@), BOISE GLULAMI-, BC FloorValue® , VERSA-LAMO, VERSA -RIM PLUSO , Page 8 of 82 613olse Cascaded Single 16" BCI® 4500s-1.8 P�S�IaF 1st Flooffloor JoistslJ1(U64) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:. _.._.. _ _...... __ _. _ . __._.. _.__._.. File name: __ N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i764) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: z - V 2 r7-09-00 131 132 Total Horizontal Product Length = 17-09-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 646/0 161 /0 B2, 2" 701 / 0 175 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 01-07-15 17-09-00 Top 40 10 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3749 ft-Ibs 91.7% 100% 1 09-00-02 End Reaction 876 Ibs 81.1 % 100% 1 17-09-00 End Shear 860 Ibs 43.5% 100% 1 17-07-00 Hole #1 Shear 448 Ibs 81.6% 100% 3 05-00-00 Hole #2 Shear 511 Ibs 93.2% 100% 4 13-09-00 Total Load Deflection U619 (0.337") 58.1 % n\a 1 09-00-02 Live Load Deflection U774 (0.269") 62.0% n\a 6 09-00-02 Max Defl. 0.337 33.7% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 807 Ibs 13.2% 54.7% Unspecified B2 Hanger 2"x1-3/4" 876lbs 76.2% 81.1% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 9 of 82 Boise cascade Single 16" BCI® 4500s-1.8 1st Floor\Floor Joists\J1(i764) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:. ..File name:. N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i764) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of -input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 10 of 82 Boise cascade = - Single 16". BCIO 4500s-1.8 I?ASEI 1st FlooffloorJoistsWI(U66) (Floor Joist) BC CALCO Member Report Dry 1 span No cant. 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: name: N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i766) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: z n-09-00 B1 B2 Total Horizontal Product Length = 17-09-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 586/0 147/0 B2, 2" 586 / 0 147 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 67 17 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment- 3145 ft-Ibs 76.9% - 100% 1 09-00-02----�- •. • • -. �> - .---- End Reaction 733 Ibs 67.8% 100% 1 17-09-00 End Shear 719 Ibs 36.4% 100% 1 00-04-00 Hole #1 Shear 373 Ibs 67.9% 100% 3 05-00-00 Hole #2 Shear 428 Ibs 78.1 % 100% 4 13-09-00 Total Load Deflection U738 (0.283") 48.8% n\a 1 09-00-02 Live Load Deflection U922 (0.226") 52:1 % n\a 6 09-00-02 Max Defl. 0.283" 28.3% - n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13=09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 733'lbs 12.0% 49.7% Unspecified B2 Hanger 2" x 1-3/4" 733 Ibs 63.7% 67.8% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 11 of 82 *Boise cascade Single 16" BCI® 4500s-1.8 1st Floor\Floor Joists\J1(i766) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: - . _.__._ __ _.._ _ _..____....__ _ __ File name: N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i766) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (U360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 12 of 82 aBolse cascade MEE Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistslJ1(i766) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _. File name:.. N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J1(i766) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company:. 131 17-09-00 Total Horizontal Product Length = 17-09-00 132 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B 1, 4" 586 / 0 147 / 0 B2, 2" 586 / 0 147 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 67 17 n\a Controls Summary Value %Allowable Duration Case Location .Pos. -Moment —3145-ft•dbs- , __: _ 76.9% - -.100% - ..., ..... . _4• - •, ,-09-00-02 -• . ­ 11--- ^...,_..,...-= End Reaction 733 lbs 67.8% 100% 1 17-09-00 End Shear 719 lbs 36.4% 100% 1 00-04-00 Hole #1 Shear 373 lbs 67.9% 100% 3 05-00-00 Hole #2 Shear 428 lbs 78.1 % 100% 4 13-09-00 Total Load Deflection U738 (0.283") 48.8% n\a 1 09-00-02 Live Load Deflection U922 (0.226") 52.1 % n\a 6 09-00-02 Max Defl. 0.283" 28.3% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" - Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 733, lbs 12.0% 49.7% Unspecified B2 Hanger 2" x 1-3/4" 733 lbs 63.7% 67.8% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 13 of 82 Boise cascade Single 16" BCI® 4500s-1.8 1st FlooAFloor JoistsW1(i766) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: - _ . _._..._..._.... _.__._ .__ _._._......_ .. File name:. _N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J1(i766) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 14 of 82 Boise cascade - Single 16" BCI® 4500S-1.8 �SSEE� 1st Floor\Floor JoistslJ1(i769) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 24 OCS I Non -Repetitive Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:. _ File name: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J1(i769) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 n-09-00 Total Horizontal Product Length = 17-09-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 817/0 204/0 B2, 2" 662 / 0 165 / 0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 01-07-15 17-09-00 Top 73 18 n\a 2 J6(i771) Conc. Pt. (Ibs) L 01-08-13 01-08-13 Top 308 77 ri\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3674 ft-Ibs 89.8% 100% 1 08-07-13 End Reaction 827 Ibs 76.5% 100% 1 17-09-00 End Shear 1021 Ibs 51.7% 100% 1 00-04-00 Hole #1 Shear 401 Ibs 73.2% 100% 3 05-00-00 Hole #2 Shear 495 Ibs 90.2% 100% 4 13-09-00 Total Load Deflection U625 (0.334") 57.6% n\a 1 08-10-11 Live Load Deflection U781 (0.267") 61.4% n\a 6 08-10-11 Max Defl. 0.334" 33.4% n\a 1 08-10-11 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L . 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 1021 Ibs 16.7% 69.2% Unspecified B2 Hanger 2" x 1-3/4" 827 Ibs 71.9% 76.5% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 15 of 82 Of Boise Cascade 99 Single 16" BCI® 4500s-1.8 1st Floor\Floor JoistslJ1(i769) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _. _ . ._._ -- File. name: _ N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i769) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC), BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue(D, VERSA -LAM), VERSA -RIM PLUS@ , Page 16 of 82 Boise Cascade RM2 Single 16" BUD 4500s-1.8 PASSED 1st Floor\Floor Joists\J1(1772) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ . _... _File name: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J1(i772) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 17-09-00 , Total Horizontal Product Length=17-09-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 514/0 129/0 B2,2" 514/0 129/0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 58 15 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2759 ft-Ibs- 67.5% -100% - 1 - 09-00-02--- -• :::-_._.._._ End Reaction 643 Ibs 59.5% 100% 1 17-09-00 End Shear 631 Ibs 31.9% 100% 1 00-04-00 Hole #1 Shear 327 Ibs 59.6% 100% 3 05-00-00 Hole #2 Shear 376 Ibs 68.5% 100% 4 13-09-00 Total Load Deflection U841 (0.248") 42.8% n\a 1 09-00-02 Live Load Deflection U1051 (0.198") 45.7% n\a 6 09-00-02 Max Defl. 0.248" .24.8% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 643 Ibs 10.5% 43.6% Unspecified B2 Hanger 2" x 1-3/4" 643 Ibs 55.9% 59.5% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 17 of 82 Single 16" BCI® 4500s-1.8 I 013olse Cascade — BC CALCO Member Report Build 7493 Job name: - Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st Flooffloor JoistslJ1(i772) (Floor Joist) Dry 11 span I No cant. 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 _..._.. _.. ,.. _File name: N362326L&R_mmdl Description: 1 st Floor\Floor Joists\J 1(i772) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 18 of 82 Boise Cascade Single 16" BCI® 4500s-1.8 PASS 1st Flooffloor JoistsW2(1745) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 24 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 _Job name: _- __ __.......__..___ ..-_.._-.-.File name: N362326L&R.mmdl. _ Address: Description: 1st Floor\Floor Joists\J2(i745) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: NO 0 B1 15-04-14 Total Horizontal Product Length = 15-04-14 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof_ _Live B1,4" 611/0 153/0 B2, 2" 610/0 152/0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Po&•Moment - -2824 ft-Ibs g9.0%- 100% 1 09-03— End Reaction 762 Ibs 70.5% 100% 1 15-04-14 End Shear 745 Ibs 37.7% 100% 1 00-04-00 Hole #1 Shear 354 Ibs 64.5% 100% 3 04-09-08 Hole #2 Shear 361 Ibs 65.8% 100% 4 10-10-08 Total Load Deflection U915 (0.197') 39.3% n\a 1 07-09-08 Live Load Deflection U1144 (0.158") 42.0% n\a 6 07-09-08 Max Defl. 0.197" 19.7% n\a 1 07-09-08 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-09-08 8" L 12" Circular Horizontal H02 10-10-08 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LXW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 764 Ibs 12.5% 51.8% Unspecified B2 Hanger 2" x 1-3/4" 762 Ibs 66.3% 70.5% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 19 of 82 Boise Cascade M Single 16" BCI® 4500s-1.8 1st Floor\Floor JoistsW(U45) (Floor Joist) BC CALCO Member Report Dry 1 span, I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 -.Job name: ._. __ __ Fite name: N362326L&R.mmdl . . Address: Description: 1st Floor\Floor Joists\J2(i745) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB she,'athing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 20 of 82 • Boise cascade — Single 16" BCIO 4500s-1.8 f"AaiEl 1st Flooffloor JoistSU2(i755) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: ___......_._ ...............__._File name: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J2(i755) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 15-04-14 Total Horizontal Product Length = 15-04-14 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 4" 53410 133 / 0 B2, 2" 530 / 0 133 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-14 15-04-14 Top 30 7 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 40 10 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2456 ft-Ibs 60.1 % 100% 1 07-09-08 End Reaction 663 Ibs 61.3% 100% 1 15-04-14 End Shear 648 lbs 32.8% 100% 1 00-04-00 Hole #1 Shear 308 Ibs 56.1 % 100% 3 04-09-08 Hole #2 Shear 314 Ibs 57.2% 100% 4 10-10-08 Total Load Deflection L/1052 (0.171 ") 34.2% n\a 1 07-09-08 Live Load Deflection L/1315 (0.137") 36.5% n\a 6 07-09-08 Max Defl. 0.171" ' 17.1% n\a 1 07-09-08 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-09-08 - 8" L 12" Circular Horizontal H02 10-10-08 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 667 Ibs 10.9% 45.2% Unspecified B2 Hanger 2" x 1-3/4" 663 Ibs 57.6% 61.3% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF-nails, (2) Strong -Grip joist nails. Page 21 of 82 • Boise Cascade= Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW(U55) (Floor Joist) BC CALC@ Member Report Dry 11 span I No cant. 124 OCS Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ .... _... ...... ...._ _ . _ ____ ..._ _. _ ... File.name: N362326L&R.mmdl _ .. Address: Description: 1st Floor\Floor Joists\J2(i755) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. . Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC@ analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 22 of 82 • } Boise Cascade -- - Single 16" BCIO 4500s-1.8 BC CALC® Member Report Build 7493 Job name: Address: 1st FloorTloor JoistslJ2(1759) (Floor Joist) Dry I 1 span No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 name__ ._ N362326L&R.mmdl Description: 1st Floor\Floor Joists\J2(i759) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 0 131 15-04-14 Total Horizontal Product Length = 15-04-14 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 621 /0 155/0 B2,2" 610/0 152/0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location ...-Pos. Moment 2824 ft-Ibs ___ _ ., _ 9.0% 100% .. 1 .....: 47-09-08 _.. End Reaction 762 Ibs 70.5% 100% 1 15-04-14 End Shear 745 Ibs 37.7% 100% 1 00-04-00 Hole #1 Shear 354 Ibs 64.5% 100% 3 04-09-08 Hole #2 Shear 361 Ibs 65.8% 100% 4 10-10-08 Total Load Deflection U915 (0.197") 39.3% n\a 1 07-09-08 Live Load Deflection L/1144 (0.158") 42.0% n\a 6 07-09-08 Max Defl. 0.197" 19.7% n\a 1 07-09-08 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-09-08 8" L 12" Circular Horizontal H02 10-10-08 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 776 Ibs 12.7% 52.6% Unspecified 62 Hanger 2" x 1-3/4" 762 Ibs 66.3% 70.5% ITS1.81/16 Cautions Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 23 of 82 Bose cascade fflffEg , Single 16" BCI® 4500s-1.8 1st FloorTloor JoistsW2(1759) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job_name: _,_.__._._.__ ....._...__. _.__._..______._ __.__.File name: N362326L&R.mmdl _ _... . Address: Description: 1st Floor\Floor Joists\J2(i759) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC), BC FRAMER@ , AJS-, ALLJOIST@ , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM), VERSA -RIM PLUSO , Page 24 of 82 Boise cascade - Single 16" BCI® 4500s-1.8 P�S�EI 1st Floor\Floor Joists\J3(i737) (Floor Joist) BC CALCO Member Report Dry 1 span No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job -name: _ .... _ _ _ __._ ... File name: N362326L&R.mmdl,-- Address: Description: 1st Floor\Floor Joists\J3(i737) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 15-01-06 Total Horizontal Product Length=15-01-06 62 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,2" 566/0 142/0 B2, 2" 572 / 0 143 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 15-01-06 Top 36 9 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2629 ft-lbs 64.3% 100% 1 07-06-08 End Reaction 715 lbs 66.2% 100% 1 15-01-06 End Shear 700 lbs 35.4% 100% 1 00-02-00 Hole #1 Shear 338 lbs 61.7% 100% 3 04-06-00 Hole #2 Shear 336 lbs 61.3% 100% 4 10-07-00 Total Load Deflection U989 (0.181 ") 36.4% n\a 1 07-06-08 Live Load Deflection U1236 (0.145") 38.8% n\a 6 07-06-08 Max Defl. 0.181" 18.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lx" Value Support Member Material B1 Hanger 2" x 1-3/4" 708 lbs 42.5% 65.5% IUS1.81/16 B2 Hanger 2" x 1-3/4" 715 lbs 62.2% 66.2% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 25 of 82 Boise cascade -- Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW3(i737) (Floor Joist) BC CALCO Member Report Dry 1 span No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ ._ __ _._. _._._..... _..File. name:_. N362326L&R.mmdl _. Address: Description: 1st Floor\Floor Joists\J3(i737) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 26 of 82 • Boise Cascade Single 16" BCI® 4500s-1.8 BC CALC® Member Report Build 7493 Job -name: -__._.-... Address: City, State, Zip: Customer: 1st Floor\Floor JoistsW3(i742) (Floor Joist) Dry I 1 span No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 _...._.._._.__.._ _.__._-.... .. _ -.File-name:.- N362326L&R.mmdl Description: 1 st-Floor\Floor Joists\J3(i742) Specifier: Designer: Code reports: ESR-1336 Company: 131 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value ' % Allowable Duration Case Location -, Pos. Moment .:. -2777 ft-lba _,..._ ._, 67.9% 100% 4­_ --07-06-08-.:-- - - -- -_.. End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 lbs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 14/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 27 of 82 Boise Cascade MOM Single 16" BCI® 4500s-1.8 1st Flooffloor JoistslJ3(i742) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job.name:,. _....__._.._....__...File.name:....... N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 28 of 82 • SBoise cascade M�2 Single 16" BCI® 4500s-1.8 PASSED .11 1 st FloorlFloor JoistsW(UQ) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: ___ .. _File name: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 0 131 15-01-06 Total Horizontal Product Length = 15-01-06 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605/0 151 /0 132 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos.,Momant - 2777 ft-Ibs. -. .... :.67.9%<,,.. _...._ . , . 100% 1 -•-07-06-08--.r,...._... . _ _...-... ... _. ..: End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1�/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 29 of 82 813olse cascade MEE Single 16" BCI® 4500s-1.8 1st FiloorTloor JoistsU3(1742) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span, I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: __...---......--- - File name: N362326L&R.mmdl.._.., _ ._..... _---- Address: Description: 1st Floor\Floor Joists\J3(i742). City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 30 of 82 Boise Cascade= Single 16" BCIO 4500s-1.8 1st FloorTloor JoistsW(U42) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: __...._ _..___.__. _....._....___ -File. name: ... _ N362326L&R-mmdl Address: Description: 1,st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 1777.ftv!bs 67.9% 100°Xu ,- :. 1 07-06-08 . End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 31 of 82 .� .Boise Cascade Single 16" BCl® 4500s-1.8 1st Flooffloor JoistsW3(i742) - 02 (Floor Joist) BC CALC@ Member Report Dry 11 span,] No cant. 124 OCS Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _..___. _._._..._ _...__..,._...._....,._ _.. .._._. _......._....... File name:_. N362326L&R,mmdl Address: Description: 1 st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC@ analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJST°", ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUSO , Page 32 of 82 Boise cascade - Single 16" BCI® 4500s-1.8 1st FloorTloor JoistslJ3(i742) - 03 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:.. _.. _ ..,_._... _ ..__ __ ._.. __._ .-File name:....._...N362326L&R.mmdl _...._ Address: Description: 1st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 15-01-06 B1 B2 Total Horizontal Product Length = 15-01-06 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90%" 115% 160%" 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos i". oment _ -.2777 ft-Ibs - . 67:9% .:: 100% . ,. _ _ _....1 — ._•-0>7..Q6-O&,__ __.:...:. ....... End Reaction 756'lbs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 lbs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 33 of 82 Y 1 Boise cascade Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistsW3(U42) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name._ _ .. .. _. ... _ ____.___-.File..name:_... N362326L&R mmdl Address: Description: 1st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (I") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM), VERSA -RIM PLUS@ , Page 34 of 82 J � Boise Cascade ` Single 16" BCIO 4500s-1.8 BC CALC® Member Report Build 7493 Job name: _ Address: City, State, Zip: Customer: 1st Flooffloor JoistslJ3(i742) - 04 (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 __-• . -. _..____•_. ., . _ __.-.--File name: N362326L&R.mmdl_. ..-- . ___ ....._..._.. Description: 1st Floor\Floor Joists\J3(i742) Specifier: Designer: Code reports: ESR-1336 Company: B1 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Post. Moment.. _ ..- _. , , -2777 ft-Ibs_ 67.9% -<: - -100%,_..._:. - .. 1 .a7-06-0€3- . ....,_ End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") ' 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger [US1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 35 of 82 Boise Cascade Single 16" BCI® 4500s-1.8 1st Flooffloor JoistslJ3(1742) - 04 (Floor Joist) BC CALCO Member Report Dry 11 span) No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _. . _ _ _ _._...._.._.__...__.. _.v_ ._File..name:........ N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying,on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 36 of 82 RIME Boise Cascade Single 16" BCI® 4500s-1.8 �ASS�D 1st FloorTloor JoistslJ3(i742) - 05 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ . __.. _..... ----- . _._ _.... - File name: _. N362326L&R.mmdl . Address: Description: 1 st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) ' L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location —•-Pos:-Moment -----277-7-ft-Ibs._-=:�._,..,..--•67:9%. ._ 100% 1-•-- 07 Q&08-.-_ ..---,-. ,v _.... End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4' 756 Ibs 45.4°% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/1.6 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 37 of 82 Boise cascade Single 16" BCI® 4500s-1.8 1st Ilooffloor JoistsW3(i742) - 05 (Floor Joist) BC CALCO Member Report Dry 11 span' I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job_ name:. File name: - N362326L&R.mmdl. Address: Description: 1 st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer, Designer: Code reports: ESR-1336 Company: Notes ' - Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load ,deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAME), VERSA -RIM PLUS@ , Page 38 of 82 + Boise Cascade Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7493 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st FI'oorTloor JoistsW(U42) - 06 (Floor Joist) Dry 11 span No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 ---_._.____...._....._......_.__File.name... ... N362326L&R.mmdl Description: 1st Floor\Floor Joists\J3(i742) Specifier: Designer: Company: 15-01-06 Total Horizontal Product Length=15-01-06 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605/0 151 /0 B2 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a 11 Controls Summary Value % Allowable Duration Case Location Pos. Moment 27.77ft-Ibs__ - 67.90/0 .._ ...:.. 100%._ -- 1 07-06-08—..__...,.,.. End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires.(14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 39 of 82 Boise Cascade E= Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW(U42) - 06 (Floor Joist) BC CALCO Member Report Dry 11 span lilt No cant. 124 OCS Non -Repetitive Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ .. _.__....._...._.........._... ,..... - _... . - - __......-.._..__File-name_- ....N362326L&R.mmdl - .._....__...._... .. _ :.- Address: Description: 1 st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. li BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValueO , VERSA -LAM@, VERSA -RIM PLUS@ , Page 40 of 82 Boise Cascade Single 16" BCI® 4500s-1.8 BC CALC® Member Report Build 7493 _Job name:.- . . Address: City, State, Zip: Customer: 1st Floor\Floor JoistslJ3(i742) - 07 (Floor Joist) Dry 11 span.1 No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 N362326L&R.mmdl _. Description: 1st Floor\Floor Joists\J3(i742) Specifier: Designer: Code reports: ESR-1336 Company: B1 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location ­--Pos. Moment — •2777-ft••lbs.:._ _:._. , ..p-67.9% End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10=07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 41 of 82 Boise cascade - Single 16" BCI® 4500s-1.8 PAS a S 1st Flooffloor JoistsU3(i742) - 07 (Floor Joist) BC CALCO Member Report Dry 1 span No cant. 124 OCS Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job. name: _- __..._.......,.._ ......__..__ _._....__.._......._.. Filename:. N362326L&R.mmdl.-- Address: Description: 1 st Floor\Floor JoistsW(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the. terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValueO , VERSA-LAMO, VERSA -RIM PLUS@ , Page 42 of 82 Boise Cascade MEEN Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistslJ3(i742) - 08 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 _ _Job name: .. ,. _ . __._.... .. _-.._ File. name: N362326L&R.mmdl . Address: Description: 1st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 15-01-06 B1 B2 Total Horizontal Product Length = 15-01-06 Reaction Summary (Down ./ Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 605/0 151 /0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos.-Moment... -.,.2777ft-Ibs o -67.9/0--•.. = :100% End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04=06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular . Horizontal . % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 Cautions Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 43 of 82 Boise cascade - Single 16" BCI® 4500s-1.8 1st FloorlFloor Joists\J3(i742) - 08 (Floor Joist) BC CALCO Member Report Dry 11 span 11 No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:. File. name: N362326L&R.mmdl _ Address: Description: 1st Floor\Floor Joists\J3(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and 'applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 44 of 82 • Boise Cascade — Single 16" BCI® 4500s-1.8 i�ASSED 1 st FloorTloor JoistslJ4(i767) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 24 OCS I Repetitive Glued & nailed February 11; 2021 12:28:44 Build 7493 Job name: File name: N362326L&R.mmdl-- Address: Description: 1st Floor\Floor Joists\J4(i767) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: , 0 B1 15-11-05 Total Horizontal Product Length = 15-11-05 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 568/0 142/0 B2, 2" 568 / 0 14210 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-11-05 Top 71 18 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment — :-:•27v? ft-Ibs .... - . 67.4% 100%---,, - „ .._ 1 07-11--02 _,._ ... - — - :— , :K. ---• -. _. --.... . End Reaction 710 Ibs 65.7% 100% 1 00-00-00 End Shear 696 Ibs 35.2% 100% 1 00-02-00 Hole #1 Shear 448 Ibs 81.6% 100% 3 03-02-05 Hole #2 Shear 388 Ibs 70.8% 100% 4 11-11-05 Total Load Deflection U907 (0.208") 39.7% n\a 1 07-11-02 Live Load Deflection U1134 (0.167") 42.3% n\a 6 07-11-02 Max Defl. 0.208" 20.8% n\a 1 07-11-02 Span / Depth 11.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 03-02-05 8" L 12" Circular Horizontal H02 11-11-05 8" •L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 710 Ibs 52.2% 65.7% IUS1.81/16 B2 Hanger 2" x 1-3/4" 710 Ibs 61.8% 65.7% ITS1.81/16 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 45 of 82 e Boise cascade - Single 16" BCI® 4500s-1.8 1st; Flooffloor JoistsW4(i767) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: . _ ______..__.._....__ __File name:.:._.....N362-326L&R.mmdl ... Address: Description: 1 st Floor\Floor Joists\J4(i767) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValueO , VERSA-LAMO, VERSA -RIM PLUSO , Page 46 of 82 6Boise cascade E99E Single 16" BCIO 4500s-1.8 1st FloorTloor Joists\J5(i741) (Floor Joist) BC CALCO Member Report Dry 1 span I No cant. 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: ___.__ _._....__._.-....... _..._......,__.__._.,.__...._.__..._F.ile_name: N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J5(i741) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 15-03-02 Total Horizontal Product Length = 15-03-02 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 505/0 126/0 B2, 2" 505 / 0 126 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-03-02 Top 66 17 n\a Controls Summary Value % Allowable Duration Case Location - :Pos;-Moment_ 2343.ft.-Ibs- ....._...-._..,,67:3%- -_ .100% 1 ._...... ,.... End Reaction 631 Ibs 58.4% 100% 1 00-00-00 End Shear 618 Ibs 31.3% 100% 1 00-02-00 Hole #1 Shear 292 Ibs 53.3% 100% 3 04-07-12 Hole #2 Shear 300 Ibs 54.6% 100% 4 10-08-12 Total Load Deflection L/1102 (0.164") 32.7% n\a 1 07-07-12 Live Load Deflection L/1377 (0.131 ") 34.9% n\a 6 07-07-12 Max Defl. 0.164" 16.4% n\a 1 07-07-12 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-07-12 8" L 12" Circular Horizontal H02 10-08-12 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 631'lbs 46.4% 58.4% IUS1.81/16 B2 Hanger 2" x 1-3/4" 631'lbs 54.9% 58.4% ITS1.81/16 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 47 of 82 . Boise cascade Single 16" BCI® 4500s-1.8 1st',Flooffloor JoistsW5(i741) (Floor Joist) BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:. _.__ ___ _._ .__._ . _ _.. _ File name: . N362326L&R.mmdL. Address: Description: 1st Floor\Floor Joists\J5(i741) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC@ analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified -by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 48 of 82 03-01-11 1311 B2 Total Horizontal Product Length = 03-01-11 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live 131,2" 171/0 42/0 132, 9-3/4" 376 / 0 93 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 03-01-11 Top 4 1 n\a 2 J6(i785) Conc. Pt. (Ibs) L 00-07-02 00-07-02 Top 26 6 n\a 3 - J5(i741) .__-_..,.._ _,_-_ronc. Pt. (Ibs) __ --L-..-.,--01••08-.13_- O't--08-1,3 . Top, 510 .127.. , _ ..,..__,,..,...n\a •-- - Controls Summary Value %Allowable Duration Case Location Pos. Moment 305 ft-Ibs 7.5% 100% 1 01-08-13 End Reaction 469 Ibs 31.8% 100% 1 03-01-11 End Shear 466 Ibs 23.6% 100% 1 02-03-15 Total Load Deflection L/999 (0.003") n\a n\a 1 01-08-13 Live Load Deflection U999 (0.003") n\a n\a 2 01-08-13 Max Defl. 0.003" n\a n\a 1 01-08-13 Span / Depth 1.7 % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Hanger 2" x 1-3/4" 213:Ibs 12.8% 19.7% IUS1.81/16 B2 _ Wall/Plate 9-3/4" x 1-3/4" 469 Ibs 3.1 % - 31.8% Unspecified Cautions Disclosure Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Notes Completeness and accuracy of input must be reviewed and verified by a Design meets User specified (L/360) Total load deflection criteria. qualified engineer or other appropriate Design meets User specified (L/480) Live load deflection criteria. expert to assure its adequacy, prior to Design meets arbitrary (1") Maximum Total load deflection criteria. anyone relying on such output as Design meets arbitrary (0.75") Maximum live load deflection criteria. evidence of suitability for a particular application. The output here is based on Calculations assume member is fully braced. building code -accepted design Hanger Manufacturer: Simpson Strong -Tie, Inc. properties and analysis methods. BC CALCO analysis is based on IBC 2009. Installation of Boise Cascade engineered wood products must in ComComposite El value based on 3/4" thick OSB sheathing glued and nailed to member. P 9 9 on accordance with current Installation Design based on Dry Service Condition. Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 49 of 82 + Boise Cascade Single 16" BCI® 4500s-1.8� 1st FloorlFloor JoistSU6(i771) (Floor Joist) BC CALC® Member Report Dry 11 span •I No cant. 1.24 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: ____...___.._.__....__.._._.......__._.__- _.._._.....___ ._... File name: N362326L&R.mmdl Address: Description:. 1 st Floor\Floor Joists\J6(i771) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 03-04-03 Total Horizontal Product Length = 03-04-03 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 310/0 76/0 B2, 2" 269 / 0 67' / 0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 J4(i767) Conc. Pt. (Ibs) L 01-06-13 01-06-13 Top 579 145 n\a Controls Summary Value % Allowable Duration Case Location _ .Pos. Moment---.=- _ -565ft _ _ .:...,_1.3.8% 100%. _: _,_ �._:._. 1; _ ,...,01-06-:12_,.,... _ . ...._., __ .��,,_.,._ _. __.. -. End Reaction 387 Ibs 35.8% 100% 1 1 00-00-00 End Shear 387 Ibs 19.6% 100% 1 00-02-00 Total Load Deflection U999 (0.007') n\a n\a 1 01-06-12 Live Load Deflection U999 (0.005') n\a n\a 2 01-06-12 Max Defl. 0.007" n\a n\a 1 01-06-12 Span / Depth 2.4 % Allow % Allow Bearing Supports Dim. (LxM Value Support Member Material 131 Hanger 2" x 1-3/4" 387. Ibs 28.5% 35.8% IUS1.81/16 B2 Hanger 2" x 1-3/4" 337 Ibs 20.2% 31.2% IUS1.81/16 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam. Disclosureof Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. se Use of the Boise Cascade Software is subject to the terms of the End User Notes License Agreement (EULA). n meets Users specified L/360 Total load deflection criteria. Design p ( ) Completeness and accuracy of input must he reviewed and verified by a Design meets User specified (L/480) Live load deflection criteria. qualified engineer or other appropriate Design meets arbitrary (1") Maximum Total load deflection criteria. expert to assure its adequacy, prior to Design meets arbitrary (0.75") Maximum live load deflection criteria. anyone relying on such output as evidence of suitability fora particular Calculations assume member is full braced. Y application. The output here is based on Hanger Manufacturer: Simpson Strong -Tie, Inc. building code -accepted design BC CALCO analysis is based on IBC 2009. properties and analysis methods. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Installation of Boise Cascade engineered wood products must be in Design based on Dry Service Condition. accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 50 of 82 Boise Cascade - Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7493 -Job name: _ ....... _ Address: City, State, Zip: Customer: 1st Floor\Floor JoistslJ6(i785) (Floor Joist) Dry 11 span;1 No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 File name:.-.- - ... N362326L&R.mmdl. . Description: 1 st Floor\Floor Joists\J6(i785) Specifier: Designer: Code reports: ESR-1336 Company: B1 03-08-03 Total Horizontal Product Length = 03-08-03 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,4" 25/0 6/0 B2, 2" 27 / 0 7/0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-04-00 03-08-00 Top 15 4 n\a 2 FC1 Floor Material Conc. Pt. (Ibs) L 00-03-00 00-03-00 Top 1 n\a Controis:.Summary Valuer 0dirAllowable-. . ._..-Duration--, -----Y Case ,<,-.Location,- _,..,,.__ ._. __....-_—_. •.,- .».. _ Pos. Moment 26 ft-Ibs 0.6% 100% 1 01-11-01 End Reaction 33 Ibs 3.1 % 100% 1 03-08-03 End Shear 30 Ibs 1.5% 100% 1 00-04-00 Total Load Deflection U999 (0") n\a n\a 1 01-11-01 Live Load Deflection U999 (0") n\a n\a 2 01-11-01 Max Defl. 0" n\a n\a 1 01-11-01 Span / Depth 2.5 % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 31 Ibs 0.5% 2.1 % Unspecified B2 Hanger 2" x 1-3/4" 33 Ibs 2.4%' 3.1% IUS1.81/16 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAMTm, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 51 of 82 l Boise Cascade Single 16" BCIO 6000s-1.8 BC CALCO Member Report Build 7493' Job name: Address: City, State, Zip: Customer: 1st FloorTloor•JoistsW(i774) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 . Filename: _ _ N362326L&R.mmdl Description: 1st Floor\Floor Joists\J7(i774) Specifier: Designer: Code reports: ESR-1336 Company: B1 20-01-00 Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 677/0 169/0 B2, 4" 692 / 0 173 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 03-09-00 Top 26 6 n\a y..3_ .., FG1,Floor ,Material -.._ . Top : 29:,... �_7_.,.,, .. - a — - _ ... ,. _ ._.:.�• - - 1a —n-. . Controls Summary Value % Allowable Duration Case Location Pos. Moment 4180ft-Ibs 76.1% 100% 1 09-11-06 End Reaction 846 Ibs ' 66.7% 100% 1 00-00-00 End Shear 844 Ibs 38.8% 100% 1 19-09-00 Hole #1 Shear 471 Ibs 77.9% 100% 3 05-00-00 Hole #2 Shear 172 Ibs 28.5% 100% 4 10-00-04 Hole #3 Shear 474 Ibs 78.4% 100% 6 14-11-14 Total Load Deflection U608 (0.389") 59.2% n\a 1 09-11-06 Live Load Deflection U760 (0.311") 63.2% n\a 8 09-11-06 Max Defl. 0.389" 38.9% n\a 1 09-11-06 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow %" Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 846 Ibs 73.6% 66.7% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 865 Ibs 10.7% 55.8% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 52 of 82 %Boise Cascade 91992 Single 16" BCI® 6000s-1.8 1 st Floor\Floor JoistslJ7(1774) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: __ . _ .. Filename: . N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i774) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (U360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM), VERSA -RIM PLUS@ , Page 53 of 82 SBoise Cascade BC CALC® Member Report Build 7493 Single 16" BCI® 6000s-1.8 1st Flooffloor JoistsW(U75) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Job name: _ . _,.__,-._.._._. -._File.. name: .... N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i775) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 20-01-00 Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof oCS Live Tag Description Load Type Ref. Start End Loc. i00% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment - - - g54 ft lbs. - :...., 88.3%- . • - _..,w :.400°lam=, ..,._. ._.,: •-1 .,_....09-11-08 - . ,. __ ..r_ _ —�.— - : • _ : .. . End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs ' 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 133.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs . 91.1% 100% 6 14-11-14 Total Load Deflection U523 (0.452") , 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" ' 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" -Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxM Value Support Member Material B1 Hanger 2" x 2-5/16" 996:Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 54 of 82 1 - Boise cascade � Single 16" BCI® 6000s-1.8 1st, Flooffloor JoistsW(i775) (Floor Joist) BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _... _...._.- _ .. _..---._.r........__-. _...- _-- -._ _. File name:. . N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i775) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 55 of 82 Single 16" BCI® 6000s-1.8 0 IME Boise Cascade 5 BC CALCO Member Report Build 7493 -.-Job name:. Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st FloorlFloor JoistslJ7(i775) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed __...... _ _...File name:.. Description: Specifier: Designer: Company: 20-01-00 February 11, 2021 12:28:44 N362326L&R. mmdl 1 st Floor\Floor Joists\J7(i775) Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow -Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value j % Allowable Duration Case Location ..:_ Pos•..Moment 4854-ft-Ibs :,. .-.-,88.3oXs_-- - ,_:.. 100% End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1% 100% . 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 H03 10-00-04 8" L 12" 14-11-14 8" L 12" Circular Horizontal Circular 'Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996,Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 56 of 82 Boise Cascade MEN Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7493 Job name: - Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes - 1st Floor\Floor Joists;W(i775) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 _. ___...____......___.__.._._....._____.._File. name: N362326L&R.mmdl �..-.._--... Description: 1st Floor\Floor Joists\J7(i775) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified. (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert -to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@) , AJS- ALLJOISTO , BC RIM BOARD-, BCI(D, BOISE GLULAM-, BC FloorValueO , VERSA -LAM), VERSA -RIM PLUS@ , Page 57 of 82 Boise Cascade Single 16" BCIO 6000s-1.8 IASSEI 1st Floor\Floor Joists\J7(i775) - 02 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:.- ._.. .... ,...._. __..._. _.. _._... -.. _ . ___.. _ __File name:.. N362326L&R_mmdl. _ Address: Description: 1st Floor\Floor Joists\J7(i775) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 61 20-01-00 62 Total Horizontal Product Length = 20-01-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos.-Moment .. _..:,,.,-V-= --4854•ft-Ibs 88.3% . - . 1 . -- 09 1-4-08=•--___- .-.- --l_, .__ ._. ,._:.___ ... . End Reaction 996 lbs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1% 100% 6 14-11-14 .Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lx" Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 58 of 82 • Boise cascade Single 16" BCI® 6000s-1.8 PSG 1st FloorTloor JoistsW(i775) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i775) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAMT"', BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 59 of 82 Boise cascade ' Single 16" BCI® 6000s-1.8 1st Floor\Floor Joists\J7(U75) - 03 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _.._. _ ..._.___._......... . .... _. _. __ __ __..._._._ . __ File name: N362326L&R.mmdl Address: Description: list Floor\Floor Joists\J7(i775) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 1 23 B1 20-01-00 Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos: Moment - -.- �,8F4.ft._lbs-.88:3% _.- 100% .1 .. - G41.1-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 lbs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 60 of 82 • Boise Cascade Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7493 _Job name:... _ Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st Flooffloor JoistslJ7(i775) - 03 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 _._File name:. _ . N362326L&R.mmdl _ Description: 1st Fioor\Floor Joists\J7(i775) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (1-/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 61 of 82 Boise Cascade Single 16" BCI® 6000s-1.8 PkS�EI� 1st FloorTloor JoistsW7(i776) (Floor Joist) BC CALC® Member Report Dry 11 span No cant. 124 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ _ .. _---....__.. _.__.._.-..__.___Eile name: ... N362326L&R.mmdl _.. Address: Description: 1st Floor\Floor Joists\J7(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 1 § 1 2 3 B1 20-02-08 Total Horizontal Product Length = 20-02-08 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live - — -- B 1, 2" 797 / 0 199 / 0 B2, 5-1/2" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment . .ft-Ibs 100% --- 1 -09-1.1-0&:-------.,., _. -._,, _.... �.-.-....... _. • -- ._..-.. . End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value' Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 5-1/2" x 2-5/16" 996 Ibs 18.4% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 62 of 82 ' e *Boise cascade Single 16" BCI® 6000s-1.8 1 st Flooffloor JoistslJ7(1776) (Floor Joist) BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ . _ _........ ....._ _.._ ......_ . _.__ ..., .. _ ._ .. _ ....__ . File. name:. .N362326L&R.mmdl .... ._.. _.. _....... Address: Description: 1st Floor\Floor Joists\J7(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC® analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and hailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified bya qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS- ALLJOISTO , BC RIM BOARDTM, BCI@), BOISE GLULAM-, BC FloorValueO , VERSA -LAM@, VERSA -RIM PLUSO , Page 63 of 82 Boise Cascade Single 16" BCIO 6000s-1.8 PA�Brh? 1st Floor\Floor Joists\J7(i776) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: __. _ _ _ _ . ___.,.File. name:_ . _.._ N362326L&R.mmdl - - Address: Description: 1st Floor\Floor Joists\J7(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 20-02-08 Total Horizontal Product Length = 20-02-08 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2" 797 / 0 199 / 0 B2, 5-1/2" 797 / 0 199 / 0 Load Summary Live Dead. Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location --Pos. Moment --4854•f:-Ibs-_-<-,---:_._.88.3% ._ - -100%,--:._- ,.., . 1---- 09-1.1-08 . End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 5-1/2" x 2-5/16" 996 Ibs 18.4% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4)-10d TF nails, (2)-Strong-Grip joist nails. Page 64 of 82 • e Boise Cascade= Single 16" BCI® 6000s-1.8 1st Flooffloor Joists\J7(1776) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ _...._._.., ......_.................._.File_name:.. N362326L&R.mmdl _ Address: Description: 1st Floor\Floor Joists\J7(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM), VERSA -RIM PLUS@ , Page 65 of 82 Boise cascade — Single 16" BCIO 6000s-1.8 PdSS� 1st FloorlFloor Joists\J7(U78) (Floor Joist) BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ _-__ _ _File name: N362326L&R..mmdl.. . Address: Description: 1 st Floor\Floor Joists\J7(i778) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 20-02-08 Total Horizontal Product Length = 20-02-08 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 5-1/2" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location ­Pos. Mornamt 4854 ft-lbs 88:3;:r, _. . End Reaction 996 lbs 78.5% 100% 1 00-00-00 End Shear 979 lbs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 lbs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 lbs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 lbs 91.1% 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member • Material B1 Hanger 2" x 2-5/16" 996 lbs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 5-1/2" x 2-5/16" 996 lbs 18.4% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 66 of 82 Boise cascade 999 Single 16" BCI® 6000s-1.8 P�SSir 1st Flooffloor JoistslR(i778) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ _ _,_.__._____ File -name:. _. N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i778) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 67 of 82 OBoise cascade Single 16" BCI® 6000s-1.8 PSSEI 1stiFloor\FloorJoistsW(U81) (Floor Joist) BC CALC® Member Report Dry 11 span No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 .Job name: _.. ... _..._._.-__ _. _. _.__- _ _ ._.._-.. __..,.....File.name: - N362326L&R.mmdl_.-... _._.- ._ _..__....... -...-_ Address: Description: 1st Floor\Floor Joists\J7(i781) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 1 1311 20-01-00 Total Horizontal Product Length = 20-01-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797/0 199/0 132 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. .100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top' 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment --> Rv4ft-Ibs:-. _ 88.3% ---100%. 11—- .1- 09-1.1-08---.... ..... ._..��,..:—...,�b_=.- �..,..... End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a' 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 68 of 82 Boise cascade - - Single 16" BCI® 6000s-1.8 PAED 1st Floor\Floor Joists\J7(i781) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 .Job. name:__ __ _ _.___._ name:-... ... N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i781) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load. deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 69 of 82 Boise Cascade E-"9 Single 16" BCI® 6000s-1.8 P�SS�I 1st Floor\Floor JoistsW7(i783) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 24 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ ._ .......____.-._.__.. __.__..._.__._.__ -..File name: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i783) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 0 B1 2a-00-08 Total Horizontal Product Length = 20-00-08 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 607 / 0 152 / 0 B2, 3-1/2" 607 / 0 152 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 61 15 n\a Controls Summary Value % Allowable Duration Case Location Pos:'Moment- .-3697-ft-Ibs-- :.-- 67.3% - 100% 1 •_ --•09-41-08--..:... - - - --- End Reaction 758 Ibs 59.8% 100% 1 00-00-00 End Shear 746 Ibs 34.3% 100% 1 00-02-00 Hole #1 Shear 415 Ibs 68.6% 100% 3 05-00-00 Hole #2 Shear 153 Ibs 25.3% 100% 4 10-00-04 Hole #3 Shear 419 Ibs 69.3% 100% 6 14-11-14 Total Load Deflection U687 (0.344") 52.4% n\a 1 09-11-08 Live Load Deflection U858 (0.275") 55.9% n\a 8 09-11-08 Max Defl. 0.344" 34.4% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00700 - 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 758 Ibs 65.9% 59.8% ITS2.37/16 B2 Wall/Plate 3-1/2" x 2-5/16" 758 Ibs 10.7% 48.9% Unspecified Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 70 of 82 Boise cascade 11Hg Single 16" BCI® 6000s-1.8 1st Floor\Floor Joists\J7(i783) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 -Job name:-. _ _ _ _.... _ _ . __ _ . _ _. _ . _._ . File name: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i783) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (U360) Total load deflection criteria. Design meets -User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 71 of 82 Boise cascade Single 16" BCI® 6000s-1.8 1st Floor\Floor Joists\J8(i751) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _ ___..._._..._.__......___File name: - .N362326L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J8(i751) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: i 19-01-00 B1 B2 Total Horizontal Product Length = 19-01-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 3-1/2" 611 / 0 153 / 0 B2, 2" 614/0 154/0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 65 16 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment _--.-35`9-ft-Ibs 64.8%--- 100%-- _ 1 .09-06-15 End Reaction 768 Ibs 60.5% 100% 1 19-01-00 End Shear 754 Ibs 34.7% 100% 1 00-03-08 Hole #1 Shear 209 Ibs 34.6% 100% 3 08-05-11 Total Load Deflection U741 (0.304") 48.6% n\a 1 09-06-15 Live Load Deflection U926 (0.243") 51.8% n\a 4 09-06-15 Max Defl. 0.304" 30.4% n\a 1 09-06-15 Span / Depth 14.1 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lx" Value Support Member Material 131 Wall/Plate 3-1/2" x 2-5/16" 764 Ibs 10.8% 49.3% Unspecified Disclosure B2 Hanger 2" x 2-5/16" 768 Ibs 66.8% 60.5% ITS2.37/16 Use of the Boise Cascade Software is subject to the terms of the End User Cautions License Agreement (EULA). Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Completeness and accuracy of input must be reviewed and verified by a Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. qualified engineer or other appropriate expert to assure its adequacy, prior to anyone anyone relying on such output as Notes of suitability for a particular Design meets User specified (L/360) Total load deflection criteria. application. The output here is based on Design meets User specified (L/480) Live load deflection criteria. building code -accepted design Design meets arbitrary (1") Maximum Total load deflection criteria. properties and analysis methods. Installation of Boise Cascade Design meets arbitrary (0.75") Maximum live load deflection criteria. engineered wood products must be in Calculations assume member is fully braced. accordance with current Installation Hanger Manufacturer: Simpson Strong -Tie, Inc. Guide and applicable building codes. To obtain Installation Guide or ask BC CALCO analysis is based on IBC 2009. questions, please call (800)232-0788 Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. before installation. Design based on Dry Service Condition. BC CALC®, BC FRAMER®, AJSTM', ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 72 of 82 � R Boise cascade - -- Single 16" BCI® 6000s-1.8 6�AS�IE1 1st Flooffloor JoistSW9(i736) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: _.._...... ............_ . _ . ._._ ---------- _ _ _. ...__.._._... _.._ . _.._Filename: N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J9(i736) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: a: 2 19-01-00 B1 B2 Total Horizontal Product Length = 19-01-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 787/0 196/0 B2, 2" 748 / 0 187 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 40 10 n\a ., ...2 .. FC1 _Floor.Material........... ..... l rnf .l..in.-(Ib/ft)... - L 00-04-00. _03708.00.,,_,T.op_.,._ .-1.5. _ _ .. 3 FC1 Floor Material Unf. Lin. (lb/ft) L 03-09-01 19-01-00 Top 37 9 n\a 4 J6(i746) Cone. Pt. (Ibs) L 03-09-01 03-09-01 Top 166 41 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4472 ft-Ibs 81.4% 100% 1 09-03-08 End Reaction 935 Ibs .73.7% 100% 1 19-01-00 End Shear 975 Ibs 44.8% 100% 1 00-04-00 Hole #1 Shear 242 Ibs 40.1 % 100% 3 08-05-11 Hole #2 Shear 542 Ibs 89.7% 100% 4 14-06-11 Total Load Deflection U587 (0.382") 61.3% n\a 1 09-06-05 Live Load Deflection U734 (0.306") 65.4% n\a 6 09-06-05 Max Defl. 0.382" 38.2% n\a 1 09-06-05 Span / Depth 14.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lx" Value Support Member Material B1 Wall/Plate 4" x 2-5/16" 983 Ibs 12.1 % 63.4% Unspecified B2 Hanger 2" x 2-5/16" 935 Ibs 81.3% 73.7% ITS2.37/16 Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 73 of 82 aBolse cascade — Single 16" BCl® 6000s-1.8 1st Floor\Floor JoistSW9(1736) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job. name: _._..__ . _.__ _.._._ ____..._____..File name:._ ....N362326L&R.mmdL. Address: Description: 1st Floor\Floor Joists\J9(i736) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 74 of 82 e , Boise Cascade— Single 16" BCI® 6000s-1.8 �AB�EI 1St. Floor\Floor JoistsW9(1749) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job.name: __.___.._ ..__._----_--_-..,_..._._. ,.. ___..._-----_..______ .._File.name:_ N362326L&R.mmdl__.-•...... . ...... . Address: Description: 1st Floor\Floor Joists\J9(i749) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 0 _s B1 1s-01-00 Total Horizontal Product Length = 19-01-00 132 Reaction Summary (Down /Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 5-1/2" 762 / 0 190 / 0 B2, 2" 752 / 0 188 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location -Pos.Mement:---- - 4318,ft-Ibs._.--. 100% 1 - -­09-0&04_­_.,_..- ... End Reaction 940lbs 74.1% 100% 1 19-01-00 End Shear 923 Ibs 42.4% 100% 1 00-05-08 Hole #1 Shear 262 Ibs 43.4% 100% 3 08-05-11 Hole #2 Shear 529 Ibs 87.5% 100% 4 14-06-11 Total Load Deflection U615 (0.363") 58.5% n\a 1 09-08-04 Live Load Deflection U769 (0.29") 62.4% n\a 6 09-08-04 Max Defl. 0.363" 36.3% n\a 1 09-08-04 Span /,Depth 13.9 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 5-1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37/16 Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 75 of 82 e 4 Boise Cascade _-- Single 16" BCI® 6000s-1.8 BC CALC® Member Report Build 7493 1st Flooffloor Joists\J9(i749) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Job -name:.. _ __..__ _.. _. ...._ .. _._.._ ._File. name:_ _ . N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J9(i749) City, State, Zip: Specifier: Customer: Designer:. Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC® analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 76 of 82 Boise cascade Single 16" BCI® 6000s-1.8 P�SS�E 1st FloorTloor JoistSXJ9(i749) - 01 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 ..Job name: _..._.. _ . _.. __._._,_._._..____.___File name:_.. N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J9(i749) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 19-01-00 Total Horizontal Product Length = 19-01-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 5-1/2" 762 / 0 190 / 0 B2, 2" 752 / 0 188 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115%" 160% 125%" 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment -- - •-- 4318.ftdbs - 78.6%---_-. -- 100%--- - --- . 1 09-08-04 _:--._: . . End Reaction 940 Ibs 74.1% 100% 1 19-01-00 End Shear 923 Ibs 42.4% 100% 1 00-05-08 Hole #1 Shear 262 Ibs 43.4% 100% 3 08-05-11 Hole #2 Shear 529 Ibs 87.5% 100% 4 14-06-11 Total Load Deflection U615 (0.363") 58.5% n\a 1 09-08-04 Live Load Deflection U769 (0.29") 62.4% n\a 6 09-08-04 Max Defl. 0.363" 36.3% n\a 1 09-08-04 Span / Depth 13.9 Hole Location Valid Hole Summary Center • Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal- H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LXM Value Support Member Material B1 Wall/Plate 5-1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37116 Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 77 of 82 6Boise cascade Single 16" BCI® 6000s-1.8 1st Flooffloor JoistsW(U49) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name:_ _...._..._. ..... _.__._....__ _ -.File-name:. _.. N362326L&R_mmdl. _..._ . Address: Description: 1st Floor\Floor Joists\J9(i749) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@), BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 78 of 82 Boise cascade MEE Single 16" BCI® 6000s-1.8 1st FloorlFloor JoistslJ9(i749) - 02 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job. name:.- _.. ___.. ----- ___ _.. _. File.name:.._ N362326L&R.mmdl_.. Address: Description: 1 st Floor\Floor Joists\J9(i749) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 19-01-00 Total Horizontal Product Length=19-01-00 . B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 5-1/2" 762 / 0 150 / 0 B2, 2" 752 / 0 188 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location - t?•cs. Moment 4318 ft-Ibs- . 78•.6"/0... 100% . _ .. _ ... .. 1 - •....,'J,9-08-04-._. __ . :-..._ ..... ,...,:.-.... End Reaction 940 Ibs 74.1% 100% 1 19-01-00 End Shear 923 Ibs 42.4% 100% 1 00-05-08 Hole #1 Shear 262 Ibs 43.4% 100% 3 08-05-11 Hole #2 Shear 529 Ibs 87.5% 100% 4 14-06-11 Total Load Deflection U615 (0.363") 58.5% n\a 1 09-08-04 Live Load Deflection U769 (0.29") 62.4% n\a 6 09-08-04 Max Defl. 0.363" 36.3% n\a 1 09-08-04 Span / Depth 13.9 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 .8". L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 5-1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37/16 Cautions Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 79 of 82 J A 613oise Cascade Single 16" BCI® 6000s-1.8 1st Flooffloor JoistskA(U49) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44 Build 7493 Job name: ___... __._.._. _...._ _ _.---....._....___...._ _-_--..Fila.name: _ N362326L&R.mmdl Address: Description: 1st Floor\Floor Joists\J9(i749) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (1-/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 80 of 82 @Boise cascade Double 1-3/4" X 16" VERSA -LAM® 2.0 3100 SP PASSED 1st Floor\Flush BeamslBM1(i744) (Flush Beam) BC CALCO Member Report Dry 11 span I No cant. February 11, 2021 12:28:44 Build 7493 Job name: --_.--._._.--_-_-._.. _- -._.. _ __._ _..----_File.name:._ . _ N362326L&R.mmdl Address: Description: 1st Floor\Flush Beams\BM1(i744) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1040 Company: 20-01-02 B1 B2 Total Horizontal Product Length = 20-01-02 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 7" 3879 / 0 1136 / 0 B2, 2" 3187 / 0 957 / 0 Load Summary Live Dead Snow Wind Roof Tributary Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% ' 125% 0 Self -Weight_ _ __ Unf. Lin..(lb/ft) L - _--00-00-00_- 20-01-02 Top _ 161. 00-00-00 1 Smoothed Load Unf. Lin. (lb/ft) L 00-00-00 17-03-11 Top 320 80 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 03-09-01 20-01-02 Top 39 10 n\a 3 J6(i771) Conc. Pt. (Ibs) L 03-09-15 03-09-15 Top 271 68 n\a 4 J3(i737) Conc. Pt. (Ibs) L 18-03-11 18-03-11 Top 575 144 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 21796 ft-Ibs 58.3% 100% 1 10-03-11 End Shear 4199 Ibs 39.5% 100% 1 01-11-00 Total Load Deflection 1_/377 (0.62") 63.7% n\a 1 10-03-10 Live Load Deflection U488 (0.479") 73.7% n\a 2 10-03-10 Max Defl. 0.62" 62.0% n\a 1 10-03-10 Span / Depth 14.6 % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 7" x 3-1/2" 5015 Ibs 23.4% 27.3% Unspecified B2 Hanger 2" x 3-1/2" 4144 Ibs n\a 78.9% Hanger Cautions Hanger model Hanger was not found. Hanger has not been analyzed for adequate capacity. Notes Design meets Code minimum (L/240) Total load deflection criteria. Design meets Code minimum (L/360) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Unassigned BC CALC® analysis is based on IBC 2009. Design based on Dry Service Condition. Page 81 of 82 6 Boise Cascade Double 1-3/4" X 16" VERSA -LAM® 2.0 3100 SP ��EI 1st FloorTlush Beams\BM1(i744) (Flush Beam) BC CALCO Member Report Dry 11 span I No cant. February 11, 2021 12:28:44 Build 7493 Job name: __ ... _ _..._ __....._..__.File.name: ....._N362326L&R.mmdl Address: Description: 1st Floor\Flush Beams\BM1(i744) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1040 Company: Connection Diagram: Full Length of Member .crl b d —•-t a c a a minimum = 2" c = 6" b minimum = 3" d = 24" Calculated Side Load = 385.0 Ib/ft Connectors are: 16d Common Nails Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAME), VERSA -RIM PLUS@ , Page 82 of 82 (MBoise -En-Onee Cascade ed-Wood Products - Alternative Power ar n Nailin Multiple P.IV 1 3/4" Wide VERSA -LAMS' Beams When using multiple ply 1 3/a" VERSA -LAM® beams to create a wider member, the connection of the plies is as critical as determining the beam size. When side loaded beams are not connected properly, the inside plies do not support their share of the load and thus the load carrying capacity of the full member decreases significantly.. BC CALL® reports show a connection detail for connecting multiple ply 1 3/a" VERSA -LAM® beams. BC CALL® reports will either show the member having no side loads or the calculated side load. When the nails shown on the connection detail are not readily available on the job site, the following table may be used to substitute power driven nails or hand driven nails. I Example: Connection detail on the BC CALC® report shows 16d sinker nails at 12 o.c. As an alternative, 3" x 0.131" power driven nails can be used at 8" o.c. or 16d common nails can be used at 14" o.c. As Shown on BC Power Driven Nails Hand Driven Nails CAL& Report CO 00 CO ,— N O CNO E 00 a)x - CM T o� T- 07 Nail o �o �o V �� -0 �O X U x - x �C� - x NCO ; m- to ; O c� CO CO co T M T_ CO CO 24„ 24,E 20„ 16" 12". 24„ 20,E 16" 16d Common 12 12 10 8 6 12 10 8 3 1/2" x 0.162„ 6 � 6 N/A N/A N/A 6 N/A N/A 24" 24" 1 24" 18" 16" 24" 24" 1 20" 16d Sinker 12" 14" 12" 8" 8" 14" 12" 10" 3 1/4 " x 0.148" 6" 6" 6" N/A N/A 6" 6" N/A 24" 24" 24" 22" 18" 24" 24" 24" 16d Box 12" 16" 12" 10" 8" 16" 12" 12" 3 1/2" x 0.135" 6" 8" 6" N/A N/A 8" 6" 6" RIRMM Alternate On -Center Spacing Notes: • For multiple ply 1 3/a" VERSA -LAM° beams with only top load,, beam may be fastened at 24" o.c. for all nails shown above (top mounted hangers shall be analyzed as side loads). • Use end distance, edge distance, row spacing and number of rows shown on connection detail found on BC CALC® Report. • Alternate nailing not available for all nail types. • Contact professional of record for connection design of side -loaded point loads beyond what is shown in Boise Cascade Tech Note LVL-4 and LVL-10. • Table is not applicable for 1 1/2" wide VERSA -LAM® beams. Tech Note LVL-17 Page 1 of 1 11/12 F Boise Cascade" ENGINEERED WOOD PRODUCTS Temporary Storage of Masonry Block on Bdo / AJS° Joist Floors In areas where concrete masonry block is used in the construction of walls, limited job site space may require the short-term storage of blocks on a BCI®/ AJS° floor. Because of the significate weight, caution should be used in the block stack placement location and size. The following guidelines shall be followed. General Notes • Limits based upon a normal weight concrete masonry unit (8k8x16) weight of 37 pounds (Reinforced Masonry Engineering Handbook, Masonry Institute of America). • No more than one masonry block stack shall be placed on any joist. • Limits shown are valid for all series and depths if the specific floor joists are properly sized for the occupancy design locals._ • BCI° / AJS° joist shall not be spaced greater than 24" on -center. Floor sheathing shall be designed by the structure's design professional of record and installed properly prior to block storage. • The floor shall not be loadedwith concrete masonry block for a period longer than three days. • Avoid allowing the joists or floor sheathing to get wet before or during loading. Wet wood may take a permanent set under load in the deflected shape. No Shoring Required 8" tall masonry block stack maximum 48" x 48" footprint, . maximum 2 courses tall BCl/AJS Joists, max 24" o.c.s. Temporary Storage of Masonry Block Page 1 of 2 r05/2019 0 i Boise Cascade® ENGINEERED WOOD PRODUCTS • Masonry block stack may be placed anywhere along span length with the exception of no closer than 4'-0" from any intermediate bearing. • Concrete masonry units (8x8x16) shall be stacked no higher than two courses tall by 48 inches wide. • Deviation of preceding provisions voids BCI® / AJS® product warranty. Shoring Required CSI.I!/1JJ JOISiS, max 24" o.c.s. mry block stack t8" x 48" footprint, 3 courses tall :sign by others L) UVQgjj 1 Uy others • The design of the shoring members and transfer of load from the shoring is the responsibility of the design professional of record. Inadequate shoring design voids the BCI° / AJS® product warranty. • Concrete masonry units (8x8x16) shall be stacked no higher than six courses tall by 48 inches wide. Temporary Storage of Masonry Block Page 2 of 2 ro5/2ol9 I L Boise Cascade fnaineered-Wood Products Technical Temporary Storage of Gypsum Wallboard on BCI°/AJS° Joists The practice of stacking gypsum wallboard on wood floors prior to the installation is common and necessary to the successful completion of any residential project. Because of the enormous weight, caution should be used in the placement location and size. The following guidelines are recommended by Boise Cascade EWP Engineering. • Gypsum wallboard shall be stacked no higher than 11' inches (22 sheet limit for 1/2" gypsum board, 17 sheet limit for 5/8" gypsum board). • Placement of wallboard stacks in the middle of a room is not allowed. Loading- in the middle of the joist span induces greater deflections compared to loads placed near the joist's supports. • No more than one gypsum stack shall be placed on a single joist. • Wallboard stacks shall be oriented with their long dimension perpendicular to the joist layout direction. In this orientation, more joists are supporting the wallboard. • The floor shall not be loaded with wallboard for a period longer than 4 weeks. • Avoid allowing the joists or floor sheathing to get wet while loaded. Wet wood will take a permanent set, which may be unsightly. Tech Note IJ-7 Page 1 of 1 r4/10 ITS/MIT/HIT . . ... ...... ........ ... ...... . .... .. ..... . . ..... .. . ..... .... ­­ .... ...... ....... _-_-Engineered Wbod-Product.-Top-Range flangers-__ This product Japmferablo to similar connectors because lu of (a) easier Installation, (b) higher lands, (c) lower Installed 73 cost, ore combination ofthese features. .......... .. Simpson Strong -Tie offers a dedicated range of top -flange 1-joist hangers that meet the unique needs of I-jolsts while offering superior performance and ease of Installation.. ITS The Innovative ITS sets the standard for engineered wood top - flange hangers. The ITS Installs faster and uses fewer nails than any other EWP top -flange hanger. The Strong -Grip'" seat and Funnel Flange features allow standard joist Installation without requiring joist nails, resulting In the lowest Installed cost. The Strong -Grip seat firmly secures I-Jolsts with flange thicknesses from I 'A" to 1 W'. MITIHIT — Positive -Angle Nailing (PAN) PAN is specifically designed for I-jolsts when used with the MIT or HIT. With PAN, the nail hole materiel Is not removed; but is formed to channel and confine the path of the nall at approximately 450. PAN minimizes splitting of the flanges while permitting time -saving nailing from a better angle. See top flange tables on pp. 173-182. Refer to joist manufacturees.11terature or appropriate Simpson Strong-Te Connector Selection Guide for actual joist sizes, Material: ITS — 18 gauge; MIT, HIT — 16 gauge Finish- Galvanized Installation: • Use all specified fasteners. Verify that the header can take the required fasteners specified In the table. • See pp. 95-96 for more Installation Information. • ITS — no: joist nailing required for standard 1-jolst Installation without -web stiffeners. When supporting 1-joists with *web stiffeners. or rectangular SOL membar.(2) 0.148" x 1 1h' nails must be installed Into optional triangle joist nail holes for standard installation values. • ITS — Optional triangle nail holes may be used for additional load. See allowable load tables. • MIT — optional triangle nail holes may be. used for Increased uplift capacity. Sao Optional Nailing For Increased Uplift table. • HIT — closed PAN nall'holes may be used -for Increased uplift capacity. See Optional Nalling For Increased Uplift table. • For sloped Joists up to 1/412 there is no reduction,; between 1/4:12 and up to 1/212, tests showa 10% reduction in ultimate hanger strength. Local crushing of the bottom tango or excessive deflection may be limiting; check with joist manufacturer for specific limitations on bearing of this type. Allowable Loads: • The ITS, MIT and HIT hangers have locations for optional nails if additional uplift is needed. Optional uplift nailing requires the addition of property -secured Web stiffeners. See the load tables for minimum required fasteners and allowable uplift loads. • For attaching to multi -ply headers, refer to technical bulletin T-C-MPLYHEADR at strongtie.com. Options: • Because these hangars are fully die -formed, they cannot be modified. However these models will normally accommodate a skew of up to 6*. - Codes: See p. 12 for Code Reference Key Chart 008nal P Mnig, .6m - for w tt OrMIT OrHIT Funnel flange Strong -Tie 3 irip' seat Its irrAcmitiorr-1.1-- nails. TyploW MIT Installed on a Double LVL HIT Installation on a 3x Nailer mounted on a Steel Beam (ITS, MIT similar) IUS/MIU ..I-Joist..Hangers..._.__.....__....._..._.__._..........:..._......._._--_.. A 6 This product is preferable to', similar connectors because W of (a) easier installation, (b) higher loads, (a) lower installed cost, or a combination of these features. 4 _..... The IUS is a hybrid hanger that incorporates the advantages of the face -mount and top -mount hanger. Installation is fast with the `;p Strong -Grip' seat, easy -to -reach face nails and self jigging locator tabs. 7 m The MIU series hangers are designed for commercial and high -load O = I -joist applications without requiring web stiffeners. The MIU features O Positive Angle Nailing (PAN), which minimizes splitting of the flanges Vwhile permitting time -saving nailing from a better angle. AA Material: IUS — 18 gauge;. MIU — 16 gauge E Finish: Galvanized Uplift Loads: o. Modelshave optional triangle joist nail holes for additional uplift. H a Properly attached web stiffeners are required. 50 • MIU — add four additional 0.148" x 1I joist nails for a total V uplift load of 975 lb. Funnel 11AN flat .ocator tab w ruo — GUu. Wou auu. 190 7c r n fum rrmrs nl Ulu Mar rlJ.IG for _._ IUS Installation: (some VS models • Use all specified fasteners. Verily that the header can take the required fasteners specified in the table. See pp. 95-96 for more installation L information. • IUS — fasten hanger to header. Position Ijoist into hanger and snap into, place. No joist nailing required. Some IUS models have triangle and round header nail holes. To achieve max. download, fill both round and triangle holes. • IUS — Locator tabs are not structural. They may be bent back to. adjust for hanger placement. • IUS — for rimboard applications -see technical bulletin T RIMBDHGR at stmngtie.com! • IUS — I joists with web stiffeners or rectangular sections can be used with the installation of (2) 0.1480 x 11/:° nails into the optional triangle joist nails. • IUS — web stiffeners are not required with I joists when the top flange is laterally supported by the sides of the hanger unless r-3quired by 1 joist manufacturer. Options: • These hangers cannot be modified. However, these models will normally accommodate a skew of up to 5°. For sloped joists up to'/c 12 there is no reduction; between'/4:12 and up to 1h;12, tests show a 10% reduction in ultimate hanger strength. Local crushing of the bottom flange or excessive deflection may be limiting; check with joist manufacturer for specific limitations on bearing of this type. Codes: See p.12 for Code Reference Key Chart have, triangle holes in header flanges for min./max nailing) U.S. Patent 6,523;321 IUS Installation Sequence step 1 Attach the IUS to the header. SIMPSON Sta°ongTie The Strong -Grip'" seat secures 11joists in position without joist nails. Avoid a Misinstallation Do not make your own holes. Do not.nafl the bottom flange. Step 2 Slide the I -joist downward into the IUS until it rests above the large teardrop. MIU Step 3 Firmly push or snap I joist fully into the seat of the IUS. .MIU with Correct PAN Installation