Loading...
HomeMy WebLinkAboutCreekside Lot 42-Wall Sheathing.pdf[BUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: S'—/z-z/ Project: < 12 -j0-/C S 1 De — Address: 3 Z Z 1%L r Ty CI rL �2 Check one: X Regular Inspection: Permit No. ?0 / l - U 1 ry 9 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling )C Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Groun I IStorm Piping &Test i Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: _ / 3 S (,u A C-C La A -TL. w � Inspection Results: KAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 4�_'k- (f.JgLC A-^'d �,4s7eNe R s 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: /jti 46915 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com