HomeMy WebLinkAboutCreekside Lot 78-Dryin.pdf6� Universal
Engineering
Sciences
1 Company INSPECTION RESULTS
R/YAT�aNP
Inspection Date: -5-' I Z- z I Permit No. ; C/ i - 1 7
Project: 5 D �_
Address: 33 z 9
98
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
I Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: /3 '�-
Inspection Results: %AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: CK A44-T�..c ee5 -4 a �4zr� en
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: -G Lic.#: AA3 '-L(o 8g
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com