Loading...
HomeMy WebLinkAboutEnergy CodeFlorida 'Building Code, sixth Edition (2017) Energy Conservation EnergyGauge Summit® Fla/Com-201'7,,'Effective )ate* Dec 31, 2017 IECC;2015 -Total Bulldmg. PerForma:nce Compliance Option . Check List Applications for compliance with the Florida Building Code, Energy Conservation shall include: ❑ This Checklist ❑ The full compliance report generated by the software that contains the project summary, compliance summary, certifications and detailed component compliance reports. ❑ The compliance report must include the full input report generated by the software as contigous part of the compliance report. ❑ Boxes appropriately checked in the Mandatory Section of the complaince report. RECEIVED DEC 17 2020 Permitting Department St. Lucie County �C�yg3L•N8VO �8dCggdJ y v � M� 60982 0 1'r �4 iZ^b EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building -Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 1 of 22 FILE COPY PROJECT SUMMARY Short Desc: Visitation Bldg. Description: SLCSO Visitation Building Owner: St. Lucie County Sheriffs Dept. Addressl: 900 North Rock Road City: Fort Pierce Address2: State: FL Zip: 0 Type: Office Class: New Finished building Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Conditioned Area: 6732 SF Conditioned & UnConditioned Area: 6732 SF No of Stories: 1 Area entered from Plans 0 SF Permit No: 0 Max Tonnage 5 If different, write in: EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 2 of 22 Compliance Summary Component Design Criteria . Result Gross Energy Cost (in $) 3,663.0 4,634.0 PASSED LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? PASSES PASSES PASSES No Entry PASSES No Entry Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 3 of 22 CERTIFICATIONS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code Prepared By: Eric J Svoboda, PE Building Official: Date: 11 ' 7-6 T-0 Date: I certify that this building is in compliance with the Florida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Reg No: Mechanical Designer: Reg No: Plumbing Designer: Reg No: (*) Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 4 of 22 Project: Visitation Bldg. Title: SLCSO Visitation Building Type: Office (WEA File: FL ST LUCIE CO INTL.tm3) Building End Uses 1) Proposed 2) Baseline Total 237.30 349.80 $3, 663 $5,451 ELECTRICITY(MBtulkWhl$) 237.30 349.80 69512 102471 $3,663 $5,451 AREA LIGHTS 52.30 78.10 15312 22884 $807 $1,217 MISC EQUIPMT 101.00 101.00 29591 29591 $1,559 $1,574 PUMPS & MISC 0.10 0.10 15 20 $1 $1 SPACE COOL 59.20 88.00 17331 25771 $913 $1,371 SPACE HEAT 1.10 1.90 335 554 $18 $29 VENT FANS 23.60 80.70 6928 23651 $365 $1,258 Credits Applied: None PASSES Passing Criteria = 4634 Design (including any credits) = 3663 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 67.2% EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 5 of 22 Project: Visitation Bldg. Title: SLCSO Visitation Building Type: Office (WEA File: FL ST LUCIE CO_INTL.tm3) External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) Ext Light 1 Main entries Yes 30.00 6.0 180 60 Ext Light 2 Other (doors) than main entries Yes 20.00 12.0 240 120 Tradable Surfaces: 180 (W) Allowance for Tradable: 1170 (W) PASSES All External Lighting: 180 (W) Complicance check includes a excess/Base allowance of 75O.00(W) Project: Visitation Bldg. Title: SLCSO Visitation Building Type: Office (WEA File: FL ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compliance ID (sq.ft) CP CP PrOZo1Spl 17 Office -Enclosed 6,732 15 3 PASSES PASSES EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 6 of 22 Project: Visitation Bldg. Title: SLCSO Visitation Building Type: Office (WEA File: FL_ST_LUCIE_CO_INTL.tm3) System Report Compliance PrOSyl System 1 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 2 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air 60000 16.50 13.00 8.00 PASSES Cooled Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 34000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1625 0.34 0.82 PASSES System -Supply Constant Volume Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (Sup) PrOSy2 System 2 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air 36000 17.00 13.00 8.00 PASSES Cooled Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 17000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1050 0.35 0.82 PASSES System -Supply Constant Volume Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (Sup) Air Distribution ADS System (Ret) 6.00 PASSES System (Ret) PrOSy3 System 3 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air 48000 17.00 13.00 8.00 PASSES Cooled Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 26000 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1400 0.39 0.82 PASSES System -Supply Constant Volume EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 7 of 22 11 /6/2020 Air Distribution ADS System (Sup) 6.00 4.20 PASSES System (Sup) Air Distribution ADS System (Ret) 6.00 PASSES System (Ret) PASSES Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance None Project: Visitation Bldg. Title: SLCSO Visitation Building Type: Office (WEA File: FL ST LUCIE CO INTL.tm3) Water Heater Compliance Description Type Category Design Min Design Max Comp Eff Eff Loss Loss liance Water Heater 1 Electric water heater <= 12 [kW] 0.98 0.97 PASSES PASSES Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compl- [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in] iance [F] SF.F] None EnergyGauge Summit@ Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option Page 8 of 22 Mandatory Requirements (as applicable) Topic Section Component Des Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission 3tion Yes N/A Exempt Insulation C303.2 Envelope Below -grade wall insulation installed per 00 11 manufacturer's instructions. Insulation C303.2 Envelope Slab edge insulation installed per manufacturer's instructions. Insulation C303.2 Envelope Above -grade wall insulation installed per El manufacturer's instructions. Insulation C402.3 Envelope High-albedo roofs satisfy one of the following: ElXD ❑ 3-year-aged solar reflectance >= 0.55 and thermal emittance >= 0.75 or 3-year-aged solar reflectance index — 64.0. Fenestration C402.4.4 Envelope U-factor of opaque doors associated with the XO building thermal envelope meets requirements. SYSTEM C403.2.12.1 Mechanical HVAC fan systems at design conditions do not ❑X —SPECIFIC exceed allowable fan system motor nameplate hp or fan system bhp. SYSTEM —SPECIFIC C403.2.12.2 Mechanical HVAC fan motors not oversized beyond allowable X❑ ❑ ❑ limits. SYSTEM C403.2.3(8) Table Mechanical Heat Rejection Equipment: Minimum Efficiency ❑ X❑ —SPECIFIC Requirement meet those listed in Table C403.2.3(8) HVAC C403.2.7 Mechanical Exhaust air energy recovery on systems meeting Table C403.2.7(1) and C403.2.7(2). SYSTEM C403.3 Mechanical Air economizers provided where required, meet —SPECIFIC the requirements for design capacity, control signal, ventilation controls, high -limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. SYSTEM C403.3.2 Mechanical Economizer operation will not increase heating 130 —SPECIFIC energy use during normal operation. SYSTEM —SPECIFIC C403.3.4, Mechanical Water economizers provided where required, ❑ Q C403.3.4.1, meet the requirements for design capacity, C403.3.4.2, maximum pressure drop and integrated C403.3.1 economizer control. SYSTEM C403.4.2.1 Mechanical Three -pipe hydronic systems using a common 0 ❑ —SPECIFIC return for hot and chilled water are not used. SYSTEM C403.4.2.3.1 Mechanical Hydronic heat pump systems connected to a 0 13 —SPECIFIC common water loop meet heat rejection and heat addition requirements. SYSTEM C403.4.3.4 Mechanical Open -circuit cooling towers having water cooled —SPECIFIC chiller systems and multiple or vairable speed condenser pumps, are designed so that tower cells can run in parallel with larger of flow crtieria. SYSTEM —SPECIFIC C404.2 Mechanical Service water heating equipment meets efficiency 0 11 ❑ requirements. Wattage C405.3 Interior Lighting Exit signs do not exceed 5 watts per face. Plan Review C103.2 Envelope Plans and/or specifications provide all information ❑ 0 El with which compliance can be determined for the building envelope and document where exceptions. to the standard are claimed. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 9 of 22 Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide ❑ 0 ❑ all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering st Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide ❑ all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufact Plan Review C103.2 Interior Lighting Plans, specifications, and/or calculations provide ❑ ❑ 1-1 all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide 0❑ all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided shoul Insulation C402.2.5 Envelope Slab edge insulation depth/length. Slab insulation ❑ 11 ❑ extending away from building is covered by pavement or >= 10 inches of soil. Insulation C402.2.6 Project Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. HVAC C402.2.6 Mechanical Thermally ineffective panel surfaces of sensible ❑ El ❑ heating panels have insulation >= R-3.5. Insulation C402.2.6 Envelope Radiant panels and associated components, ❑ designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Air Leakage C402.5.7 Envelope Vestibules are installed on all building entrances. 0 11❑ Doors have self -closing devices. SYSTEM C403.2.12.3 Mechanical Fans have efficiency grade (FEG) >= 67. The total 11❑ —SPECIFIC efficiency of the fan at the design point of operation — 15% of maximum total efficiency of the fan. HVAC C403.2.13 Mechanical Unenclosed spaces that are heated use only ❑ ❑ ❑ radiant heat. HVAC C403.2.4.2 Mechanical Each zone equipped with setback controls using automatic time clock or programmable control system. SYSTEM C403.2.4.4 Mechanical Zone isolation devices and controls installed —SPECIFIC where applicable. SYSTEM C403.2.4.7 Mechanical Fault detection and diagnostics installed with ❑ 0 ❑ —SPECIFIC air-cooled unitary DX units having economizers. SYSTEM C403.2.5 Mechanical Hot water boilers supplying heat via one- or —SPECIFIC two -pipe systems include outdoor setback control. HVAC C403.2.6.1 Mechanical Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. SYSTEM SPECIFIC C403.4.1.1 Mechanical Hydronic and multizone HVAC system controls ❑ 0 ❑ areVAV fans driven by mechanical or electrical variable speed drive per Table C403.4.1.1. SYSTEM C403.4.1.3 Mechanical Reset static pressure setpoint for DDC controlled ❑ 0 El —SPECIFIC VAV boxes reporting to central controller based on the zones requiring the most pressure. SYSTEM C403.4.2 Mechanical Temperature reset by representative building —SPECIFIC loads in pumping systems for chiller and boiler systems >500,000 Btu/h. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 10 of 22 SYSTEM —SPECIFIC C403.4.2.3.2.1 Mechanical Closed-circuit cooling tower within heat pump loop ❑ ❑ have either automatic bypass valve or lower leakage positive closure dampers. Open -circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower. Open- or cl SYSTEM —SPECIFIC C403.4.2.4 Mechanical Hydronic systems greater than 500.000 Btu/h designed for variable fluid flow. SYSTEM C403.4.2.5 Mechanical System turndown requirement met through —SPECIFIC multiple single -input boilers, one or more modulating boilers, or a combination of single -input and modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has 3:1 turndown ratio, boiler input between 5.0 SYSTEM C403.4.2.6 Mechanical Chilled water plants with multiple chillers have —SPECIFIC capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant SYSTEM —SPECIFIC C403.4.3, Mechanical Fan systems with motors —7.5 hp associated C403.4.3.2 with heat rejection equipment to have capability to operate at 2/3 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. SYSTEM C403.4.4.5 Mechanical Multiple zone HVAC systems have supply air ❑ —SPECIFIC temperature reset controls. SYSTEM C403.4.4.6 Mechanical Multiple zone VAV systems with DDC of individual —SPECIFIC zone boxes have static pressure setpoint reset controls. SYSTEM C404.2.1 Mechanical Gas -fired water -heating equipment installed in —SPECIFIC new buildings: where a singular piece of water -heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water -heating equipment serve the building wi SYSTEM C404.4 Mechanical All piping insulated in accordance with section —SPECIFIC details and Table C403.2.10. SYSTEM C404.5, C404.5.1, Mechanical Heated water supply piping conforms to pipe ❑ —SPECIFIC C404.5.2 length and volume requirements. Refer to section details. SYSTEM C404.6.3 Mechanical Pumps that circulate water between a heater and —SPECIFIC storage tank have controls that limit operation from startup to — 5 minutes after end of heating cycle. SYSTEM C404.7 Mechanical Water distribution system that pumps water from a —SPECIFIC heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the Wattage C405.5.1 pump upon receiving Exterior Lighting Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Plan Review C405.6 Project Group R-2 dwelling units have separate electrical ❑ ❑ meters. Plan Review C406 Project Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. SYSTEM C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ ❑ ❑ —SPECIFIC means to balance and have pressure test connections. SYSTEM C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have ❑ ❑ El —SPECIFIC means to balance and have pressure test connections. EnergyGauge Summit® Fla/Com-2017, TAM 2017-1.0 Compliant Software, Effective Date; Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 11 of 22 Insulation C303.1 Envelope Roof insulation installed per manufacturer2€TMs instructions. Blown or poured loose -fill insulation is installed only where the roof slope is <=3 in 12. Insulation C303.1 Envelope Building envelope insulation is labeled with El❑ 11 R-value or insulation certificate providing R-value and other relevant data. Fenestration C303.1.3 Envelope Fenestration products rated in accordance with ❑ 0 ❑ NFRC. Fenestration C303.1.3 Envelope Fenestration products are certified as to ❑ ❑ ❑ performance labels or certificates provided. Insulation C303.2, C402.2.4 Envelope Floor insulation installed per manufacturer's ❑ instructions. Cavity or structural slab insulation installed in permanent contact with underside of decking or structural slabs. Insulation C303.2.1 Envelope Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Insulation C303.2.1 Envelope Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Insulation C402.1.3 Envelope Non -swinging opaque doors have R-4.75 ❑ insulation. Insulation C402.2.2 Envelope Skylight curbs are insulated to the level of roofs with insulation above deck or R-5. Insulation C402.2.2 Envelope Insulation intended to meet the roof insulation 0❑ 13 requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Air Leakage C402.5 Envelope Building envelope contains a continuous air barrier that has been tested and deemed to limit air leakage <= 0.40 cfm/ft2. Air Leakage C402.5.1 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.1 Envelope All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize air leakage. Air Leakage C402.5.1.2.1 Envelope The building envelope contains a continuous air ❑ barrier that is sealed in an approved manner and material permeability <= 0.004 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.1.2.2 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and average assembly air leakage — 0.04 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.5.2, C402.5.4 Envelope Factory -built fenestration and doors are labeled as 0 0❑ meeting air leakage requirements. Air Leakage C402.5.3 Envelope Where open combustion air ducts provide 0❑ ❑ combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope Air Leakage C402.5.5, Envelope Stair and elevator shaft vents have motorized C403.2.4.3 dampers that automatically close. Air Leakage C402.5.5, Envelope Outdoor air and exhaust systems have motorized ❑ C403.2.4.3 dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Air Leakage C402.5.6 Envelope Weatherseals installed on all loading dock cargo ❑ ❑ ❑ doors. Air Leakage C402.5.8 Envelope Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 12 of 22 HVAC C403.2.1 Mechanical HVAC systems and equipment design loads calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure SYSTEM —SPECIFIC C403.2.10 Mechanical HVAC piping insulation thickness. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. HVAC C403.2.3 Mechanical HVAC equipment efficiency verified. 1:1 El SYSTEM —SPECIFIC C403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 42 in. labeled for replacement only as per Footnote b to Table C403.2.3(3). SYSTEM —SPECIFIC C403.2.4.1 Mechanical Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. SYSTEM —SPECIFIC C403.2.4.1.1 Mechanical Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A°F deadband. HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 A°F deadband. ❑ HVAC C403.2.4.1.3 Mechanical Temperature controls have setpoint overlap restrictions. HVAC C403.2.4.2.1, Mechanical Automatic Controls: Setback to 55°F (heat) and C403.2.4.2.2 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup SYSTEM —SPECIFIC C403.2.4.2.3 Mechanical Systems include optimum start controls. HVAC C403.2.4.5, Mechanical Snowfice melting system sensors for future C403.2.4.6 connection to controls. Freeze protection systems have automatic controls installed. HVAC C403.2.6.2 Mechanical Enclosed parking garage ventilation has automatic ❑ ❑ contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. HVAC C403.2.9 Mechanical HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. SYSTEM —SPECIFIC C403.2.9.1.3 Mechanical Ductwork operating >3 in. water column requires air leakage testing. SYSTEM —SPECIFIC C403.4.1.2 Mechanical VAV fans have static pressure sensors located so controller setpoint —1.2 w.c.. SYSTEM —SPECIFIC C403.4.2.2 Mechanical Two -pipe hydronic systems using a common distribution system have controls to allow a deadband >=150F, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to < 30 OF. SYSTEM —SPECIFIC C403.4.2.3.3 Mechanical Two -position automatic valve interlocked to shut off water flow when hydronic heat pump with pumping system >10 hp is off. SYSTEM C403.4.4.5, Mechanical Zone controls can limit simultaneous heating and —SPECIFIC C403.4.4.5.1-4 cooling and sequence heating and cooling to each SYSTEM —SPECIFIC C403.4.5 zone. Mechanical Condenser heat recovery system that can heat water to 850F or provide 60% of peak heat rejection is installed for preheating of service hot water. SYSTEM —SPECIFIC C403.4.6 Mechanical Hot gas bypass limited to: < 240 kBtu/h - 50% capacity, >240 kBtu/h - 25% capacity SYSTEM —SPECIFIC C404.3 Mechanical Heat traps installed on non -circulating storage water tanks. SYSTEM_SPECIFIC C404.3 Mechanical Heat traps installed on supply and discharge piping of non -circulating systems. SYSTEM —SPECIFIC C404.3 Mechanical Heat traps installed on supply and discharge ❑ El 11 piping of non -circulating systems. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 13 of 22 SYSTEM SPECIFIC C404.6.1 Mechanical Controls are installed that limit the operation of a ❑ ❑ recirculation pump installed to maintain temperature of a storage tank. System return pipe Is a dedicated return pipe or a cold water supply SYSTEM SPECIFIC C404.6.1, C404.6.2 pipe. Mechanical Automatic time switches installed to automatically El ❑ ❑ switch off the recirculating hot-water system or SYSTEM SPECIFIC C404.9.1 heat trace. Mechanical Pool heaters are equipped with on/off switch and - no continuously burning pilot light. SYSTEM SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and El 0❑ pumps. SYSTEM SPECIFIC C404.9.2 Mechanical Time switches are installed on all pool heaters and ❑ El pumps. SYSTEM SPECIFIC C404.9.3 Mechanical Vapor retardant pool covers are provided for heated pools and permanently installed spas. Controls C405.2.1 Interior Lighting Lighting controls installed to uniformly reduce the lighting load by at least 50%. Controls C405.2.1 Interior Lighting Occupancy sensors installed in required spaces. El 0❑ Controls 0405.2.1, Interior Lighting Independent lighting controls installed per C405.2.2.3 approved lighting plans and all manual controls readily accessible and visible to occupants. Controls C405.2.2.1 Interior Lighting Automatic controls to shut off all building lighting installed in all buildings. Controls C405.2.3 Interior Lighting Daylight zones provided with individual controls ❑ ❑ that control the lights independent of general area Controls C405.2.3, lighting. Interior Lighting Primary sidelighted areas are equipped with C405.2.3.1, required lighting controls. C405.2.3.2 Controls C405.2.3, Interior Lighting Enclosed spaces with daylight area under C405.2.3.1, skylights and rooftop monitors are equipped with C405.2.3.3 required lighting controls. Lighting Separate lighting control devices for specific uses 11 El Controls C405.2.4 Interior installed per approved lighting plans. Wattage C405.2.4 Interior Lighting Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Controls C405.2.5 Exterior Lighting Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time -of -day, or reduce connected lighting > 30%. Wattage C405.4.1 Interior Lighting Interior installed lamp and fixture lighting power is 0 El consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Mandatory Additional C406.4 Project Enhanced digital lighting controls efficiency ❑ ❑ package: Interior lighting has following enhanced lighting controls in accordance with Section C405.2.2: Luminaires capable of continuous dimming and being addressed individually, <= 8 luminaires Mandatory Additional C406.6 controlled in Project Dedicate outdoor air system efficiency package: Buildings with hydronic and/or multiple -zone HVAC systems are equipped with an independent ventilation system designed to provide >_ 100-percent outdoor air to each individual occupied space, as specified by Mandatory Additional C406.7, C406.7.1 Project Enhanced Service Water Heat System efficiency package. One of the following SWH system enhancements must satisfy 60 percent of hot water requirements, or 100 percent if the building otherwise complies with heat recovery per Section C403.4.5: Waste heat re HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means for air balancing. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 14 of 22 HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means 0❑ for air balancing. Testing C408.2.3.2 Mechanical HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Post Construction C303.3, C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and 0 L1❑ equipment to the building owner or designated representative. Post Construction C303.3, C408.2.5.3 Mechanical Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Fenestration C402.4.2.2 Envelope Skylights in office, storage, automotive service, ❑ ❑ ❑ manufacturing, non -refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Post Construction C408.2.1 Mechanical Commissioning plan developed by registered ❑ ❑ ❑ design professional or approved agency. Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure proper operation. Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper ❑ ❑ ❑ operation. Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and certified by registered design professional or approved agency. Post Construction C408.2.5.1 Mechanical Furnished HVAC as -built drawings submitted ❑ within 90 days of system acceptance. Post Construction C408.2.5.1 Interior Lighting Furnished as -built drawings for electric power ❑ ❑ systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is 13 11❑ provided for HVAC systems. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner within 90 days of receipt of certificate of Post Construction C408.3 Interior Lighting occupancy. Lighting systems have been tested to ensure ❑ ❑ 0 proper calibration, adjustment, programming, and operation. EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code,'Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 15 of 22 Input Data Report Proiect Information Project Name: Visitation Bldg. Project Title: SLCSO Visitation Building Address: 900 North Rock Road State: FL Zip: 0 Owner: St. Lucie County Sheriffs Dept. Building Type: Office Building Classification: New Finished building No.of Stories: 1 GrossArea (SF): 6,732 Bldg. Rotation: None Zones No Acronym Description Type Area Multi [sfl Total Area Isf] 1 PrOZol Zone 1 CONDITIONED 6731.9 1 6731.9 ❑ Spaces No Acronym Description Type Depth [ft] Width HeightMult Total IN IN Area [sf1 Total Vol[cf] In Zone: PrOZol 1 PrOZo1Spl Zo0Sp1 Office - Enclosed 57.05 118.00 9.00 1 6731.9 60587.1 ❑ Lighting No Type Category No. of Watts per Luminaires Luminaire Power Control Type [W] No.of Ctrl pts In Zone: PrOZol In Space: Pr0Zo1Sp1 1 LED General Lighting 1 5000 5000 Occupancy sensor without Daylighting 15 ❑ EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 16 of 22 Walls (Walls will be rotated clockwise by building rotation value) No Description Type Width H (Effec) Multi Area Orient Cond- Heat Dens. R-Value [ft] [ft] plier [sf] ation uctance Capacity [lb/cf] [h.sf.FBtu] [Btu/h.sf.F] [Btu/sf.F] In Zone: PrOZol 1 PrOZo1Wa1 5/8" stucco 118.00 12.00 1 1416.0 North 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 2 PrOZo 1 Wa2 5/8" stucco 118.00 12.00 1 1416.0 South 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 3 PrOZo1Wa3 5/8" stucco 58.00 12.00 1 696.0 East 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp 4 PrOZo1Wa4 5/8" stucco 58.00 12.00 1 696.0 West 0.2067 5.731 34.65 4.8 ❑ /8"CMU/3/4"ISO BTWN24"oc/.5" Gyp Windows (Windows will be rotated clockwise by building rotation value) No Description Orientation Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F] IN [ft] plier [sf] In Zone: PrOZol In Wall: East 1 PrOZo1Wa3Wil East No 1.2500 0.82 0.76 4.00 3.00 2 24.0 ❑ 2 PrOZo1Wa3Wi2 East No 1.2500 0.82 0.76 6.00 8.00 1 48.0 ❑ In Wall: North 1 PrOZo1Wa1Wi1 North No 1.2500 0.82 0.76 4.00 3.00 1 12.0 ❑ In Wall: South 1 PrOZo1Wa2Wil South No 1.2500 0.82 0.76 4.00 3.00 1 12.0 ❑ EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date; Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 17 of 22 Doors No Description Type Shade? Width H (Effec) Multi Area Cond. Dens. Ht Cap. R IN IN plier [sf] [Btu/h.sf.F] [lb/cf] [Btu/sf. [h.sf.F/ F] Btu] In Zone: PrOZol In Wall: North 1 PrOZo1Wa1Drl Solid core flush No 3.00 7.00 l 21.0 0.6061 0.00 0.00 1.65 ❑ (1.75") In Wall: South 1 PrOZolWa2Drl Solid core flush No 3.00 7.00 1 21.0 0.6061 0.00 0.00 1.65 ❑ (1.75") In Wall: West 1 PrUol%4Drl Solid core flush No 3.00 7.00 1 21.0 0.6061 0.00 0.00 1.65 ❑ (1.75") Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value IN [ft] plier [sf] [deg] [Btu/h.Sf. F] [Btu/sf. F] [lb/cf] [h.sf.FBtu In Zone: PrOZol 1 PrOZoIRfl Mtl Bldg Roof/R-19 118.00 57.05 1 6731.9 0.00 0.0492 1.34 9.49 20.3 ❑ Batt Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multi- Area Total Area [Btu/hr sf F] IN IN plier [Sf] [Sf] In Zone: In Roof. ■01 EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 18 of 22 Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] . [ft] plier [sf] [Btu/h.sf.F [Btu/sf. F] [lb/cf] [h.sf.F/Btu In Zone: PrOZol 1 Pr0Zo1Fll 1 ft. soil, concrete 118.00 57.05 1 6731.9 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad Systems PrOSyl System 1 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr 2 Component Category Capacity Efficiency IPLV 1 Cooling System 60000.00 16.50 8.00 ❑ 2 Heating System 34000.00 1.00 ❑ 3 Air Handling System -Supply 1625.00 0.34 ❑ 4 Air Distribution System (Sup) 6.00 ❑ PrOSy2 System 2 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr 1 Component Category Capacity Efficiency IPLV 1 Cooling System 36000.00 17.00 8.00 ❑ 2 Heating System 17000.00 1.00 ❑ 3 Air Handling System -Supply 1050.00 0.35 ❑ 4 Air Distribution System (Sup) 6.00 ❑ 5 Air Distribution System (Ret) 6.00 ❑ PrOSy3 System 3 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr 1 Component Category Capacity Efficiency IPLV 1 Cooling System 48000.00 17.00 8.00 ❑ 2 Heating System 26000.00 1.00 ❑ 3 Air Handling System -Supply 1400.00 0.39 ❑ 4 Air Distribution System (Sup) 6.00 ❑ 5 Air Distribution System (Ret) 6.00 ❑ EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 19 of 22 Plant Equipment Category Size Inst.N(Eff. IPLV Water Heaters W-Heater Description Capacity Cap.Unit I/P Rt. Efficiency Loss 1 Electric water heater 1 [Gal] 2 [kW] 0.9800 [Ef] [Btu/h] ❑ Ext-Lighting Description Category No. of Watts Lumin- per aires Lumin- Area/Len/No [sf/ft/No] Control Wattage Type [W] a Ext Light 1 2 Ext Light 2 Main entries 2 30 Other (doors) than main 4 30 entries 6.00 Photo Sensor contrc 60.00 ❑ 12.00 Photo Sensor contrc 1####; ❑ Piping No Type Operating Insulation Temp Conductivity [F] [ Btu-in/h.sf.F] Nomonal pipe Diameter [in] Insulation Is Thickness Runout? [in] EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 20 of 22 Fenestration Used Name Glass Type No. of Glass SHGC VLT Conductance Panes [Btu/h.sf.F] ASHULSgIC1rA1 User Defined 1 1.2500 0.8200 0.7600 IFrm Materials Used Only RValue Thick Cond- Density Sp. Heat Mat No Acronym Description R-Value [h.sf.FBtu] IN uctivity [lb/cf] [Btu/1b.F Used [Btu/h.ft.F 187 Mat1187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 ❑ BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 268 Mat1268 0.625" stucco No 0.1302 0.0521 0.4000 16.00 0.2000 ❑ 42 Mat142 8 in. Lightweight concrete No 2.0212 0.6670 0.3300 38.00 0.2000 ❑ block 269 Mat1269 .75" ISO BTWN24" oc No 2.2321 0.0625 0.0280 4.19 0.3000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 278 Mat1278 Solid core flush (1.75") Yes 1.6500 ❑ 94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 3/81N EnergyGauge Summit@) Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 21 of 22 Constructs Used Simple Massless Conductance Heat Cap Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.F/Btu] 1011 5/8" stucco /8"CMU/3/4"ISO No No 0.21 5.73 34.65 4.8 0 BTWN24"oc/.5" Gyp Layer Material Material Thickness Framing No. [ft] Factor 1 268 0.625" stucco 0.0521 0.000 ❑ 2 42 8 in. Lightweight concrete block 0.6670 0.000 3 269 .75" ISO BTWN24" oc 0.0625 0.000 ❑ 4 187 GYP OR PLAS BOARD,1/2IN 0.0417 0.000 El Simple Massless Conductance Heat Cap Density RValue No Name Construct Construct [Btu/h.sfF] [Btu/sf.F] [lb/cf] [h.sfFBtu] 1027 Solid core flush (1.75") No Yes 0.61 1.7 Layer Material Material Thickness Framing No. [ft] Factor 1 278 Solid core flush (1.75") 0.000 ❑ Simple Massless Conductance Heat Cap Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.F/Btu] 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 El Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.F/Btu] 1057 1 ft. soil, concrete floor, carpet and No No 0.27 34.00 113.33 3.7 El rubber pad Layer Material Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 EnergyGauge Summit® Fla/Com-2017. TAM 2017-1.0 Compliant Software. Effective Date: Dec 31, 2017 Florida Building Code, Sixth Edition (2017) - Energy Conservation IECC 2015 - Total Building Performance Compliance Option 11/6/2020 Page 22 of 22