THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. A CONCRETE REPAIRS
5151 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2103-0590
PROJECT NAME: Ocean Harbor N. Condos – Bldg. A DATE: May 6, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED: Units 215/315, 315/415, 415/515, 811
OBSERVATIONS:
Units 215/315, 315/415 & 415/515
• Shoring is in place as specified on the permit drawings.
• The contractor has chipped and removed all loose concrete adjacent to the sliding glass doors.
• The deteriorated areas require a full-depth repair.
• Corrosion was found on the slab reinforcing bars as well as the top beam reinforcing under the sliding glass
door track.
• The doors were not removed, but access to the interior of the unit was necessary to place the form boards.
RECOMMENDATIONS:
Units 215/315, 315/415 & 415/515
• Place additional reinforcing bars lapped with the existing.
• All bars shall be power tool cleaned and painted with a corrosion inhibitor.
• Form and pour repair areas with a high strength repair mortar and provide proper clearance for all
reinforcing bars.
OBSERVATIONS:
Unit 811
• There is a visible ceiling spall and cracks at the north end of the balcony edge supporting the perimeter
parapet wall.
• The contractor removed the loose stucco and exposed visible corrosion in the bottom reinforcing bars.
• We inspected the roof and parapet wall above and found (3) areas where water is ponding under the roofing
membrane, which appears to be contributing to the concrete deterioration.
RECOMMENDATIONS:
Unit 811
• Shore the balcony edge at 4-feet maximum.
• Have a licensed roofing contractor repair the roof membrane along the parapet wall.
• Repair the ceiling in 2-foot sections between post shores and relocate shores where the slab is being repaired.
All work to date is in compliance with recommendations as indicated in the permitted documents.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten, Inspector
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-249A Report No. 1
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 2 of 2
Pic 1
Unit 315
Full depth repair adjacent to sliding glass door.
Pic 2
Unit 515
Full depth repair adjacent to sliding glass door.
Pic 3
Unit 811
Ceiling spall under parapet wall.