HomeMy WebLinkAboutCommercial HVAC LoadsRECEIVED
SLCSO Visitation Building DEC 17 2020
HVAC Load Analysis Permitting Department
y St. Lucie County
for
St. Lucie County Sheriffs Dept.
900 North Rock Road
Fort Pierce, Florida
QassRF�,t
' s
aw
Ido 982
Rr
W
�";a.se"•" gA
reNY3a'
Eric J. Svoboda, PE
Fort Pierce Engineering, Inc.
315 South 7th Street
Fort Pierce, FL 34950
772-672-4636
Thursday, October 29, 2020
FILE COPY
v
Chvac Full Commercial HYAC Loads�Calculat7on Program � `' �� Eiite Softvidi velopment, Inc
Fort Pierce.Engineennq_ _-. k SLCSO Visitation Builtlinq;
Fort Pierce EL 34950 age2.
General Project Data Input
General` Pro ecf .lrifo�mation:•
4" 1.
'
Project file name:
SLCSO Visitation Building Heat Load.CH8
Project title:
SLCSO Visitation Building
Designed by:
Eric J. Svoboda, PE
Project date:
Monday, July 07, 2008
Weather reference city:
FORT PIERCE, FLORIDA, USA
Client name:
St. Lucie County Sheriffs Dept.
Client address:
900 North Rock Road -
Client city:
Fort Pierce, Florida
Company name:
Fort Pierce Engineering, Inc.
Company representative:
Eric J. Svoboda, PE
Company address:
315 South 7th Street
Company city:
Fort Pierce, FL 34950
Company phone:
772-672-4636
Company fax:
772-672-4637
Barometric pressure: 29.894 in.Hg.
Altitude: 25 feet
Latitude: 27 Degrees
Mean daily temperature range: 15 Degrees
Starting & ending time for HVAC load calculations: 7am - 10pm
Number of unique rooms in this project: 13
`Bilclin``"Default Values.
' '
{
Calculations performed:
Both heating and cooling loads
Lighting requirements:
2.00
Watts per square foot
Equipment requirements:
1.00
Watts per square foot
People sensible load multiplier:
250
Btuh per person
People latent load multiplier:
200
Btuh per person
Room sensible safety factor:
0
%
Room latent safety factor:
0
%
Room heating safety factor:
0
%
People diversity factor:
100
%
Lighting profile number:
0
Equipment profile number:
0
People profile number:
0
Building default ceiling height:
9.00
feet
Building default•wall height:
12.00
feet
Iriferrial
0 'erafi"
'Lo`"d
Profiles: C
100 fi
hr
I hr
I hr
hr
I hr
I hr
-hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
I hr
hr
hr
hr
hr
hr
hr
1:
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
C.
c.
C
C
C
C
c
C
C
C
c
C
C
C
C
C
C
C
C
C
C
C
C
C
2
C
C
C
C
c
C-
.c
C
C
c
c
C
C
c
C
C
C
C
C
C
c
C
C
C
3
C
c
C
C-
'• C,
C
C
C
C
C
c
C
C
C
C
c
C
C
C
C
C
C
C
C
4
C
. b
C
C
C
C
C
C
C
C
C
C
C
c
C
C
C
C
C
C
c
C
C
C
5
C
C
C
C.-C'
.•c
C
C
C
c
c
C
C
C
C
C
C
c
C
C
C
C
C
C
6
C
C
:C
C
C
C�
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
c
C
C
7
C
C
C.
C
C.
- C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
8
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
9
C
C
c
c
C
C
C
C
c
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
io
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
ZA ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
Fort Pierce, FL 34$ 5
General PLqLect Data Input (contV
Design Outdoor Outdoor Indoor Indoor 8nmino In/Outdoor
Month D[y Bulb Wet Bulb Rel.Hum D[y Bulb Diff Correction
August 95 80 50% 75 68.33 G
Roof ASHRAE Roof Dark Susp.
No. Rooff U-Fac Color Cell
1 1
Roof#1 Description: Metal Roof, R-2D
0.050
No
No
Wall
ASHRAE
Wall
Wall
No.
Group
U-Fac
Color
1 C 0.095 D
Wall #1 Description: Block wall, 8" sand & gravel, hollow core, siding exterior, interior finish, 1 " extruded poly, R-5.0
Partition
Partition
Cool
Heat
1 0.095 10 10
Partition #1Description: Block partition, 8" sand & gravel, hollow core, siding exterior, interior finish, 1 " extruded poly, R-
5.0
Glass Summer Winter Glass Interior Interior
1 0.810 0.830
8Iana#1 Description: OahaultGlano
Zi'. \GLCGOVisitation Building Heat Load.CMo Thursday, October 2B.2VoV.V3:osPN
Chvac FuII Commercial HVAC Loads Calculatlonl?rogramd; Ehte Software Development, Inc:
FortPierce Engineering SLCSO Visitation Bwldmq�
Bumding summaty Loads
Building peaks in August at 3pm.
31dg Load Area ; Sen a
t Sen Net %Ne
�escripti'ons. t Quan Loss Loss`' Gain Gain Gain a kGair
Roof
6,732
Wall
3,720
Glass
96
Floor Slab
_..._.. ............ ....
_ 318
Skin Loads
Lighting
13,464
Equipment
6,732
Pool Latent
0
People
63
Partition
360
Cool. Pret.
0
Heat. Pret.
0
Cool. Vent.
800
Heat. Vent.
800
Cool. Infil.
0
Heat. Infil.
0
Draw-Thru Fan
0
Blow-Thru Fan
0
Reserve Cap.
0
Reheat Cap.
0
Supply Duct
0
Return Duct
0
Misc. Supply
0
Misc. Return
0
Building Totals
11,108
18.29
0
14,747
14,747
8.27
11,662
19.20
0
7,320
7,320
4.11
2,629
4.33
0
3,748
3,748
2.10
6,506
10.71
0
0
0
0.00
31,906
52.53
0
25,815
25,815
14.48
0
0.00
0
45,941
45,941
25.78
0
0.00
0
22,971
22,971
12.89
0
0.00
0
0
0
0.00
0
0.00
12,600
15,750
28,350
15.91
342
0.56
0
342
342
0.19
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
36,054
17,584
53,638
30.09
28,486
46.90
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
1,175
1,175
0.66
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
0
0.00
0
0
0
0.00
60,734 100.00 48,654 129,578 178,232 100.00
3ullding �� ' J k Sens %Tot, ��Lat a Sen n Nei %Ne
t°y � x �, x a a y B� aka ,: �;. 6��? 7 s ' ?���' � .: � �,.; ° i �. ' �:' �9R� .�a�
Siarnila °.w�. x Loss° Loss,. Gam = n P�Gam��. GalrS _ Ga'ir
Ventilation 28,486
46.90
36,054
17,584
53,638
30.09
Infiltration 0
0.00
0
0
0
0.00
Pretreated Air 0
0.00
0
0
0
0.00
Room Loads 32,248
53.10
12,600
110,819
123,419
69.25
Plenum Loads 0
0.00
0
0
0
0.00
Fan/Duct/Misc Loads 0
0.00
0
1,175
1,175
0.66
Building Totals 60,734
100.00
48,654
129,578
178,232
100.00
Total Building Supply Air (based on a 21 ° TD):
4,910
CFM
Total Building Vent. Air (16.29% of Supply):
800
CFM
Total Conditioned Air Space:
6,732
Sq.ft
Supply Air Per Unit Area:
0.7293
CFM/Sq.ft
Area Per Cooling Capacity:
453.3
Sq.ft/Ton
Cooling Capacity Per Area:
0.0022
Tons/Sq.ft
Heating Capacity Per Area:
9.02
Btuh/Sq.ft
Total Heating Required With Outside Air:
60,734
Btuh
Total Cooling Required With Outside Air:
14.85
Tons
Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
ChvacFull Corrimercial.HVAC Loads Calculation'Programer Elite Software Development, Inc
Fort Pierce Engineerinq ,.' SL'CSO-Visitation BuiltlmqFort Pierce, FL'34950'
Air Handler. #1 - AHU 1 - Summa Loads
Rm � Description' A ` Area Htg Loss Sen Galn ' Lat Galn "' ' Htg O A 5 Clg O A
No Room Peak Time Peo CI CFM S.Exh
E� P le HtgCFM9 Req CFM ;Req CFM:
Volume, :CFM/S ft€ CFMIS 4"W.Exh 4
C ''.Act:.M 4aAct:CFM
1
Lobby
750
6,991
19,301
2,000
Direct
Direct
9am August
10
324
814
0
115
115
6,750
0.43
1.09
0
176
143
2
RR 1
56
637
1,335
200
Direct
Direct
3pm August
1
30
56
0
9
9
504
0.53
1.01
0
16
10
3
RR 2
56
172
1,029
200
Direct
Direct
2pm August
1
8
43
0
9
9
504
0.14
0.77
0
4
8
4
RR 3
56
172
1,029
200
Direct
Direct
2pm August
1
8
43
0
9
9
504
0.14
0.77
0
4
8
5
North Office
230
482
3,472
400
Direct
Direct
2pm August
2
22
146
0
35
35
2,070
0.10
0.64
0
12
26
6
Reception
270
446
3,869
400
Direct
Direct
2pm August
2
21
163
0
42
42
2,430
0.08
0.60
0
11
29
7
Hall
36
59
699
200
Direct
Direct
2pm August
1
3
29
0
6
6
324
0.08
0.82
0
1
5
8
South Office
170
977
2,911
400
Direct
Direct
4pm August
2
45
123
0
26
26
1,530
0.27
0.72
0
25
22
Room Peak Totals:
1,624
9,937
33,644
4,000
Total Rooms: 8
20
460
1,419
0
250
250
Unique Rooms: 8
14,616
0.28
0.87
0
250
250
Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
Clivac Fu111Commerclal H1IAC,Loads Calculation Rrogram
Fort Pierce Engmeernq '
° ,
�� ` �w
EIrteSoftware Development, inc;
SLCSO Visitation'Bwltlinq,
Air Handler #1- AHU 1- Total Load Summa
Air Handler Description: AHU 1 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of
0.13 HP
Fan Input: 0% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 3pm in August.
Outdoor Conditions: Clg: 950 DB, 80' WB, 131.03 grains, Htg: 42' DB
Indoor Conditions: Clg: 75' DB, 50% RH, Htg: 75' DB
Because of the diversity in room, plenum and ventilation loads, the room sensible peak time in August at gam is different
from the total system peak time, hence the air system CFM was computed using a room sensible
load of 32,415.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss: 9,937 Btuh
Infiltration sensible loss: 0 Btuh 0
CFM
Outside Air sensible loss: 8,902 Btuh 250
CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: -
18,839 Btuh
Heating Supply Air: 9,937 / (.999 X 1.08 X 20) = 460
CFM
Winter Vent Outside Air (54.3% of supply) = 250
CFM
Room space sensible gain: 31,153 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 340 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil:
31,493 Btuh
Cooling Supply Air: 32,754 / (.999 X 1.1 X 21) = 1,419
CFM
Summer Vent Outside Air (17.6% of supply) = 250
CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 5,495 Btuh 250
CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil:
5,495 Btuh
Total sensible gain on air handling system:
36,988 Btuh
Room space latent gain: 4,000 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 11,267 Btuh
Total latent gain on air handling system:
15,267 Btuh
Total system sensible and latent gain:
52,255 Btuh
CheekFi' ures�
Total Air Handler Supply Air (based on a 21' TD): 1,419
CFM
Total Air Handler Vent. Air (17.62% of Supply): 250
CFM
Total Conditioned Air Space: 1,624
Sq.ft
Supply Air Per Unit Area: 0.8739
CFM/Sq.ft
Area Per Cooling Capacity: 372.9
Sq.ft/Ton
Cooling Capacity Per Area: 0.0027
Tons/Sq.ft
Heating Capacity Per Area: 11.60
Btuh/Sq.ft
Total Heating Required With Outside Air: 18,839
Btuh
Total Cooling Required With Outside Air: 4.35
Tons
Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
S Visitation
2pmAuguot
����.... ��...
���
Room Peak Totals:
Total Rooms: 1
Unique Rooms: 1
1.980
7.533
31,494
4.000
20
340
1.378
0
17.840
O18
0.70
O
__ _... .... ... __
1.960
7.533
31.494
4.OUO
20
349
1.378
� D
17.640
0.18
OJO
O
-------
Oirect
..... ........ —'--
Direct
250
250
250
250
250 250
oA'. \GLCSOVisitation Building Heat Lood/cMu Thumduy, October 29,202003:06PN
Clivac Elite Software Development, Inca
Fort PierceEngrneennq xw SLCSO Visitation Bwldinq
.6 4 „
„
Air Handler #2 - AHU 2 - Total Load Summary
Air Handler Description: AHU 2 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.13 HP
Fan Input: 0% motor and fan efficiency with 0 in. water across
the fan
Sensible Heat Ratio: 0.89
--- This
system occurs
1 time(s) in the building. ---
Air System Peak Time: 2pm in August.
Outdoor Conditions: Clg: 95° DB, 80° WB, 131.77 grains, Htg:
42° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75' DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss: 7,533 Btuh
Infiltration sensible loss: 0 Btuh
0
CFM
Outside Air sensible loss: 8,902 Btuh
250
CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss:
16,435 Btuh
Heating Supply Air: 7,533 / (.999 X 1.08 X 20) =
349
CFM
Winter Vent Outside Air (71.6% of supply) =
250
CFM
Room space sensible gain: 31,494 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 330 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil:
31,824 Btuh
Cooling Supply Air: 31,824 / (.999 X 1.1 X 21) =
1,379
CFM
Summer Vent Outside Air (18.1 % of supply) =
250
CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 5,495 Btuh
250
CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil:
5,495 Btuh
Total sensible gain on air handling system:
37,319 Btuh
Room space latent gain: 4,000 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 11,267 Btuh
Total latent gain on air handling system:
15,267 Btuh
Total system sensible and latent gain:
52,586 Btuh
Total Air Handler Supply Air (based on a 21° TD):
1,379
CFM
Total Air Handler Vent. Air (18.13% of Supply):
250
CFM
Total Conditioned Air Space:
1,960
Sq.ft
Supply Air Per Unit Area:
0.7035
CFM/Sq.ft
Area Per Cooling Capacity:
447.3
Sq.ft/Ton
Cooling Capacity Per Area:
0.0022
Tons/Sq.ft
Heating Capacity Per Area:
8.39
Btuh/Sq.ft
Total Heating Required With Outside Air:
16,435
Btuh
Total Cooling Required With Outside Air:
4.38
Tons
Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
Chvac -;Full Cor►imerc�al:iVAC Loads Calculation:Program �� EhCe Software De`vefopmeri$;tlnc.
Fort Pierce Enqueisnnq �� SLCSO Visitation Building''14950
Air Handler #3 - AHU 3 - Summa Loads
Rm Description, Area Ag Loss Sen Gain Lat Gain Htg O AQA.:�
y . &, e �. t s e t 4 # r
No l Roorn Peak Time' Y People Htg CFM Cig CFM S:Exh ;ReghC'FM `Req CFM`
Volume CFM/S ftCFM/S�° ft W Exh9 Act.CFM `.r Act.CEIVh
... .....
.. ..----... --- ---
--- --, - -. ....
.... ... --_._...---._-
.---- --
- _.-----.
10 Storage East
1,566
5,720
23,273
2,200
Direct
Direct
3pm August
11
265
1,019
0
150
150
14,094
0.17
0.65
0
150
150
Room Peak Totals:
1,566
5,720
23,273
2,200
Total Rooms: 1
11
265
1,019
0
150
150
Unique Rooms: 1
14,094
0.17
0.65
0
150
150
Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
Ctivac Full Commercial HVAC Loads Calculation Programs Elrte`Software Development, Inc.
Fort PierceEngineeiinq SLC S isitaton Build,
yw a _'
0
_
Air Handler #3 - AHU 3 - Total Load Summa
Air Handler Description: AHU 3 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of
0.10 HP
Fan Input: 0% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.91
--- This system occurs 1
time(s) in the building. ---
Air System Peak Time: 3pm in August.
Outdoor Conditions: Clg: 95' DB, 80° W13, 131.03 grains, Htg: 420 DB
Indoor Conditions: Clg: 75' DB, 50% RH, Htg: 750 DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss: 5,720 Btuh
Infiltration sensible loss: 0 Btuh
0
CFM
Outside Air sensible loss: 5,341 Btuh
150
CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss:
11,061 Btuh
Heating Supply Air: 5,720 / (.999 X 1.08 X 20) =
265
CFM
Winter Vent Outside Air (56.6% of supply) =
150
CFM
Room space sensible gain: 23,273 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 244 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil:
23,517 Btuh
Cooling Supply Air: 23,517 / (.999 X 1.1 X 21) =
1,019
CFM
Summer Vent Outside Air (14.7% of supply) =
150
CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 3,297 Btuh
150
CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil:
3,297 Btuh
Total sensible gain on air handling system:
26,814 Btuh
Room space latent gain: 2,200 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 6,760 Btuh
Total latent gain on air handling system:
8,960 Btuh
Total system sensible and latent gain:
35,774 Btuh
-
Total Air Handler Supply Air (based on a 21 ° TD):
1,019
CFM
Total Air Handler Vent. Air (14.72% of Supply):
150
CFM
Total Conditioned Air Space:
1,566
Sq.ft
Supply Air Per Unit Area:
0.6507
CFM/Sq.ft
Area Per Cooling Capacity:
525.3
Sq.ft/Ton
Cooling Capacity Per Area:
0.0019
Tons/Sq.ft
Heating Capacity Per Area:
7.06
Btuh/Sq.ft
Total Heating Required With Outside Air:
11,061
Btuh
Total Cooling Required With Outside Air:
2.98
Tons
ZA ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
Chvac =Full°CommerciahWVACLoads CalculatIonjPrograr� Elite Softuvare De4etopm®nt;_Inc.
FortPierce Engineering 'SL"CSO Vi'sitation Buildmgx'
Fort Pierce, FL 34950 . Pic a 11
Air Handler #4 - AHU 4 - Summa Loads
Rrri: 'J Description Area Htg:Loss Sen Gain ;Lat.Gain Htg O A v Clg O A
No ` �� Room Peak Time Peopie Htg.CFM Clg CFM S Exh'Req CFM Req CFM
Volume.. CFM%S� ft.. CFMLS
ft. ,. W.Exh..,.. �:Act.CFM Act.CFM�'
11 Storage West
1,470
7,595
22,632
2,000
3pm August
10
352
983
0
13,230
0.24
0.67
0
12 Office
64
570
1,305
200
9pm August
1
26
57
0
576
0.41
0.89
0
13 RR
48
892
1,228
200
9pm August
1
41
53
0
432
0.86
1.11
0
Room Peak Totals:
1,582
9,057
25,165
2,400
Total Rooms: 8
12
420
1,093
0
Unique Rooms: 3
14,238
0.27
0.69
0
Direct
Direct
139
139
126
135
Direct
Direct
6
6
9
8
Direct
Direct
5
5
15
7
150
150
150
150
ZA ...1SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM
ChYac Full Commercial HVAC Loads Calculation3Program<
Fo t PiercexEnginee inq
�; Elite Software Development ,I'nc
'; SLaSO Visitation-Bwldinq,
woierce. 495
e.
Air Handler #4 - AHU 4 - Total Load Summa
Air Handler Description: AHU 4 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of
0.10 HP
Fan Input: 0% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.91
--- This system
occurs 1 time(s) in the building. ---
Air System Peak Time: 4pm� in August.
Outdoor Conditions: Clg: 950 DB, 800 WB, 131.77 grains, Htg:
42' DB
Indoor Conditions: Clg: 750 DB, 50% RH, Htg: 750 DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Room Space sensible loss: 9,057 Btuh
Infiltration sensible loss: 0 Btuh
0
CFM
Outside Air sensible loss: 5,341 Btuh
150
CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss:
14,398 Btuh
Heating Supply Air: 9,057 / (.999 X 1.08 X 20) =
420
CFM
Winter Vent Outside Air (35.7% of supply) =
150
CFM
Room space sensible gain: 24,955 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 262 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil:
25,217 Btuh
Cooling Supply Air: 25,217 / (.999 X 1.1 X 21) =
1,093
CFM
Summer Vent Outside Air (13.7% of supply) =
150
CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 3,297 Btuh
150
CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil:
3,297 Btuh
Total sensible gain on air handling system:
28,514 Btuh
Room space latent gain: 2,400 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 6,760 Btuh
Total latent gain on air handling system:
9,160 Btuh
Total system sensible and latent gain:
37,674 Btuh
Total Air Handier Supply Air (based on a 210 TD):
1,093
CFM
Total Air Handler Vent. Air (13.73% of Supply):
150
CFM
Total Conditioned Air Space:
1,582
Sq.ft
Supply Air Per Unit Area:
0.6906
CFM/Sq.ft
Area Per Cooling Capacity:
503.9
Sq.ft/Ton
Cooling Capacity Per Area:
0.0020
Tons/Sq.ft
Heating Capacity Per Area:
9.10
Btuh/Sq.ft
Total Heating Required With Outside Air:
14,398
Btuh
Total Cooling Required With Outside Air:
3.14
Tons
Z:\ ...\SLCSO Visitation Building Heat Load.CH8 Thursday, October 29, 2020, 03:06 PM