Loading...
HomeMy WebLinkAboutAPPROVED 3 - SS-Concrete Foundation Letter for Keith Bloomer-10-30-17FL.(DRIDA ENGINEERING AND DESIGN. INC Q0 INC To: Keith Bloomer Date: 03/16/2021 Sr. Project Manager- Port St. Lucie Liberty Tire Recycling, LLC 9675 Range Line Rd Port St. Lucie, F134987 Phone: (772)-645-0477 Email: kbloomer@libertytire.com Project Number: 21-1951 Project Name: Equipment Foundations at Liberty Tire Recycling Drawing Numbers: 21-1951-CS-001; 21-1951-GA-001; 21-1951-GA-002; 21-1951-C-001; 21-1951-S-001;21-1951-E-001 It appeared to the Engineer of Record (Ahmadreza Sedaghat) responsible for foundation design of this project that the note appeared as " Compact Backfill to 95% proctor before pouring the concrete foundation" is not required to be executed by the concrete contractor since there is no backfill of any type may occur in this project. 7.A SEoq titi •• V { ti 74461 t a op ®, STATE OF Sedaghat, PE 03 1612pZ� r�tufal Engineer P.E.# 74461 Florida Engineering and Design Inc, 255 County Rd 555 South, Bartow, F133830 Cell: 813-406-2566 Office: 863-665-6363 Email: ahmadreza.sedaghat@fedinc.com