Loading...
HomeMy WebLinkAboutcompaction testUES Project No: Workorder No: Report Date: 3315.2000020.0000 232454-1 04/30/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client:Century Complete Homes UES Technician:Mark Rogers 1155 Malabar Road, NE Suite 8 Palm Bay, FL 32907 Date Tested:04/30/2021 Project:Century Complete Saint Lucie County Various Locations, Port St. Lucie, St. Lucie County, FL Type of Test: Area Tested:7801 James Drive - House Pad Field:ASTM D-6938 Nuclear Gauge Method Material:Backfill Laboratory:ASTM D1557 Modified Proctor Reference Datum:0 = Top of Fill The tests below meet the 95% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Pass or Fail 1 Northeast corner of lot 0-1 ft 110.2 11.1 106.5 10.6 97 Pass 2 Southwest corner of lot 0-1 ft 110.2 11.1 107.3 10.8 97 Pass 3 Center of lot 0-1 ft 110.2 11.1 106.7 10.8 97 Pass Remarks:Above stripped surface 1-2’, 2-3’ HCP=60+, > 95 % Compaction, PASS. HCP tests are empirically correlated to the relative density of the soil. Reviewed By GFA International, Inc FBPE Registry No.4930 John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No. 63218 This item has been digitally signed and sealed by John Kent on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1