Loading...
HomeMy WebLinkAboutStructure PlanNOTES . : Home wall cam : CLAMP. - MINUTE MAN 1.Foundation design is based on current Palm Harbor Homes EQUIVALENT�PER NOTE 3 EAS OR ATTACHMENTS: •`� MMA CQRfCEALEDFASTEN Manufactured Housing set-up manual and is in compliance with w% o FEMA P-85 2nd.Ed, 11/69, and FL DMV.Rule 15C-1 where .. .5X3.5x6 sieiun►o�TME..: ; ���'•�••••• az applicable. 2010 FBC shall be used for concrete foundation wood. shims. ••�.••• a-Z,Uz AeN Ae r��wn�eQ details where. needed or requested. .. X8Xf6 PT .. wall SEE OTE JU FOR REQUIRED �:�Cij� OT . •• w Hot dipped galvanized strap - � � : Z .Home ELEVATION O.F.BOTTOM OF 2. Site drainage both under and outside the manufactured home zinc coating .60 oz. per •'.e X8X16 CMU LOWEST STRUCTURAL MEMBER _ w LEI In shall become a _part of this design. Where: site drainage away type '1' finish e, grade 1, 2X8X16 PT � from the home can .not be achieved by the required change in 1.25", 109.000 min. yield x 50' - 'ti �CK�,v. o grade of 6" within the first 10• around the structure an strength.. MINUTE MAN MMA in Grade pier height ••, ` OR EQUIVALENT PER NOTE 3 altemate solution shall be presented::to local jurisdiction for: 6 mil. VAPOR BARRIER IS REQUIRED UNDER (see note 7) review: Grading. under the home shall be crowned to provide positive . ALL NEW HOMES WITH ENCLOSED CRAWL SPACE 16 CMU xax C slope. to ext. of :home. L—LOLIVER TECHNOLOGIES 1055-13 A 17X25 ASS PAD OR EQUIVALENT PER NOTE 3 •••••O\ w 3. Unless unavailable all foundation . equipment under the home CLEAN POISONED AND COMPACTEDPR 1 1 FILL �' � 0 STABILIZER PLATE OLIVER TECHNOLOGIES (anchors, straps, LSD systems, pads,. etc.) shall be identified 1055-19 AS REQ. FOR :LATERAL STRAPS from :Florida s Approved Products List for the Installation, of alvanized ground OLIVER : :iLLLZZ Grade Mobile/Manufactured Homes, revised 04/10. ANCHOR TECHNOLOGIES 486B �4WORiC 6 mil. VAPOR.BARRIER IS i oa�LL�� a_ _ OLIVER TECHNOL IECH�W.Q 4. Max. pier spacing under.begms .120 on 17" X 25".ABS .. BY FIE �55 i+ SPACE N �K THESE PLANS AND REQUIRED ARE SUBJECT.TO A T � UNDER ALL NEW pads. ;Pier spacing & location :on marriage line shall be per : OPiRED L �y'V T PIER HEIGHT DETAIL TYP oK_w= sge PIER A DETAIL o s € z RE MAY BE NECESSARY IN ORDER T0, Z o w CRAWL Manufactures s Home set-up, manual; and pier pad size on �_ _ a/e - r-a .: 6 a o s o o k marriage line shall .be per Manufacturer's Home set up manual. COMPLYWITHALLAPPLICABLEAOD G �0 _ o ao 5 ) s Design for pier pads based on FL Rule: 15C-1 :for Wind Zone 3; COUNT�, <�o`m a �� 8T LUCKD 3 with 1000 psf soil: capacity.Torque or penetrometer'testing required U�,�'S �F81 D_ =w>-"-o:" by installed to verify use of V anchors: otherwise 5' anchors must ' E`VVED FOR C IA E be: used. :. ;,.. • B , R1H;���FD 5: Non -Structural. Skirting is to be installed 'around entire: ; ••:; 76P'XI16" Xock r4Pie J ' :,f precast, Concrete. perimeter per manufactures specifications typical. Venting p � 7� ?�: T j*- ST � KEPT ON JOB for this. home must conform to. the requirements of both r� % OR No INSPECR CTI®�* �'I[,L BF I6Yt�E, 15c and FEMA (for Flood: Zone). If solid skirting is used there:shall:be a min of 1;767 square inches of venting, SEENOTE SECTION 167d8k4'CONCRETEPIERPADS-STACKED.. divided into vents on all sides of the'home'.with at least' ,,w,. • ..• Foundation maybe LOAD'CAPACITY =#OF PADS ONISMOMX1490LBS. o poured -In-place one vent within 3' of each corner and :equally spaced :zy;*s� `a.• concrete pads:per a ;; between no .more then 25. feet apart. :All vents. are .to. be • ' Palm Harbor Homes d .? "set-up manual or ' ' p 17 5'x25 5" ABS PAD =3000 LBS: CAPACITY 8. c .. O installed. with the bottom: of. -the vents no more then 12" approved ABS � � 1T.VX25.5"ASSPAD : 20WO'ASSPAD' �, c _ , above: grade and must be.both rodent proof and.:capable •"'•'a pads. See Note 4 LEG@j. tip of passing water freely through them. If standard for appropriate C 1T5X15.5`ABSPAD 13'x2s'HBSPAD = perforated horizontal vinyl siding or:perforated vertical QcarrivaxTmoa 13"x26'ABSPAO 2375LSS.CAPAC" PAD ASSEMBLY PAR ASSEMBLY •� e r W sizes. TYPICAL PIER DETAIL a u Skirting is used only the FEMA requirement rrmust be met 3 MAX:LOA<i-6000LOS. MAX.LQAD9490pL9S; b Zm ram, with additional vents: products like Smart Vents are SINGLE STACKBLOcKS: SINGLE STACK BLOCKS acceptable :in properquantity. P P P STABILIZER SYSTEM REQUIRED PER PALM HARBOR HOMES INSTALLATION. MANUAL 1 T.6W5.5• ABS PAD 13'x'L6* ABS PAD. U 6.' The piers along l-Beam can be dry=stack..' See note 7 for: " •ti height and site. limits. 7. :Building Piers: ill S 3248 .: COLUMN. LOADS 7.1..: Perimeter piers and marriage line piers shall be installed' -•. »oawws and spaced per ;manufacturer instructions' and shall be O 1582 LBS. 2 10" 64° 241141 MAX. . single stacked. If height exceeds 54":then :apply adhesive - �cno�v,�s, per note s. O2 =1582.LBS. + 11+ 7.2. Piers along I -Beam shall be double stacked. 7.3. All Piers:: O F 1974 LBS. ?EaavaaMxeu�cKwc 7.3.1. If in non -flood zone: apply adhesive_ per, note 9 to pier . if height exceeds 54" ®= 1974:LBS.. 7.3.2. If in flood zone: apply adhesive per note 9 to pier if'. height exceeds 40" 24 9 10-0. 8 4• 24 7.3.1 If; in :velocity zone: apply' adhesive per note 9 to pier v aareLEuunruc,wuL:. AIAX spnewa', "P 8.' Dry -stack piers,, for this application, meet the requirements seJcws aa of the code. :Piers. do not need to be filled,: covered, textured,' �� � a w or sealed provided the stack complies .with note 7 above. L - F.�Q! _ W 9. 9. Use :Liquid Nails Heavy: Duty :for joint adhesive :or :other + MtM i v non -water soluble adherent with a minimum _ strenght: of 300 Q d 1 `�i°� psi in shear strength. At contractors option, mortar may be 0 •— used in lieu of adhesive: cc 'IT 1nrnuxana, C�a CODES: 24 T-0 1 �0-0 — - . T-0' 24 VAX j. tJ> • Florida Building Code 5th Edition: v ma s ��- 7PD • Risk Category Jl ASCE 7-10. Minimum Design Loads for Buildings and other Structures. • Building Code Requirements for Reinforced Concrete • (ACI 318-05) Specifications for .Structural Concrete for Buildings 'sEAjLOCA70H • (ACI 301-11) Building Code Requirements for Masonry Structures sEavarnaeerFauwc,asc. • Building Classification Category 2 ®. o • Foundation .is rated for up to 160 mph • .end .Exposure Category C. 24� 7e-avw+a »cc . - PER947ER 71&Vpyypg S . PLANT h M = PAV, where Pis the density of H2O (62.4lb/cu. ft), A is area of pier, and V is velocity of flow per sec. F=MV/g, where g is the gravitational constant (32.2ft/sec squared) Area of largest face of pier= 16 x 36 = 4 square ft Pad size is min. 17" x 25" ABS or 2'x 2' concrete Pier spacing is max. 6' cc under all beams. Marriage line piers spaced per manf. recommendations. Soil bearing capacity equals min.: 1,000 psf Flow rate of water: 5 ft/sec. Size of home foot print: (inches) 279.96 x 456 = 887 Weight of home at min. 40q/sq ft = 35,462 Ibs Minimum number of piers at max. 6'cc: 28.5 (includes marriage line piers) Minimum dead load on each pier= 1,244 Ibs Maximum dead load on each pier- 1080 Ibs (Fb) M = PAV = 1,248 Ibs/sec Fw=MV/g= 193.8 Ibs (+M=-2Fw+8/12Fs=(3Fw=Fs) Fs (reaction of soi l due to H2O)= 581.2 Rs (reaction of soil) equals Fs+Fb equals 1,661.' Bearing quality of soil = Rs/pier pad area 415.3 Ibs/sq ft For designed soil bearing capacity, safety factor is 2.41 Friction force on drystacked block: f = N Mu where N = mass flow rate and Mu =.45 (coefficient of friction for light weight concrete per PCI Design Handbook) f= 561.6 Ibs for a safety factor of 2.90 Calculations for water loading on long side of building (FF below BFE): Base flood elevation 9.00 ft Building Base elevation 9.67 ft Height of water impact on building C Num. of sections: 2 R1,Width btwn beams: 236.0 in R2,Distance to edge = 21.99 inches R3,Width Rl+R2 257.97 in Uplift: 461bs/sf ( 23.33 )= 107S.S1 Ibs/ft Dead Load: 40 Ibs/sf ( 23.33 )= 933.20 Ibs/ft Net Uplift: 6lbs/sf ( 23.33 )= 142.311bs/ft Horizontal Load: 47 Ibs/sf ( 8 ) ft = 376.00 Ibs/ft (+EM(RV2)=0= 376.00•(4) + 142.31 ( 11.67 )= 3164.08 / 23.33 = 135.62 ft Windward=U(W) 135.62 lbs/ft Leeward =U(L) 71.1565 lbs/ft (+EM(R2)=0= 34986.63 - 1564.73 = 33421.90 divided by Rl= 141.63 lbs/ft (RI uplift) [U(W) x R3] [U(L) x 112] (+EM(Rl) =0= 18356.24 - 2982.35 = 15373.90 divided by R1= 65.15 Ibs/ft (R2 uplift) [U(L) x R3] [U(W) x R2] Windward= 68% Leeward = 32 % Horizontal Ld @ 38 feet = 14288 Ibs Horiz. Ld (end) @ 23.33 feet= 118641bs (assumes a 4:12 pitch) Uplift -windward: 38 feet= 37041bs Uplift -leeward: 38 feet= 17041bs 66,334 Ibs Total Resistance Minimum number of anchors, long side: 12 times 3,150 lbs load: 37800 lbs uplift resistance each unit Minimum number of anchors, end: 5 times 3,150 lbs load: 15750Ibsuplift resistance each unit Number of LSDs w/lat. Arm, long side: 2 times 6,3921 bs load: 12784 Ibs lateral resistance each unit Number of LSDs for longitudinal: 0 times 3,941lbs load: 0 Ibs longitudinal resistance each unit Load Combinations Dead Earthquake Fluid Latteral Live Live Roof Rain Snow Self Strain D E F H L Lr R 5 T 1.4(D+F) 933 1.2(D+F+T)+1.6(L+H)+0.5(LrorS or R) 933 0 2,700 285 142 0 0 0 1.2D+1.6(LrorSor R)+(Lor O.8W) 933 285 142 0 0 1.2D+1.6W+L+0.5(Lr or S or R) 933 285 142 0 0 1.2D+1.OE+L+0.2S 933 0 285 0 0.9D+1.6W+1.6H 933 2,700 0.9D+1.OE+1.6H 933 0 2.700 > ZZ 0� a W � � C�1 i2 0 d H C LO CGa¢ 0L N