Loading...
HomeMy WebLinkAbout201206-2d compaction REVISED - signed.pdfHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #:201206-2d/JM/ah NUC #215 Nuc Model:MC-1DR-P Nuc Serial #:MD80404215 7106 Banyan Street Ft. Pierce, Florida Compacted Foundation Fill - Detached Garage DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1 S.W.0" - 12"13D 107.1 110.5 96.9% 2 N.W."12D 106.0 "95.9% 3 Center "14D 108.2 "97.9% 4 N.E."13D 106.4 "96.3% 5 S.E."13D 107.5 "97.3% Proctor Optimum Moisture: Proctor Max. Dry Density: P.C.F. @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets 5/14/2021 for Unstaked Foundation JOB LOCATION: Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Brown Sand In Place Moisture: SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 April 30, 2021 May 14, 2021 DATE TESTED: PERMIT #: CONTRACTOR:D & M Concrete 2012-0403 Bryan E. Dahlke, P.E. V.P. of Engineering REVISED: PERMIT ADDED Soil Description: ITEM TESTED: 110.5 TEST LOCATION OF SAMPLE Email to: PE # 81439 9.1% 12.0% Respectfully Submitted: Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test.KSM is not responsible if the tested area has been altered from the approved inspected condition. Proudly Serving Florida since 1990 Certified Women Owned Business - WBE Minimum Requirement 105.0 106.0 107.0 108.0 109.0 110.0 111.0 112.0 7 8 9 10 11 12 13 14 15 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight