Loading...
HomeMy WebLinkAboutCreekside Lot 78-Dryin.pdf6� Universal Engineering Sciences 1 Company INSPECTION RESULTS R/YAT�aNP Inspection Date: -5-' I Z- z I Permit No. ; C/ i - 1 7 Project: 5 D �_ Address: 33 z 9 98 Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test I Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: /3 '�- Inspection Results: %AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: CK A44-T�..c ee5 -4 a �4zr� en 1. 2. 3. 4. 5. 6. 7. Inspector's Name: -G Lic.#: AA3 '-L(o 8g OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com