Loading...
HomeMy WebLinkAboutCompaction TestHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 May 14, 2021 CONTRACTOR: JOB LOCATION: PERMIT #: To Whom it may concern, J.M. Reid Construction 4220 70th Ave Vero Beach, Florida 32967 10511 Oakbridge Court Fort Pierce, Florida 2102-0513 J Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB # : 203398-2d/JM/bm Enclosed, please find the nuclear density test results performed on the 2nd Lift for the Main House & Detached Garage at the above referenced project. Should you have any questions, please feel free to contact our office. Respectfully, This Item has been electronlca l ly signed and sealed by Bryan E. Dahlke, PE FL Lic. 81439 on the date stated directly to the right using a digital signature. Printed copies of this documents are not nsidered signed and sealed and the signature must be verified on any electronic copies. Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 05/14/21 Email: julian@jmreidconstruction.com Digitally signed by Bryan E Dahlke Date: 2021.05.14 08:42:32 -04'00' Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE Headquarters 1W C IL � ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 1 %% AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: May 13, 2021 KSM JOB #: 203398-2d/JM/bm PERMIT #: 2102-0513 NUC # 215 Nuc Model: MC-IDR-P CONTRACTOR: J.M. Reid Construction Nuc Serial #: MD80404215 JOB LOCATION: 10511 Oakbridge Court Fort Pierce, Florida ITEM TESTED: 2nd Lift for the Main House & Detached Garage TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION House 1 N.E. 0" - 12" 15D 107.9 108.6 99.4% 2 S.E. 16D 108.3 99.7% 3 Center 15D 107.5 99.0% 4 S.W. 14D 105.9 97.5% 5 N.W. 14D 106.2 97 8°% Garage 6 N.E. 0" - 12" 15D 106.8 98.3% 7 Center 15D 107.7 99.2% 8 S.W. 14D 106.0 97.6% Soil Description: Dark Brown Soil In Place Moisture: 15.0 % Proctor Optimum Moisture: 12.0 % Proctor Max. Dry Density: P.C.F. 108.6 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Disclaimer: Contractor is responsible to maintain Minimum Requirement the tested area in the condition that KSM for Staked Foundation completed the indicated passed compaction test. KSM is not responsible if the tested area has been Bryan E. Dahlke, P.E. V.P. of Engineering altered from the approved inspected condition. PE# 81439 5/14/2021 Email: julian@jmreidconstruction.com Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE Headquarters 1W C Sk � ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 17 LVL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 KSMengineering.net DATE TESTED: PERMIT #: CONTRACTOR: JOB LOCATION: W E I G H T P C F D R Y May 13, 2021 2102-0513 J.M. Reid Construction 10511 Oakbridge Court Fort Pierce, Florida KSM JOB # : 203398-2d/JM/bm 110.0 I I I I I I I I I I I I I I I 109.0..—....—..-1.—..—...—..—..�..—..�..—..—, I I I I I I I 108.0—..—.. �..—..—�.—..—..� —.. �.—�.—..— .� —.. �..—..—. I I I I I I I I I I I I I I 107.0..—....—..—j.—..—...—..—..�....—..—, I I I I I I I 106.0 .—..—._..1.._..-1.—..—..L_.._..1..—..—. I I I I I I I I I I I I I I I 105.0 i —.. i..—.. I.—..—..i —.. i..—..—i.—.....i —.. i..—..—. I I I I I I I I 104.0..—....—..—.—..—....—....—..—j.—..—..�..—....—..—. I I I I I I I I 103.0--..—.. �..—..—�.—..—..� —.. �..—..—�.—..—..� —.. �..—..—� 7 8 9 10 11 12 13 14 15 Moisture - % of Dry Weight Soil Description: Dark Brown Soil Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 108.6 Bryan E. Dahlke, P.E. V.P. of Engineering PE# 81439 5/14/2021 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE