Loading...
HomeMy WebLinkAboutCommercial HVAC LoadsRECEIVED SLCSO Visitation Building DEC 17 2020 HVAC Load Analysis Permitting Department y St. Lucie County for St. Lucie County Sheriffs Dept. 900 North Rock Road Fort Pierce, Florida QassRF�,t ' s aw Ido 982 Rr W �";a.se"•" gA reNY3a' Eric J. Svoboda, PE Fort Pierce Engineering, Inc. 315 South 7th Street Fort Pierce, FL 34950 772-672-4636 Thursday, October 29, 2020 FILE COPY v Chvac Full Commercial HYAC Loads�Calculat7on Program � `' �� Eiite Softvidi velopment, Inc Fort Pierce.Engineennq_ _-. k SLCSO Visitation Builtlinq; Fort Pierce EL 34950 age2. General Project Data Input General` Pro ecf .lrifo�mation:• 4" 1. ' Project file name: SLCSO Visitation Building Heat Load.CH8 Project title: SLCSO Visitation Building Designed by: Eric J. Svoboda, PE Project date: Monday, July 07, 2008 Weather reference city: FORT PIERCE, FLORIDA, USA Client name: St. Lucie County Sheriffs Dept. Client address: 900 North Rock Road - Client city: Fort Pierce, Florida Company name: Fort Pierce Engineering, Inc. Company representative: Eric J. Svoboda, PE Company address: 315 South 7th Street Company city: Fort Pierce, FL 34950 Company phone: 772-672-4636 Company fax: 772-672-4637 Barometric pressure: 29.894 in.Hg. Altitude: 25 feet Latitude: 27 Degrees Mean daily temperature range: 15 Degrees Starting & ending time for HVAC load calculations: 7am - 10pm Number of unique rooms in this project: 13 `Bilclin``"Default Values. ' ' { Calculations performed: Both heating and cooling loads Lighting requirements: 2.00 Watts per square foot Equipment requirements: 1.00 Watts per square foot People sensible load multiplier: 250 Btuh per person People latent load multiplier: 200 Btuh per person Room sensible safety factor: 0 % Room latent safety factor: 0 % Room heating safety factor: 0 % People diversity factor: 100 % Lighting profile number: 0 Equipment profile number: 0 People profile number: 0 Building default ceiling height: 9.00 feet Building default•wall height: 12.00 feet Iriferrial 0 'erafi" 'Lo`"d Profiles: C 100 fi hr I hr I hr hr I hr I hr -hr hr hr hr hr hr hr hr hr hr hr I hr hr hr hr hr hr hr 1: 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 C. c. C C C C c C C C c C C C C C C C C C C C C C 2 C C C C c C- .c C C c c C C c C C C C C C c C C C 3 C c C C- '• C, C C C C C c C C C C c C C C C C C C C 4 C . b C C C C C C C C C C C c C C C C C C c C C C 5 C C C C.-C' .•c C C C c c C C C C C C c C C C C C C 6 C C :C C C C� C C C C C C C C C C C C C C C c C C 7 C C C. C C. - C C C C C C C C C C C C C C C C C C C 8 C C C C C C C C C C C C C C C C C C C C C C C C 9 C C c c C C C C c C C C C C C C C C C C C C C C io C C C C C C C C C C C C C C C C C C C C C C C C ZA ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM Fort Pierce, FL 34$ 5 General PLqLect Data Input (contV Design Outdoor Outdoor Indoor Indoor 8nmino In/Outdoor Month D[y Bulb Wet Bulb Rel.Hum D[y Bulb Diff Correction August 95 80 50% 75 68.33 G Roof ASHRAE Roof Dark Susp. No. Rooff U-Fac Color Cell 1 1 Roof#1 Description: Metal Roof, R-2D 0.050 No No Wall ASHRAE Wall Wall No. Group U-Fac Color 1 C 0.095 D Wall #1 Description: Block wall, 8" sand & gravel, hollow core, siding exterior, interior finish, 1 " extruded poly, R-5.0 Partition Partition Cool Heat 1 0.095 10 10 Partition #1Description: Block partition, 8" sand & gravel, hollow core, siding exterior, interior finish, 1 " extruded poly, R- 5.0 Glass Summer Winter Glass Interior Interior 1 0.810 0.830 8Iana#1 Description: OahaultGlano Zi'. \GLCGOVisitation Building Heat Load.CMo Thursday, October 2B.2VoV.V3:osPN Chvac FuII Commercial HVAC Loads Calculatlonl?rogramd; Ehte Software Development, Inc: FortPierce Engineering SLCSO Visitation Bwldmq� Bumding summaty Loads Building peaks in August at 3pm. 31dg Load Area ; Sen a t Sen Net %Ne �escripti'ons. t Quan Loss Loss`' Gain Gain Gain a kGair Roof 6,732 Wall 3,720 Glass 96 Floor Slab _..._.. ............ .... _ 318 Skin Loads Lighting 13,464 Equipment 6,732 Pool Latent 0 People 63 Partition 360 Cool. Pret. 0 Heat. Pret. 0 Cool. Vent. 800 Heat. Vent. 800 Cool. Infil. 0 Heat. Infil. 0 Draw-Thru Fan 0 Blow-Thru Fan 0 Reserve Cap. 0 Reheat Cap. 0 Supply Duct 0 Return Duct 0 Misc. Supply 0 Misc. Return 0 Building Totals 11,108 18.29 0 14,747 14,747 8.27 11,662 19.20 0 7,320 7,320 4.11 2,629 4.33 0 3,748 3,748 2.10 6,506 10.71 0 0 0 0.00 31,906 52.53 0 25,815 25,815 14.48 0 0.00 0 45,941 45,941 25.78 0 0.00 0 22,971 22,971 12.89 0 0.00 0 0 0 0.00 0 0.00 12,600 15,750 28,350 15.91 342 0.56 0 342 342 0.19 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 36,054 17,584 53,638 30.09 28,486 46.90 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 1,175 1,175 0.66 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 0 0 0.00 60,734 100.00 48,654 129,578 178,232 100.00 3ullding �� ' J k Sens %Tot, ��Lat a Sen n Nei %Ne t°y � x �, x a a y B� aka ,: �;. 6��? 7 s ' ?���' � .: � �,.; ° i �. ' �:' �9R� .�a� Siarnila °.w�. x Loss° Loss,. Gam = n P�Gam��. GalrS _ Ga'ir Ventilation 28,486 46.90 36,054 17,584 53,638 30.09 Infiltration 0 0.00 0 0 0 0.00 Pretreated Air 0 0.00 0 0 0 0.00 Room Loads 32,248 53.10 12,600 110,819 123,419 69.25 Plenum Loads 0 0.00 0 0 0 0.00 Fan/Duct/Misc Loads 0 0.00 0 1,175 1,175 0.66 Building Totals 60,734 100.00 48,654 129,578 178,232 100.00 Total Building Supply Air (based on a 21 ° TD): 4,910 CFM Total Building Vent. Air (16.29% of Supply): 800 CFM Total Conditioned Air Space: 6,732 Sq.ft Supply Air Per Unit Area: 0.7293 CFM/Sq.ft Area Per Cooling Capacity: 453.3 Sq.ft/Ton Cooling Capacity Per Area: 0.0022 Tons/Sq.ft Heating Capacity Per Area: 9.02 Btuh/Sq.ft Total Heating Required With Outside Air: 60,734 Btuh Total Cooling Required With Outside Air: 14.85 Tons Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM ChvacFull Corrimercial.HVAC Loads Calculation'Programer Elite Software Development, Inc Fort Pierce Engineerinq ,.' SL'CSO-Visitation BuiltlmqFort Pierce, FL'34950' Air Handler. #1 - AHU 1 - Summa Loads Rm � Description' A ` Area Htg Loss Sen Galn ' Lat Galn "' ' Htg O A 5 Clg O A No Room Peak Time Peo CI CFM S.Exh E� P le HtgCFM9 Req CFM ;Req CFM: Volume, :CFM/S ft€ CFMIS 4"W.Exh 4 C ''.Act:.M 4aAct:CFM 1 Lobby 750 6,991 19,301 2,000 Direct Direct 9am August 10 324 814 0 115 115 6,750 0.43 1.09 0 176 143 2 RR 1 56 637 1,335 200 Direct Direct 3pm August 1 30 56 0 9 9 504 0.53 1.01 0 16 10 3 RR 2 56 172 1,029 200 Direct Direct 2pm August 1 8 43 0 9 9 504 0.14 0.77 0 4 8 4 RR 3 56 172 1,029 200 Direct Direct 2pm August 1 8 43 0 9 9 504 0.14 0.77 0 4 8 5 North Office 230 482 3,472 400 Direct Direct 2pm August 2 22 146 0 35 35 2,070 0.10 0.64 0 12 26 6 Reception 270 446 3,869 400 Direct Direct 2pm August 2 21 163 0 42 42 2,430 0.08 0.60 0 11 29 7 Hall 36 59 699 200 Direct Direct 2pm August 1 3 29 0 6 6 324 0.08 0.82 0 1 5 8 South Office 170 977 2,911 400 Direct Direct 4pm August 2 45 123 0 26 26 1,530 0.27 0.72 0 25 22 Room Peak Totals: 1,624 9,937 33,644 4,000 Total Rooms: 8 20 460 1,419 0 250 250 Unique Rooms: 8 14,616 0.28 0.87 0 250 250 Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM Clivac Fu111Commerclal H1IAC,Loads Calculation Rrogram Fort Pierce Engmeernq ' ° , �� ` �w EIrteSoftware Development, inc; SLCSO Visitation'Bwltlinq, Air Handler #1- AHU 1- Total Load Summa Air Handler Description: AHU 1 Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.13 HP Fan Input: 0% motor and fan efficiency with 0 in. water across the fan Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. --- Air System Peak Time: 3pm in August. Outdoor Conditions: Clg: 950 DB, 80' WB, 131.03 grains, Htg: 42' DB Indoor Conditions: Clg: 75' DB, 50% RH, Htg: 75' DB Because of the diversity in room, plenum and ventilation loads, the room sensible peak time in August at gam is different from the total system peak time, hence the air system CFM was computed using a room sensible load of 32,415. Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air. Room Space sensible loss: 9,937 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 8,902 Btuh 250 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: - 18,839 Btuh Heating Supply Air: 9,937 / (.999 X 1.08 X 20) = 460 CFM Winter Vent Outside Air (54.3% of supply) = 250 CFM Room space sensible gain: 31,153 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 340 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 0 Btuh Total sensible gain on supply side of coil: 31,493 Btuh Cooling Supply Air: 32,754 / (.999 X 1.1 X 21) = 1,419 CFM Summer Vent Outside Air (17.6% of supply) = 250 CFM Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: 5,495 Btuh 250 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: 5,495 Btuh Total sensible gain on air handling system: 36,988 Btuh Room space latent gain: 4,000 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 11,267 Btuh Total latent gain on air handling system: 15,267 Btuh Total system sensible and latent gain: 52,255 Btuh CheekFi' ures� Total Air Handler Supply Air (based on a 21' TD): 1,419 CFM Total Air Handler Vent. Air (17.62% of Supply): 250 CFM Total Conditioned Air Space: 1,624 Sq.ft Supply Air Per Unit Area: 0.8739 CFM/Sq.ft Area Per Cooling Capacity: 372.9 Sq.ft/Ton Cooling Capacity Per Area: 0.0027 Tons/Sq.ft Heating Capacity Per Area: 11.60 Btuh/Sq.ft Total Heating Required With Outside Air: 18,839 Btuh Total Cooling Required With Outside Air: 4.35 Tons Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM S Visitation 2pmAuguot ����.... ��... ��� Room Peak Totals: Total Rooms: 1 Unique Rooms: 1 1.980 7.533 31,494 4.000 20 340 1.378 0 17.840 O18 0.70 O __ _... .... ... __ 1.960 7.533 31.494 4.OUO 20 349 1.378 � D 17.640 0.18 OJO O ------- Oirect ..... ........ —'-- Direct 250 250 250 250 250 250 oA'. \GLCSOVisitation Building Heat Lood/cMu Thumduy, October 29,202003:06PN Clivac Elite Software Development, Inca Fort PierceEngrneennq xw SLCSO Visitation Bwldinq .6 4 „ „ Air Handler #2 - AHU 2 - Total Load Summary Air Handler Description: AHU 2 Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.13 HP Fan Input: 0% motor and fan efficiency with 0 in. water across the fan Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. --- Air System Peak Time: 2pm in August. Outdoor Conditions: Clg: 95° DB, 80° WB, 131.77 grains, Htg: 42° DB Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75' DB Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air. Room Space sensible loss: 7,533 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 8,902 Btuh 250 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 16,435 Btuh Heating Supply Air: 7,533 / (.999 X 1.08 X 20) = 349 CFM Winter Vent Outside Air (71.6% of supply) = 250 CFM Room space sensible gain: 31,494 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 330 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 0 Btuh Total sensible gain on supply side of coil: 31,824 Btuh Cooling Supply Air: 31,824 / (.999 X 1.1 X 21) = 1,379 CFM Summer Vent Outside Air (18.1 % of supply) = 250 CFM Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: 5,495 Btuh 250 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: 5,495 Btuh Total sensible gain on air handling system: 37,319 Btuh Room space latent gain: 4,000 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 11,267 Btuh Total latent gain on air handling system: 15,267 Btuh Total system sensible and latent gain: 52,586 Btuh Total Air Handler Supply Air (based on a 21° TD): 1,379 CFM Total Air Handler Vent. Air (18.13% of Supply): 250 CFM Total Conditioned Air Space: 1,960 Sq.ft Supply Air Per Unit Area: 0.7035 CFM/Sq.ft Area Per Cooling Capacity: 447.3 Sq.ft/Ton Cooling Capacity Per Area: 0.0022 Tons/Sq.ft Heating Capacity Per Area: 8.39 Btuh/Sq.ft Total Heating Required With Outside Air: 16,435 Btuh Total Cooling Required With Outside Air: 4.38 Tons Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM Chvac -;Full Cor►imerc�al:iVAC Loads Calculation:Program �� EhCe Software De`vefopmeri$;tlnc. Fort Pierce Enqueisnnq �� SLCSO Visitation Building''14950 Air Handler #3 - AHU 3 - Summa Loads Rm Description, Area Ag Loss Sen Gain Lat Gain Htg O AQA.:� y . &, e �. t s e t 4 # r No l Roorn Peak Time' Y People Htg CFM Cig CFM S:Exh ;ReghC'FM `Req CFM` Volume CFM/S ftCFM/S�° ft W Exh9 Act.CFM `.r Act.CEIVh ... ..... .. ..----... --- --- --- --, - -. .... .... ... --_._...---._- .---- -- - _.-----. 10 Storage East 1,566 5,720 23,273 2,200 Direct Direct 3pm August 11 265 1,019 0 150 150 14,094 0.17 0.65 0 150 150 Room Peak Totals: 1,566 5,720 23,273 2,200 Total Rooms: 1 11 265 1,019 0 150 150 Unique Rooms: 1 14,094 0.17 0.65 0 150 150 Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM Ctivac Full Commercial HVAC Loads Calculation Programs Elrte`Software Development, Inc. Fort PierceEngineeiinq SLC S isitaton Build, yw a _' 0 _ Air Handler #3 - AHU 3 - Total Load Summa Air Handler Description: AHU 3 Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.10 HP Fan Input: 0% motor and fan efficiency with 0 in. water across the fan Sensible Heat Ratio: 0.91 --- This system occurs 1 time(s) in the building. --- Air System Peak Time: 3pm in August. Outdoor Conditions: Clg: 95' DB, 80° W13, 131.03 grains, Htg: 420 DB Indoor Conditions: Clg: 75' DB, 50% RH, Htg: 750 DB Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air. Room Space sensible loss: 5,720 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 5,341 Btuh 150 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 11,061 Btuh Heating Supply Air: 5,720 / (.999 X 1.08 X 20) = 265 CFM Winter Vent Outside Air (56.6% of supply) = 150 CFM Room space sensible gain: 23,273 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 244 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 0 Btuh Total sensible gain on supply side of coil: 23,517 Btuh Cooling Supply Air: 23,517 / (.999 X 1.1 X 21) = 1,019 CFM Summer Vent Outside Air (14.7% of supply) = 150 CFM Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: 3,297 Btuh 150 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: 3,297 Btuh Total sensible gain on air handling system: 26,814 Btuh Room space latent gain: 2,200 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 6,760 Btuh Total latent gain on air handling system: 8,960 Btuh Total system sensible and latent gain: 35,774 Btuh - Total Air Handler Supply Air (based on a 21 ° TD): 1,019 CFM Total Air Handler Vent. Air (14.72% of Supply): 150 CFM Total Conditioned Air Space: 1,566 Sq.ft Supply Air Per Unit Area: 0.6507 CFM/Sq.ft Area Per Cooling Capacity: 525.3 Sq.ft/Ton Cooling Capacity Per Area: 0.0019 Tons/Sq.ft Heating Capacity Per Area: 7.06 Btuh/Sq.ft Total Heating Required With Outside Air: 11,061 Btuh Total Cooling Required With Outside Air: 2.98 Tons ZA ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM Chvac =Full°CommerciahWVACLoads CalculatIonjPrograr� Elite Softuvare De4etopm®nt;_Inc. FortPierce Engineering 'SL"CSO Vi'sitation Buildmgx' Fort Pierce, FL 34950 . Pic a 11 Air Handler #4 - AHU 4 - Summa Loads Rrri: 'J Description Area Htg:Loss Sen Gain ;Lat.Gain Htg O A v Clg O A No ` �� Room Peak Time Peopie Htg.CFM Clg CFM S Exh'Req CFM Req CFM Volume.. CFM%S� ft.. CFMLS ft. ,. W.Exh..,.. �:Act.CFM Act.CFM�' 11 Storage West 1,470 7,595 22,632 2,000 3pm August 10 352 983 0 13,230 0.24 0.67 0 12 Office 64 570 1,305 200 9pm August 1 26 57 0 576 0.41 0.89 0 13 RR 48 892 1,228 200 9pm August 1 41 53 0 432 0.86 1.11 0 Room Peak Totals: 1,582 9,057 25,165 2,400 Total Rooms: 8 12 420 1,093 0 Unique Rooms: 3 14,238 0.27 0.69 0 Direct Direct 139 139 126 135 Direct Direct 6 6 9 8 Direct Direct 5 5 15 7 150 150 150 150 ZA ...1SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM ChYac Full Commercial HVAC Loads Calculation3Program< Fo t PiercexEnginee inq �; Elite Software Development ,I'nc '; SLaSO Visitation-Bwldinq, woierce. 495 e. Air Handler #4 - AHU 4 - Total Load Summa Air Handler Description: AHU 4 Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.10 HP Fan Input: 0% motor and fan efficiency with 0 in. water across the fan Sensible Heat Ratio: 0.91 --- This system occurs 1 time(s) in the building. --- Air System Peak Time: 4pm� in August. Outdoor Conditions: Clg: 950 DB, 800 WB, 131.77 grains, Htg: 42' DB Indoor Conditions: Clg: 750 DB, 50% RH, Htg: 750 DB Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air. Room Space sensible loss: 9,057 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 5,341 Btuh 150 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 14,398 Btuh Heating Supply Air: 9,057 / (.999 X 1.08 X 20) = 420 CFM Winter Vent Outside Air (35.7% of supply) = 150 CFM Room space sensible gain: 24,955 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 262 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 0 Btuh Total sensible gain on supply side of coil: 25,217 Btuh Cooling Supply Air: 25,217 / (.999 X 1.1 X 21) = 1,093 CFM Summer Vent Outside Air (13.7% of supply) = 150 CFM Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: 3,297 Btuh 150 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: 3,297 Btuh Total sensible gain on air handling system: 28,514 Btuh Room space latent gain: 2,400 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 6,760 Btuh Total latent gain on air handling system: 9,160 Btuh Total system sensible and latent gain: 37,674 Btuh Total Air Handier Supply Air (based on a 210 TD): 1,093 CFM Total Air Handler Vent. Air (13.73% of Supply): 150 CFM Total Conditioned Air Space: 1,582 Sq.ft Supply Air Per Unit Area: 0.6906 CFM/Sq.ft Area Per Cooling Capacity: 503.9 Sq.ft/Ton Cooling Capacity Per Area: 0.0020 Tons/Sq.ft Heating Capacity Per Area: 9.10 Btuh/Sq.ft Total Heating Required With Outside Air: 14,398 Btuh Total Cooling Required With Outside Air: 3.14 Tons Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM