Loading...
HomeMy WebLinkAboutblower door,4 .'. Planning & Development Services i Building & Code Regulation Division f' 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification 2 f fl l�G Prescriptive and Performance Method Date: 2 L r Permit #: Contractor: Job Address: _ "L (� A (�; ��f �� i C1=L Construction: �) New Construction — Complete ( ) Existing —After Addition House Infiltration Test Results SLC Climate Zone 2 CFM (50) Test Date: 3 �( t-tl Volume ACH (50) = CFM (50) x 60 / Volume = s Mechanical Ventilation required less than 3 ACH Passing results must be & ACH (50) or less (Pass ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testing Company Company Name: Pro -Duct Services Address: 1915 Rio Vista Drive, Ft. Fierce, FL 34W9 I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance with Section R402.4.1.2 Climate Zone 2, Signature Printed Name: Martin Klein License/Certification #: 5061633 Planning R Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Forl Pierce, FL 34982 772A62-2165 Fax 772A62-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: } 1 /"101.) t SO>q C Permit #: -0 0 6 d (( Z Lot #: 21 ' n Contractor: Address: Construction: ,most Construction Test ❑ Rough -in Test Test Conditions: Date: —._i. �o 1 t Time: i1 • t� Indoor Temperature (F): k� Outdoor Temperature (F): 1 Total Leaka-M Test (OuWdel Duct Leakage: ❑ Default Test sure: Zsrop. leak Free (Pa) Baseline Duct Pressure (optional) _ o cl (Pa) U= mess. (Pa) Ring I Fan Press Z �• -T Company Nerve: Pro -Duct Services Floor Area (ft2): 2 S ( ;' Primary Location of Supply Ductwork A le Primary Location of Return Ductwork I N ,>a:Proposed On Results: Pass ❑ Fail Total Leakage (cfm): 6­7 Total Leakage per 100 sgft: L p„ o .0 'L CFM25 x 100 divided by the CFA = Dud Leakage CFiW100 sgit Addreee: L_3._1 R I,, V 11 LA It 11,Pi • IF, T 1 �L i Sect= � t the ebcve Dud 6setinp Leak "A demonstret>a oompllanoe wflh P Editlotl FBC EwW Cwawvg*n Mb h accgwnce wild Panted Nwne: Martin Klein lkenf+alCaUAttsb II: d081Q93