HomeMy WebLinkAbout6880 Bronte WorksheetSTs LUCIE WORKS
Section A (General Information)'
Master Permit No.
Process No.
Contractors Name. 0//)
Job Address
[]Low Slope
0 Asphaltic Shingles
E3 New roof
1:1 Repair
Low Slope Roof Area (SF)
C-7enerici
9�,LOrr
-(qticen #
ROOF CATEGORY
El Mechanically Fastened Tile
VMeta! Panel/Shingles
e-2,�r) n
E3 Mortar/Adhesive Set Tiles
0WOod Shingies/Shakes
C3 Prescriptive 13UR-RAS 150
ROOF ROOF TYPE
� Maintenance 1300"Rero of i ng
ROOF SYSTEM INFORMATION
Steep Sloped Roof Area (SF)
Section B (Roof Plan)
E3 Recovering
Total (SF)
Sketch Roof Plan: Illustrate all levels and sect4F
ions, roof drains'. scuppers, overflow scuppers and overflow drains,. Include
dimensions of sections and levels., clearly identify dimensions of V S ure zones and location of parapets.
i
1
i
-
a
P
Cd
to
z
Z
0
LL
0
0
F 3
c
0
aD
I
T-
LO
,r--
C\l
13
00
00
0")
oc,
LO
CY)
0
00
CY)
T`
zs
h
rir
LO
co
N
(D
m
co
•l-.3
3
LO
LO
£
I
sr. LUCIE WORKS
Section D (Steep Slope Roof System)
Roof System Manufacturer:
Notice of Acceptance Number:
0.01
Minimum Design Wend Pressures, If Applicable (From RAS 127 or Calculations):
Zone 1: Zone 2e: Zone fin: Zane 2r. Zone 3e: Zone 3r: