Loading...
HomeMy WebLinkAboutPLANS - 21 MontereyFLOOR PL/4N 41, TYPICAL NOTES: SCALE 1/4" = I'-C" I< >I CRASH POST DETAIL 1. Contractor to verify ALL notes and dimensions prior to N.T.S. p Water Heater 36" high by 4" diameter proceeding With work. steel crash post. Floor 2. Contractor to STRICTLY enforce ALL OSHA Requirements. Flange with 4 - 3/8" expansion bolts Into 3. ALL Lumber to be used as Beam, Rafters, etc... to have slab (3/8"t 5o ksl steel plate) a minimum 1,400 P.S.I. fiber stress. 4. No dissimilar metals to touch. 6 S. ALL Concrete used for slabs shall be min. 2,500 PSI concrete. ALL Concrete used for vertical filled cells, cont. tie beams etc.. to 0 shall be 3,000 P.S.I. concrete and/or 4,000 P.S.i. grout mix �. Drywall at ceilings shall be leveled and attached to bottom chord of trusses with screws per FBC R102.3.5. 7. ALL wood in contact with concrete shall be pressure treated. 8. ALL wall dimensions are nominal and not finished wall or stud dimensions. 9. ALL plumbing fixtures to be low flow. 10. Contractor to Provide Drain at water heater in accordance with the current edition of the Florida Plumbing Code. 11. Contractor to Provide a 2'-8" wide door at one bathroom for handicap accessibility requirements. 2'/2" 2r2" 12. Lowest finished floor to be set by Governing Building Department %2" 6 �2" surveyor to set in field. 13. Separation between residence and garage shall be per FBC R302.� 14. Door between garage and residence shall be 1-3/4"t 20 min. rated door 15. gall and Ceiling Shall have a flame —spread classification of not greater than 200 Der FBC R302.9.1 ll�. Wall and ceiling finishes shall have a smoke —developed index of not greater than 450 per FBC R302.9.2 11. All exposed attic insulation materials installed on attic floors shall have a critical radiant flux not less than 0.12 watt per square centimeter. Exposed foam plastic insulation materials exposed on the underside of the roof deck or on the attic Walls Shall comply with F.B.C. R31� — see permit info box of code edition 18. Gypsum board material shall conform to ASTM C3�, C19, C'415, C51'4, C�30, C931 C`I`�0, C1002, C1041,Cll11, C1118, C1218, C1395, or C139and shall be installed according to the following: (FBC R102.3.5) Dr wall Thickness Location Orientation Framing Member Max, spacing of fasteners Nail sizing options for installation of drywall into spacing Maximum wood framing members Nails Screws 2" x min, thickness Ceiling Perpendicular 24 -100 12" 13ga 1 3/8" long with 19/64" head 0.098" diameter x 1 1/4" long /2 annular -ringed or 5d cooler nail OR Walls Either 161,81, 161,0.080" dia. x 1 5/8" long with Direction 15/6,V head OR Gypsum board nail 0.086" dia. x 15/8" with 9/32" head. Ceiling Perpendicular 24" -1" 12 13ga 1 5/8" long with 19/64" head OR 0.098" diameter x 1 3/8" long annular -ringed or 6d cooler nail / OR Walls Either 161,81, 161,0.092" dia. xx 1 1/8" long with Direction 1/4 head OR Gypsum board nail 0.0915" dia. x 11/8" with 19/64" head. 19, ALL ceramic tile surfaces installed shall conform to ASTM A108.1 thru A108.�, A108.1, A118.1, A118.3, A13�.1 and A131.1 20. Cement, fiber —cement or glass mat gypsum backers in accordance with ASTM C1288, C1325, OR C1118 and installed I.A.W. manufacturers recommendations Shall be used as backer for the wall tile in tub areas and wall panels in shower areas. 21. insulation including facings such as retarders or vapor permeable members installed within floor —ceiling assemblies, roof —ceiling assemblies, wall, crawl spaces and attics shall have a flame spread index not to exceed 25 with an accompanying smoke developed index not to exceed 450 when tested in accordance with ASTM E 84. Insulation shall comply with F.B.C. R31L install doors thru buck into block using tapcons as stated INSTALL VULKEM BLOCK SEALANT Install windows thru buck into in product approval form on sheet I. block using tapcons as stated Exterior face Buck to be 2 x 6" PT ON ALL JAMB, HEADER, AND Exterior face in product approval form on sheet I. of wall SILL BLOCK PRIOR TO BUCK of wall INSTALLATION aries V aries See product approval for 1"x4" P.T. Buck nailed to hinge screw into wall req. block with case hardened nails prior to window attachment Detail [� t Door 7) ., + ,1 + Ill.- A ., , , . NTS Window Schedule Mark Size Rough Coen. Window Descrl tion PRESSURE ZONE I. 4'-5%6"x 5'-3%" 54i8"x 63%4' Single Hung ZONE 4 2, 6'-2�,s"x P-3 %e" 15" x 63 i4' Single Hung ZONE 4 S. 2'-2" x V-2 1/2" 21�/2"x 38%" Single Hung ZONE 4 4. 4'-5 s"x 4'-2%" 547a" Single Hung ZONE 4 ALL Windows to be aluminum windows w/ tint and mullions per elevations. ALL windows to withstand pressures in permit info box on sheet 1 ALL windows in bathrooms to be tempered All rough opening dimensions to be verified by contractor with manufacturer s specs prior to construction Door Schedule Mark s1Ze Rough Opening Door Descrl tion PRESSURE ZONE A 9'-0" X 1'-0" 108" x 84" Overhead Garage Door ZONE 4 B 3'-0" X 6'-8" 41 %4"x 83% Fiberglass Panel - Inswing ZONE 4 C 6'-O" X 6'-8" �4x 81 �2", r e;Ltom " Sliding Glass Door ZONE 4 D 2'-0" X C-8" Solid Core - Wood - 6-Panel -Bi-Fold Finished 24" x 81 �2" E 2'-6" X C-8" Solid Core - Wood - 6-Panel F 5'-0" X 6'-8" Solid Core - Wood - 6-Panel - Bi-Fold G 2'-8" x C-8" x 1 %," Solid Core Wood, Steel, or Masonite Door 20 min. rated at garage H 2'-8" X C-8" Solid Core - Wood - 6-Panel J 2'-6" X C-8" Solid Core - Wood - 6-Panel - Bi-Fold ALL Exterior doors to Withstand pressures stated in permit Info box on sheet 41 GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM AND SHALL WITHSTAND THE PRESSURES STATED iN PERMIT INFO BOX ON SHEET 41 All rough opening dimensions to be verified by contractor with manufacturers specs prior to construction 2 %2" 2 �," '/2" r2„ O X3/8" � 2%2" 4" 2 �2" O 0-- 'I 2„ Recess top plate 4% x 3/8"d for steel support angle see detail on this sheet Steel countertop support an Install 6" from each end and one in center of counter. see angle detail 1/2" drywall Counter top - verify type with contractor Base cabinet 2" x 8" wood studs at 16" o.c. 2" x 8" PT wood plate KITCHEN ISLAND FRAMING DETAIL 12" Verify attachment hole location with CSC prior to fabrication 3/8" thick 6„ steel bracket COUNTER TOP BRACKET DETAIL V VTR / 2"I I JIL MASTER 1 1 BATH 2" 1 1 KITCHEN \ \ , , 1 ,, I LAV-1 1 wm-1 I jiLV 1 LAUNDRY 2„ LAV-I 1 2„ I 2" 1 1 1 1 1 LAV-I 2" 2" 1 LAV-1 c-1 12"1 2„ 2„ J 2 2„ SHWR-1 2 3" we-1 3„ I 2„ T-I BATH #2 3" C.O. 3" SANITARY RISER nts to septic/ sewer system Metal roofing and underlagment intstalled per Product Approval NTS as shown on sheet I over COX decking - see roof sheeting attachment diagram on roof plan. Simpson HETA 20 or equal hurricane anchor at each truss with (10) IOd x 1 1/2" nails 12 ( 24" o.c.) supporting Max. 4 PRE-ENGINEERED TRUSSES 1810lbs. uplift at 24"o.c. TYPICAL Truss mfg to provide level (shop drawings by manufacturer) return to be I" short of wall Aluminum Drip Edge & Fascia R-30 blown fiberglass 2" x 4" Sub -Fascia Vl\in bottom chord of trusses 12" I/2" drywall with smooth finish Kaycan full o vent vinyl soffit installed per product approval form on sheet I. Two rows of beam block filled with concrete and (I) 45 bar Cont. In each row. Substitute precast lintel filled with concrete and (1) 45 I" x 4" nailer attached to bar cont, for bottom row over openings level return with (2) 8d ring shank nails with min. 1.5" 1/2" drywall over 1" x furringg penetration into soffit framing strips at 16" o.c, with R4.1 fl-foil insulation on typical 8" Block walls 5/8" thick light textured = All dr wall to be installed per FBC R102.3.1 y stucco on typical concrete and shall meet all pertaining ASTM codes. "M" block construction Mortar to be Type only proportioned-�pper FBC R601.1 and Mortar Joints shall comply with FBC R601.2.1. Provide Dur-O-Rock at all wet areas (ex. showers, tubs etc...) 45 bar vert. w/ 30" overlap Fill cell with grout and at each filled cell (I) 45 bar vert. (typical). Max. spacing shall not exceed Wood 48" unless otherwise noted Masonry Beam see foundation plan notes for ase spacing at openings I" x 6" P.T. Buck nailed to 4" concrete slab with fibermesh OR block with case hardened nails—, 6"x6" 410/10 WWM on 6 mil Vis ueen over prior to door attachment head and jambs clean compacted termite treated fill S!7 �y Install SGD Frame thru buck into Grade v block using tapcons as stated . o 1n product approval form on sheet I. AHM I' 14"w x 18 Concrete footing 11 with (2) 45 bars cont. and 45 Verify sill attachment I 1•¢" transverse bars at 48" o.c. with product approval < sheet I. TYPiC/4L SECTION Scale : 1/2" = P-0" �L Head 6111 12" x 12" Concrete column 12" block filled with concrete and (2) #-1 bars vert. tied Into lintels above ° o 101 o� 0) I Opt. PATIO/SLAB 35'-0" 112" 8'-10%2" Filled cell under girder above _ PORCH 6 WIRE LATH t STUCCO CEILING 0 0 8'-0" to 9'- A F F MASTER BEDROOM 8-0" A.F.F.dL Flat Ceiling Vaulted Ceiling Rod >I Shelf Ln C: REAT� ROOM I cc J of OSE 0 1 I 1'-11, L --- r I Rod t Shelf N WASHER DRYEi2 2" L 1 0 LAUNDRY 8'-0" to 9'-8" A.F.F. Vaulted Ceiling ROOM "h n�2gh b I I I 34 3/8" thick steel I counter toffs to overhang wall 1.5" <r I I cou ter top supports 90" 5'-3" 4" counter to s to eq- eq overhang wa F,1.5" 6„ 6 PANTRY CAB [ DW ° O +41" high wall I I n I 00 KiTCHEN 8'-0" to 9'1" A.F.F. O `� Vaulted �eiling pper cabinets to I extend ove Ref. I iCR WAVE I I NON VENT REF. 38" CLEAR CIA24 H.B. L — — O — OPENING m m — — — N m -II Batts Insulation A / C W.H.�9, Provide auto # 1 0 4"0 Steel Ballard closer See detail on this sheet E r 22" x 54" 1 ?� Attic Access O = 1 with light 1 a Q J L - - - - - w 8'-c A.F.F. „, Flat Ceiling Flat Ceiling q ARAC:�E � J Vanity to be 34 %2 "high � � U O 9'-5"@J)e 4211 " 18„ 3lock wall in 12'-8„ �r J O THiRD m BEDROOM 'IQIIIM�� arage to be O E111 MT 0 [ struck block 2'-8I [� EMERGENCY r----------------� EGRESS Di O I I I I I I I I O I I I 0 - I I cc � I I I I I LO I I Ell 1E] 00 El 119 00 A 2'-8" 9'-O" 2'-8" �� 6,_4„ n Q lidmg door I L I" x 6" P.T. Buck nailed to block with case hardened nails prior to door attachment Masonry Wall Install SGD Frame thru buck into block using tapcons as stated in product approval form on sheet I. Jamb Sliding Door Detail At Masonry Wall NTS 12'-8" Zr I / L R-II Batts Insulation Provide auto 150 Amp closer Panel r-----------------� E_ 0 41.25" x 82.5" I I ough opening M I for this door II ° O I b I 11G0LP CART I GARi4GE 13'-0" O I IV C 0101 AlO OC 9'-0" Square Footage Breakdown Total A/C Space = 1,753 Sq. ft. Covered Porch Total = 212 sq. ft. Garage = 459 sq. ft. Under Roof Total = 2,484 sq. ft. Total Cubic Ft = 14,024 H.B. O 0 w w W H i cn N _U IlP or �( � v mo U Q3Q U U Q- O �LL U >- Q UO LLI J..1__I L I— N W o O Li l L-3 O Z W oo c<1 O < NNE O Go M U p- 1 z NN v # -0 U m ~ W x v L U Ln +, IL 4-3 SHEET NO: OF 5. JOB NUMBER: 21 o�\oo4�QQ°°° O 0 ® kfLR. B ed�I Digitally signed b o` o °10 Daniel R. Braden g_ ' o AR9770 °o§Zzz Date:2021.04.07 °°°°°° 10:21:23-04'00' FCL,,III,,1NEDAT1CN FL,4`N 12" x 12" concrete column block filled with concrete and (2) 1*1 bars Vert. tied Into lintels above 12", 8'-10 %2" v Opt. PATIO/SLA 1 \F4 35'-0" O I 2, 8'-10%2" ' a 15'-3" STRUCTUR.4L MOTES: 1. ANY CHANGES TO THE PLANS MUST BE SUBMITTED TO THE ARCHITECT FOR APPROVAL BEFORE PROCEEDING WITH CONSTRUCTION 2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL NOTATION AND DIMENSIONS PRIOR TO START OF CONSTRUCTION 3. ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL BEARING CAPACITY. IF ANY SUB -SOIL, MUCK OR NON -UNIFORM CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN PROPER ENGINEERING DATA FOR DESIGN. `�.. ALL SLABS AND FOOTINGS TO BE A MINIMUM 2,500 PSI AT 28 DAYS ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS 5. POISON SOIL AND COVER W/ MIL. VISQUEEN WITHIN 24 HOURS. NO SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION. SLAB ON GRADE TO BE A MINIMUM 4" THICK W/ 6X6 10/10 WELDED WIRE MESH REINFORCING ON 6 MIL. POLYETHYLENE VAPOR BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL (MINIMUM 95% DENSITY). LAP POLYETHYLENE 12" MINIMUM. FIBERMESH MIX MAY BE SUBSTITUTED FOR WELDED WIRE MESH. 1• LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS BEFORE FILL IS BROUGHT IN. FILL MATERIAL SHALL CONSIST OF CLEAN GRANULAR SAND CONTAINING LESS THAN 10% MATERIAL PASSING THE US STANDARD NO. 200 MESH SIEVE. PLACE STRUCTURAL FILL IN LOOSE LAYERS OF 12" IN THICKNESS AND COMPACT EACH LIFT TO AT LEAST 95% OF ITS MODIFIED DRY PROCTOR VALUE. 8. GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE ATTENTION OF THE ARCHITECT. `. GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR 10. CONTACTOR TO VERIFY ALL RECESS THICKNESSES AT SHOWERS FLOOR FINISH CHANGES, SPECIALTY EQ. ETC... 45 bar Vert. w/ 30" overlap Fill cell with concrete and at each filled c 0) 45 bar vert. (typical). Max. spacing shall not exceed 48" unless otherwise noted SCALE: 114" = 1'-0" II. SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS 12. CONTRACTOR TO PROVIDE SOLID FILLED CELL AND 45 BAR VERT. AT 48" O.C. MAX. PROVIDE (1) FILLED CELL ON EACH SIDE OF OPENINGS UP TO 5'-11" WIDE. PROVIDE (2) FILLED CELLS ON EACH SIDE OF OPENINGS 6'-O" WIDE AND UP. VERIFY ALL FILLED CELL LOCATIONS WITH FOUNDATION PLAN. 13. DESIGN LOADS ARE AS FOLLOWS: SEE PERMIT INFO BOX ON SHEET I. 14. ALL REINFORCING STEEL SHALL BE GRADE 6O, MEETING ASTM A-I6, t A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 30-1 STEEL. I5. ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE. FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS, SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE. 16. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS: FOOTING: 3" BEAMS: 1-1/2" 1� LAP ALL REINFORCING STEEL A MINIMUM OF 48 BAR DIAMETERS. 18. USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1600 PSI 19. ALL STANDARD STRUCTURAL LUMBER SHALL BE SYP WITH A MINIMUM SOUTHERN YELLOW PINE 42. MIN. Fb AS FOLLOWS: 2" x 4" = Fb 1,500 PSI 2" x 10" = Fb 1,000 PSI 2" x 6"/8" = Fb 1,200 PSI 2" x 12" = Fb 915 PSI 20. ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE PRESSURE TREATED. FASTENERS TO HAVE MIN. G185 RATING. 21. CONTRACTOR TO PROVIDE FORM BOARD SURVEY AND FURNISH TO TRUSS MFG PRIOR TO TRUSS CONSTRUCTION FOR ACCURACY TO FIELD Termite Protection for New Construction as per P.B.C. R318.1 CONTRACTOR TO REFERENCE F.B.C-R FOR FURTHER REQUIREMENTS Wood see foundation plan notes for Thicken edge to 8"x8" Base spacing at openings with concrete and 4" concrete slab with fibermesh OR 4" concrete slab with fibermesh OR one 45 bar continuous 6 x " 410/10 on 10emil Visqueen over 6 x6 410/10 WWM on 6 mil Visqueen over WWM ll clean compacted termite treated fill GRADE Grade - _ _IIII IIII II, with x 18"d Concrete footing with (2) 45 bars cont.F 4� PORCH SLAB EDGE DETAIL —I IIII- 3„ transverse bars at 48"and #5 O.C. 3" 14" TYPICAL FOOTING DETAIL J SCALE 1/2" = 1'-0" 4" concrete slab with fibermesh OR > x> 410/10 WWM on 10 mil Visqueen over clean compacted termite treated fill 45 bar cont. Step per foundation plan N b TIC() 3" (2) 45 bars cont. bottom steel lo° 12" 2 DETAIL AT GARAGE STEPDOWN SCALE 1/2" = 1'-0" 12" x 12" concrete column block filled with concrete and (2) #1 bars Vert. tied into lintels above Top of footer 16" below finished floor 12" — III!- 30"x30"xl6" concrete - column footing with (•4) 4HIIII —IIII IIII 95 bars each way 3' 30" 3 COLUMN FOOTING DETAIL SCALE 1/2" = 1'-0" 1*5 bar cont. in curb Curb height Verify based on foundation plan SCALE 1/2" = 1'-0" #5 bar Vert. w/ 30" overlap at each filled cell Fill cell with grout and (1) 45 bar Vert. (typical). Max. spacing shall not exceed Wood 48" unless otherwise noted Base see foundation plan notes for spacing at openings 4" concrete slab with fibermesh OR 6"x6" 410/10 WWM on 6 mil Visqueen over clean compacted termite treated fill Grade -I ; 0L7`� a Eli,_ 14"w x 18"d Concrete footing ILL wit transverses bars sato48" and #5 �4f=S GARAGE CURB DETAIL 1%" 2Min. SCALE 1/2" = I'-o" Edge I I Up 2" x 6" PT wood secured with 1/2"dia. x 6" expansion anchors with 2" sq. washer at 18" o.c. overhead door track secured to wood jamb per manufacturer's product approva Gdrage Door Jamb Deta11 E O M Contractor to provide proper foundation chairs for proper steel installation 30" min. Corner Steel Lap nts GARAGE DOOR TO WITHSTAND PRESSURES STATED N T S IN PERMIT INFO BOX ON SHEET 41. SEE PRODUCT APPROVAL_ FORM FOR MANUFACTURER MAKE AND MODEL. Filled Cell Masonry Column With One 45 From Footing To Beam Each. Filled Cell Masonry Column With One Grout fill To Be 3000 PSI 45 From Footing To Tie Beam FOOTING SCHEDULE Mark Size Description FI 14"W x 18"D MONOLITHIC FOOTING WITH 2 45 BARS CONTINUOUS F 12"W X 12"D MONOLITHIC FOOTING WITH (2) 45 BARS CONTINUOUS 30" x 30" x 16"D COLUMN FOOTING WITH (4) 45 BARS EACH WAY F4 8"W x 8"D THICKEN SLAB EDGE WITH 1 1*5 BAR CONTINUOUS 14 W x 18 D FS With Curb at Garage MONOLITHIC FOOTING WITH 2 45 BARS CONTINUOUS - CURB 9 0'-0" See Floor Plan For Location Grout fill To Be 3000 PSI Double Pilled Cell Column NTS See Floor Plan For Location Single Pilled Cell Column NTS N o olo I o J Filled cell under U girder above 0 p Rear Porch Slab to be poured separately Ofrom House Slab. 0 0 0 O O O O-- — — —— -- `�— I FI Rear Patio/Slab to 1 be flush with bottom of 0 sliding door recess. O I Slope I" II_i I _i I _i 'I -; FI _i 0 I L°UlJ uu i i i 11 1 i i i lJl° O - IJIJ--- F� -- C 1 I FI 1 0 122,4 "" 1 0 C L Fi 1 i J Thicken footing to 1 O 1 24"w x 14"d x 24"1 I C 1 under filled cell 1 E El under girder bearing. FI I I� I� 0 I� 0 O 1 4" concrete slab with fibermesh OR 9)m 6 x6 410/10 WWM on 6 mil Visqueen over _ U v 6 1 clean compacted termite treated fill 1 C 0D 0 o I �- I WASHER DRYER � I FI 1 01 IC 1 1 -i I 1 -i I 10 II F- I III II I° 4" concrete slab with fibermesh OR FI 1 6"x6" 410/10 WWM on 6 mil Visqueen over clean compacted termite treated fill 1 MICROWAVE 1 0 NON -VENT REF 1 B O I O 38" CLEAR H. OPENING O o 2 o A/C W.H. // --- s ---- # 1 O 4 (P Steel Ballard 1 See detail on this sheet of m F IL O O I N OI 01 I v I FS L— — — — — — — — 7- 1O 7 77 1.5" Recess for Garage Door 2'-8" 9'-01, H.B. FS 14.25" Step I O I ��1 S ep I - >I I I; =1 1 �- 10 I I I FI I I Meter and — _ a- panel neither side of 1 0 0 4J O 0 O - — — O O — — — — — ----J ouse field verify service location �.5 tep 1 O 1 1 5.5" S ep = 1 w Io o f F5 = 0 1 �- F- ` F5 1 F- LO _ Joo a- 1 F 5 �o —-- 961 IEI1.5" ———— — — Recess for — — O 00 00 Garage Door 5" Step 5" tep 2'-8„ 61_411 ,1�2'-g„ 35'-0" q'-0„ 2'-8„ ADDRESS: 21 Monterey Digitally 'signed by Daniel R. Braden Date: 2021.04.07 10:21:33-04'00' a U U mo U Q30 U nL LL O � fn N W W o O LU =3 O Z W oo m O � > NNE O U p- >r >r < z NN # C)0 CA CA o -, LU ~ LLI � X —1 UN 1L }, lIL En a--) n� In SHEET NO: 3, OP S. JOB NUMBER: 21-7SB Provide #5 bars with 12" min, lap into beam and 48 bar dia. into vert. filled cell. Provide Cast -Crete 8U16-IB/IT precast - lintel set in mortar Min. 8" Bearing Fill lintel solid with grout. #5 cont. beam steel to run through lintel and tie to down rods in jamb cells. IVA Provide PT Buck attached per jamb letails into filled cel 4" Pre -cast SIII rout Filled Cell Provide #5 bars with 12" min. lap into footing and 48 bar dia. into vert, filled cell. ° :o _Concrete Footing See foundation plan for for exact sizes DETAIL AT WINDOW OFENING IN CBS WALL Concrete / Lintel i&.1 W; VM V1 Rebar Verify with Plan Column to Lint Scale: 1/2" = I'-C" 12"x 12" Column Block Rebar 48 Bar Did. Min. Overlap �4 ttaChm&nt NTS BEAM SCHEDULE Mark Size and Description Two rows of beam block filled with concrete and 1 #5 bar B1 continuous in each row. Hook vert. bar over top bar with #5 90' bend bar with a 10" min. lap at top bar. i Additional Precast Lintel #5 bars Lintel Bar Clear "A4" CLEAR Length Length Span Bars Bars i i i i i i i i i i i 2'-10" 2'-8" I'-6" 2,3 none 316" 3'-4" 2'-2" 2,U3 none 8F8-OB/IT 8F8-IB/IT 8F8-IB/2T Additional 4'-O" 3'-10" 2'-8" 2,U3 none #5 bars CLEAR 3'-2" 2,U3 none One Row of "H" Block Above 5'-2" 4'-O" 2,U3 none 5'-10" 5'-8" 4'-6" 2,U4 none Precast Lintel 141 M N M h Additional i i 2,U4 none #5 bars _, 7'-6" 7'-0" 6'-2" ZUS none 81=I6-I1B/IT 81=I6-6/2T g'-4" -l'-10" _1'-0" 2,U5 none NOTES: I. min. coverage of steel=l.5" 2. min. bearing required 9 ea. end=8" ALL reinforcing steel IS grade 60. 3. standard for reinf. steel=ASTM AL15 TYPICAL LINTEL SECTION ( PRECAST CONCRETE ) LINTEL SCHEDULE Mark Window or Door Unit Width Lintel Size Specification Rows of "H" Block Above 11 " Bottom Steel Size Top Steel Size Max. Gravity Load (PLF) Max. Uplift Load (PLF) Max. Lateral Load (PLF) L22 2'-2" 3'-6" 8FI6-IB/IT ONE I #5 1 #5 6113 3541 2854 L31 2'-6" 2'-8„ 3'-1„ 4'-0" 8FI6-IB/IT ONE 1 #5 I #5 2931 3019 2128 L46 4'-5" 5'-10" 8FI6-IB/IT ONE 1 #5 I #5 4360 2093 946 L50 5'-0" 6'-6" 8FI6-IB/IT ONE 1 #5 1 #5 3480 1880 1204 L60 6'-8" 1'-6" 8FI6-IB/IT ONE 1 #5 I #5 2661 1634 891 L80 8'-0" 9'-4" 8FI6-IB/IT ONE 1 #5 I #5 1843 IG3 139 L90 9'-0" 10'-6" 8FI6-IB/IT ONE 1 #5 1 #5 1533 914 519 L90B 9'-0" 10'-6" 8FI6-IB/IT ONE I #5 I #5 1533 914 519 1_100 10'-0" ll'-4" 8FI6-IB/IT ONE 1 #5 I #5 1366 198 604 LIOOB 10'-0" ll'-4" 8FI6-IB/IT ONE 1 #5 I #5 1344 198 (.04 L120 12'-0" 13'-4" 8FI6-IB/IT ONE 1 #5 1 #5 1015 606 433 L120B 12'-0" 13'-4" 8FI6-IB/IT ONE 1 #5 1 #5 1015 6O6 433 L140 14'-0" 15'-4" 8FI6-IB/IT ONE 1 #5 I #5 1250 485 341 L160 I6'-O" Il'-4" 8F8-IB/IT ONE I #5 I #5 950 404 251 L160B 16'-O" IT-4" 8FI6-IB/IT ONE I #5 I #5 950 404 251 - ALL LINTELS SHALL BE MADE BY CAST-CRETE OR LOTTS LINTELS - LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE - REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION REGARDING LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ. REQUIREMENTS - LINTELS OVER 14'-0" LONG ARE TO BE PRESTRESSED. HIP ROOF: SHEETING ATTACHMIENT DETAIL I. Minimum Nail Size = 8d angular ring shank (min. 2" long) 2. Minimum Screw Size = 48 x 2" 3. Minimum Sheathing Thickness 19/32" COX PI wood 4. Use nails or screws based on pressure for roof stated in permit info box on these pins for zone 3 0 4 FT 2E 30 TGABLE A 2N I < 2 TYPICAL 3® � --- 4 FT 2R --- 2E I 2R 4 FT R 2N F 4.� rL 4 FT Q 4 FT 2E 4 FT Ke Zone Edge Field Fastener Pressure 8d ring shank 45 psf 2E, 2R 8d ring shank �6 psf F7/12N/3E/3R 8d ring shank 84 psf SINGLE PLY REAR GIRDER TRUSS Nail 2" x 4" blocking to vert. leg of truss with IOd x 1.5" nails at 4" o.c. Install Simpson MGT into wall using 5/8" dia. threaded rod set min. 12" into wet beam and (22) IOd nails into truss R-19 batt 3LOCKING DETAIL )ER STRAPPING TER BEARING POINT 1/8" thick light textured stucco installed per ASTM C 926 over ASTM D type 2 paper backed wire lath nailed to substrate through one layer of - ASTM D Type 2 felt paper using 8d nails. Substrate to be 19/32' COX Plywood nailed at 6" o.c. in field and edges with IOd ring shank nails into studs. Metal roofing and underlayment intstalled per Product Approval as shown on sheet I over COX decking - see roof sheeting attachment diagram on roof plan. \ Simpson HETA 20 or equal hurricane anchor at each truss with (10) IOd x 1 1/2" nails ( 24" o.c.) supporting Max. 1810lbs. uplift Truss mfg to provide level return to be I" short of wall Aluminum Drip Edge t Fascia 2" x 4" Sub -Fascias 12" Kaycan full o vent vinyl soffit installed per product approval form on sheet I. I" x 4" nailer attached to level return with (2) 8d ring shank nails with min. 1.5" penetration into soffit framing 12" x 12" concrete column block filled with concrete and (2) 41 bars vert. tied into lintels above thicken edge to 8"x8" with concrete and one 45 bar continuous BEYOND Top of footer 16" below finished floor 4 12 4 Aluminum Drip ' Edge t Fascia Flash and Counter flash Nail ledger to gable end truss with (2) 10d mls at each web Trusses at 24" o.c. see shop draw bg others -30 Batts -19 batts C I r Ce111n 'Frame ceiling trans as needed using metal studs field verify exact configuration and sizes Drywall ceiling see typical section transition Insulation Detail nts Brace Gable end with 2" x 4" SYP #2 8ft back nailed to bottom of top chords using (2) IOd nails at each truss PRE-ENGINEERED WOOD TRUSSES 24"o.c. TYPICAL ( shop drawings bg manufacturer ) " �R-30 blown fiberglass 5/8" thick stucco on 3/8" hi -rib lath in bottom chord of trusses attached to horizontal and vertical wood framing with nails or staples to provide 1/2" drywall with smooth finish no less than 1-3/4" penetration into horizontal wood framing and 3/4" penetration Two rows of beam block filled with concrete into vertical wood framing members and (1) 45 bar cont In each row Substitute 5/8" thick light textured stucco on typical concrete block construction Varies - see plan #5 bar vert, w/ 30" overlap at each filled cell Rear Patio/Slab to be flush with bottom of sliding door recess. Step per foundation plan Slope per foundation plan °0 -IIII IIII IIII I II II - IIII IIII IIII IIII IIII v. o v. IIII �I11 I F3 Tunici precast lintel filled with concrete and (1) 45 bar cont. for bottom row over openings 1/2" drywall over I" x furringg strips at 16" o.c. with R4.1 Pi -foil insulation on typical 8 Block walls All drywall to be installed per FBC R102.3.1 1 and shall meet all pertaining ASTM codes. Mortar to be Type "M" only proportioned �pper FBC R601.1 and Mortar joints shall comply with FBC R601.2.1. Provide Dur O Rock at all wet areas (ex. showers tubs etc...) Fill cell with Grout and (I) #5 bar vert. (typical). Max. spacing shall not exceed Wood 48" unless otherwise noted see foundation plan notes for �, Base spacing at openings PRviod Strap truss to wall using Simpson MGT with 5/8" dia. threaded rod with min 12" embedment into beam either wet set or in epoxy with (22) IOd nails into truss. Add blocking to truss leg per detail on this sheet Simpson HETA4 20 hurricane anchor at each truss ( 2-4" o.c.) supporting Max. TAA20 E1810 lbs. uplift N � 77 JV L90B L90B W IL J N IOOB O B I 6 O BI BI ' ItEr 0 Z 1. . 1- ­1 � " � .." � _ � � � � _ � 1. � - � - I' . = I BI L6 B1 I I 2„ .H. LX-4sIZz- �{ O P _ Q N 19' �" BI O 18'r6" 7h/ BI L22 I` AULTIED RE L w Q L�fS I It6n ;` 18,-61' BI � � I 12 SLOPE �{ W I BI L31 2" I Met roof g and u as shown on sheet I tach nt dia ram der e n ro ment intstalled per Product Approval CDX decking - see roof sheeting f Ian. H Z I 1Z I 1 1/, <r N r - - BI L31 22" x 54" 10 BI 1 AtticAccess with light 1 1 0 \ W — J I / I BI I \ I I 12 I / L31 �f SLOPE I / I I 00 8' O" MAX I I I 48„ I I \ IODD SPACE 3 - L22 BI BI BI L90 BI O I W 1L N O cn B1 L90 BI L22 BI T,4 BI LLO . . ..... :..:....... ET,4 20 Provide for �p u tep utter S 1 ep ET,4 20 p son H E T A4 20 Provide downspout ' anchor at each truss O N N � 0 N � W v fY I (a N U L X � O� M L � O Q Q N W L T lz � cU o� U LU U �y L L � 4 concrete slab with fibermesh OR ( L`t o.c.) sU orLin I"lax. 6"x6" 410/10 WWM on 6 mil Visqueen over - OVERHANGS AT 1'-0" UNLESS OTHERWISE NOTED ON T&1� l H clean compacted termite treated fill - ROOF PITCH AST -f:12 UNLESS OTHERWISE NOTED ON THIS SHE T - TRUSS SHOP DRAWINGS TO BE PROVIDED BY MANUFACTURER ANY CHANGES TO THIS PLAN SHALL BE SUBMITTED TO THE - ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING COI���S: 21 Monterey ° II - ALL TRUSS TO TRUSS CONNECTIONS BY Digitally signed II TRUSS MANUFACTURER 9 y 9 1111J� P��i ARCHITECT TO REVIEW TRUSS SHOP DRAWINGS PRIOR by Daniel R. TO CONSTRUCTION FOR LAYOUT AND UPLIFT VERIFICATION Braden S e C t f on at r on t P Or C - CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO Scale I/2" = I'-o" PROVIDE FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO Date:2021.04.07 TRUSS CONSTRUCTION in.,) 1.4'� -n4inni v 0 U LL O U U N W W o O LU =3 U O z W oo m -.0" O < NN O U < z NN # O a- LLI ~ LLI �Xv �LLu -1 LL- fin UN � � � to tkil_ to SI—IFFY NO: OF S. JOB NUMBER: 21-i5B