HomeMy WebLinkAboutCreekside Lot 42-Wall Sheathing.pdf[BUNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date:
S'—/z-z/
Project: < 12 -j0-/C S 1 De —
Address: 3 Z Z 1%L r Ty CI rL
�2
Check one:
X Regular Inspection:
Permit No. ?0 / l - U 1 ry 9
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
)C
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Groun
I
IStorm Piping &Test
i
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: _ / 3 S (,u A C-C La A -TL. w �
Inspection Results: KAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: 4�_'k- (f.JgLC A-^'d �,4s7eNe R s
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: Lic.#: /jti 46915
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com