HomeMy WebLinkAboutSubsurface InvestigationWr OIL
d VIL
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
December 11, 2018
Jim Wright
P.O. Box 420495
Summerland Key, FL 33042
Re: 6400 Koblegard Road
Fort Pierce, Florida
KSM Project #: 184193-b
Dear Mr. Wright:
As requested, KSM Engineering & Testing has performed a subsurface investigation at
the referenced site. Presentation of the data gathered during the investigation, together
with our geotechnical related opinions, are included in this report.
A. Site Description:
At the time of drilling, the proposed construction area was fairly flat with light surface
vegetation (grass).
B. Project Description:
A single-family residence is planned to be constructed on the site. Loads from the
structure will be transferred to the ground by conventional shallow footings. We
estimate the maximum loads will be less than 2,500 pounds per linear foot along the
wall foundation.
Some site fill may be required to reach the desired grades.
C. The scope of our study consisted of the following:
1. Performed Standard Penetration Test Borings in the proposed construction area
to estimate the subsoil relative density.
2. Measured the groundwater level at each boring.
3. Evaluated the existing soil conditions with respect to the proposed construction
and provided recommendations for site preparation and foundation design.
4. Prepared this reportto document our findings. ::
F�.b
^
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
F
KELLER, SCHLEICHER & MaCWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
6400 Koblegard Road -2- December 11, 2018
Fort Pierce, Florida
D. Site Investigation:
The site investigation program consisted of performing four (4) Standard Penetration
Test borings (SPT), in the proposed construction area. The SPT borings were
terminated at depths of 10 to 14 feet below grade. The locations of the borings are
indicated on the attached boring logs.
The SPT borings were completed in accordance with procedures described in ASTM D-
1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by
successive blows of a 140 pound hammer freely falling 30 inches. The number of
blows required to drive the sampler 1 foot, after seating 6 in., is designated the
Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from
the ground and opened to allow visual examination and classification of the retained
soil sample. Also, the groundwater table was allowed to stabilize and the depth of the
groundwater elevation recorded from existing grade.
The records of the soils encountered, the penetration resistances and groundwater
level are shown on the attached logs.
E. Engineering Evaluation and Conclusions:
Based on the information obtained from this site investigation, we are pleased to offer
the following evaluation:
The boring logs indicate the subsurface conditions soils consist mostly of fine-grained
sand and fine-grained clayed sand. Shell fragments were also found in the borings.
"N" values recorded during the boring operation indicate the soil density is generally
medium dense. Please refer to the soil boring logs for specific information relative to
the soil description.
Based on the existing soil conditions, the proposed structure can be supported on a
shallow foundation system provided that the site is properly prepared.
The following sections provide recommendations for the site preparation and foundation
design.
Ronald G. Keller, P.E.: 37293 / SI Lie. No.: 860 / Julie E. Keller, P.E.: 68366
KELLER, SCHLEICHER & MaCWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
6400 Koblegard Road -3- December 11, 2018
Fort Pierce, Florida
F. Typical Site Preparation:
The proposed building area and areas to be paved, plus a minimum margin of five feet
beyond the proposed construction shall be stripped and grubbed of surface debris,
including vegetation, roots and organic matter. The building area should be graded
level and proofrolled. Any soft yielding areas shall be excavated and replaced with
clean compacted fill. Sufficient passes should be made during compaction operations
to produce a density no less than 95 percent of its modified dry Proctor value (ASTM D
1557) to a depth of two feet.
After the exposed surface has been proofrolled, the building and pavement areas may
be filled to the desired grades. The fill material shall consist of clean granular sand
containing less than 10% material passing the U.S. Standard No. 200 mesh sieve.
Place structural fill in loose layers of 12 inches or less in thickness and compact each
lift to at least 95 percent of its modified dry Proctor value.
After excavating for the footings, the disturbed footing subgrade should be recompacted
to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved
by making several passes with a relatively light -weight walk -behind vibratory sled or
roller.
G. Foundation:
Provided that our recommendations for site preparation are followed, the proposed
residence may be supported on conventional concrete, steel reinforced footings
designed for an allowable soil bearing pressure of 2,500 pounds per square foot, or
less.
With the foundation properly designed and the site properly prepared, we anticipate
total settlements less than % of an inch and differential settlement of less than '/a of an
inch. The majority of the settlement should occur during construction.
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
ll, s
"QAVJL
KELLER, SCHLEICHER & MacWILLIAIVI ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
6400 Koblegard Road -4- December 11, 2018
Fort Pierce, Florida
H. Floor Slabs:
A conventional slab -on -grade can be used in the "at grade" portion of the residence.
We recommend the disturbed subgrade below the floor slab be re -compacted to 95
percent of the modified Proctor maximum dry density (ASTM D 1557) prior to
placement of the concrete. An estimated modulus of subgrade reaction of 150 pounds
per cubic inch (pci) can be used for design of the slab -on -grade. We recommend that
expansion or control joints be incorporated in the slab at frequent intervals to control
shrinkage cracks.
A moisture barrier is recommended beneath the floor slab to prevent moisture migration
from the underlying soil resulting in dampness of the slab.
I. Closure:
This report has been prepared in accordance with generally accepted soil and
foundation engineering practices based on the results of the test borings and the
assumed loading conditions. No warranties, either expressed or implied, are intended
or made. This report does not reflect any variations which may occur between the
borings. If variations appear evident during the course of construction, it would be
necessary to re-evaluate the recommendations of this project.
Environmental conditions, wetland delineation, water quality, and municipal
requirements are not a part of this report.
We are pleased to be of assistance to you on this phase of your project. When we may
be of further service to you or should you have any questions, please feel free to
contacl thq,office.
n
;frrfill
E-mail to: jimwrightthr@gmail.com
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
KSM Engineering & Testing BORING NUMBER B_1
P.O. Box 78-1377
Sebastian, FL 32978 PAGE 1 OF 1
KSM
Tel: (772)-589-0712
Fax: (772)-589-6469
CLIENT Jim Wright PROJECT NAME 6400 Koblegard Road
PROJECT NUMBER 184193-b PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 12/5/18 COMPLETED 12/5118 GROUND ELEVATION HOLE SIZE inches
DRILLING CONTRACTOR GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample �ZAT TIME OF DRILLING 5.83 ft
LOGGED BY DP/CH CHECKED BY JEK AT END OF DRILLING ---
NOTES See Attached Location Plan AFTER DRILLING --
w
® SPT N VALUE
U
U) W
20 40 60 80
PL MC LL
�—�
M�
EL �
=c9
o- O
MATERIAL DESCRIPTION
Wm
� �
wo
> 0
0z�
Z)¢
W .4
~�
z CL
D"
WW
��
o �
O�
v
m0>
Y`"
20 40 60 80
❑ FINES CONTENT (%) ❑
O
< z
W
V?
0
0
Brown Sand with Roots
Gray Sand
SS
8-7-9
;..•..
:.. :..
Light Brown Sand
SS
7-7-8
:.:
(15)
5
:..
..........................
............
::
V Grayish Brown Clayed Sand
6-5-6
-
SS
•;
:..
......... ............................
:....... :....... :.......
SS(8)
5-4-4
.......
10
n(8)
:.'.:
`
:....... :....... :....... :.......
SS
4-3-5
n
:.
SS
4-5-4
( 9)
.... .... .... ....
Gray Sand with Traces of Some Shell
SS
4-6-6
u
o::
:....... :....... ....... :.......
12
( )
Bottom of borehole at 14.0 feet.
KSM Engineering & Testing
BORING NUMBER B02
�j� 7i14�1 P.O. Box 78-1377
PAGE 1 OF 1
11 Sebastian, FL 32978
Tel: (772)-589-0712
Fax: (772)-589-6469
CLIENT Jim Wright
PROJECT NAME 6400 Koblegard Road
PROJECT NUMBER 184193-b
PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 12/5/18 COMPLETED 12/5/18
GROUND ELEVATION
HOLE
SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
Q AT TIME OF DRILLING 5.83 ft
LOGGED BY DP/CH CHECKED BY JEK
AT END OF DRILLING ---
NOTES See Attached Location Plan
AFTER DRILLING --
® SPT N VALUE S
U
>- iy
~m
>- _
it
w
�z�
w
~�
20 40 60 80
PL MC LL
wv
=C7
a 0
��
MATERIAL DESCRIPTION
g
o
> W
O-
¢
Fa-�
W 2
Ye
z Q
D�
20 40 60 80
Q Z
w
MO>
U z
UO
❑ FINES CONTENT (%) ❑
rr
a.
a
0
20 40 60 80
Brown Sand with Some Roots
:` •, Gray Sand
SS 10-7-8
Light Brown Sand
SS 9-8-9
Grayish Brown Clayed Sand
5
SL
7-5-4
SS
(9)
5-4 4
SS
:....... :....... :....... :.......
(8)
IL
5-7-5
SS
10 :.
(12)
Bottom of borehole at 10.0 feet.
m
Lu
w
W
w
i
Y_
0
U
O
O
Li
W
J
LL
Y
W
W
W
2
U)
Y
V
w
N
N
H
c�
m
g
0
R
U)
z
Z
F-
0
J
a
2
m
U
W
H
O
w
._
0
KSM Engineering & Testing
j�� ]plV� P.O. Box 78-1377
K1 Sebastian, FL 32978
Tel: (772)-589-0712
Fax: (772)-589-6469
BORING NUMBER B-3
PAGE 1 OF 1
CLIENT Jim Wright
PROJECT NAME 6400 Koblegard Road
PROJECT NUMBER 184193-b
PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 12/5/18 COMPLETED 12/5/18
GROUND ELEVATION HOLE
SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
�-Z AT TIME OF DRILLING 6.00 ft
LOGGED BY DP/CH CHECKED BY JEK
AT END OF DRILLING --
NOTES See Attached Location Plan
AFTER DRILLING
W
o
® SPT N VALUE A
0
M
>-
U W
w
20 40 60 80
PL a
C LL
I
~
w
CL 00
MATERIAL DESCRIPTION
uj(n
w C
O Z¢
w
z a
o-5
0-
m0>
Y"
20 40 60 80
O
z
U z
0a.
W
<
W
El FINES CONTENT (%) ❑
v�•.:
ofwvn .�anu vvnn nww
o:'•
6-9-9
'
SS
(18)
:.......:.......:.......:.......
Gray Sand
: :.
Light Brown Sand
8-7-6
SS
5
::.
Grayish Brown Clayed Sand
5-5-7
SS
(12)
:.. :. :... .:......
SS
6-7-6
.•:
(13)
SS
5-5-5
'�'
'� � •
......................................
n 10
(10)
n
7
n
Bottom of borehole at 10.0 feet.
KSM Engineering & Testing
BORING NUMBER B_4
�j ]� P.O. Box 78-1377
11 19�� Sebastian, FL 32978
PAGE 1 OF 1
Tel: (772)-589-0712
Fax: (772)-589-6469
CLIENT Jim Wright
PROJECT NAME 6400 Koblegard Road
PROJECT NUMBER 184193-b
PROJECT LOCATION Fort Pierce, Florida
DATE STARTED 12/5/18 COMPLETED 12/5118
GROUND ELEVATION
HOLE
SIZE inches
DRILLING CONTRACTOR
GROUND WATER LEVELS:
DRILLING METHOD Split Spoon Sample
�ZAT TIME OF DRILLING 6.08 ft
LOGGED BY DP/CH CHECKED BY JEK
AT END OF DRILLING —
NOTES See Attached Location Plan
AFTER DRILLING
—
Lu
e► SPT N VALUE O
U
>- W
>-
U) W
w
20 40 60 80
=~
n
=O
a
MATERIAL DESCRIPTION
~
m
w 0
C%
�z�
��
� �
z
PL MC LL
'
w
0
g
>
o z Q
w r
n
�-
o
(9
o
z
O
m O>
z
U}
20 40 60 80
<
0
ofU
El FINES CONTENT (%) ❑
of
d
Q
0
1
20 40 60 80
•.:.;: Brown Sand with Traces of Roots
Gray Sand
8-6-6
SS
Light Brown Sand
9-7-8
5
Grayish Brown Clayed Sand
6-7-5
SS
:: :•.
....
SS
6-5-5
......................................
:
..:
(10)
10
SS
4-4-5
co(9)
TO ::•.::.
SS
5-6-4
:..
W o;:::.;: Gray Sand with Traces of Some Shell Fragments
10
( )
X SS
4-4-4
.... :....... :....... :....... :......
Q?
(8)
Y Bottom of borehole at 14.0 feet.
U)
U
O
W
ui
w
J_
W
G7
Y
tr
W
Lu
W
U)
Y
v
O
m
N
N
H
q
m
g
0
U)
z
0
0
J
a
x
m
x
U
W
F-
O
w
cD
Nonni
'max
x x PROP05 0 C N 4'
f PROPOSED
DRIVE—THRU
CARPORT
I EXIST. CONC.
x PROP.
CONC.
j APRM
ENTRY EL.. 23�25'
NAVD'88 j
+ 71.E PROPOSED
AC PAD EL.
22.83'
NAVD'881
OUST.I CBS 2
I �NALL PROPOSED
RESIDENCE
I 20. r -t 2..? �;' rya oa F.F.EL. 23.33 titi�
+ 2I1 7 VD 88
+ 19I� I PROPOSED B-3 N
I I EXIST. COVERED0111
CONC. PATIO
I ao B-4
I I EXISTIN TWO—STORY .24' 30' PROPOSE©
f I C.B.S. GARAGES .F.EL 22.61 OVERE
NAVD'88 PATIO EL: 23.25'
I I X'Ib� x'Z?I.P IC" NAVpijlp
f +21.8 RECONSTRUCT
TOP OF BANK
LOCATION OF TESTS
REC jNSTRUgT
TOP -OF 80K
rn
X
PROJECT: 6400 Koblegard
Road, Fort Pierce, Florida
SHEET OF 1IV
Com IL N
ENGINEERING
DRAWN BY: J.L.
PERMIT #:
PROJECT #: 184193-b
1_J AVL