HomeMy WebLinkAboutAPPROVED 3 - SS-Concrete Foundation Letter for Keith Bloomer-10-30-17FL.(DRIDA ENGINEERING AND DESIGN. INC Q0
INC
To: Keith Bloomer Date: 03/16/2021
Sr. Project Manager- Port St. Lucie
Liberty Tire Recycling, LLC
9675 Range Line Rd
Port St. Lucie, F134987
Phone: (772)-645-0477
Email: kbloomer@libertytire.com
Project Number: 21-1951
Project Name: Equipment Foundations at Liberty Tire Recycling
Drawing Numbers: 21-1951-CS-001; 21-1951-GA-001; 21-1951-GA-002; 21-1951-C-001;
21-1951-S-001;21-1951-E-001
It appeared to the Engineer of Record (Ahmadreza Sedaghat) responsible for foundation design
of this project that the note appeared as " Compact Backfill to 95% proctor before pouring the
concrete foundation" is not required to be executed by the concrete contractor since there is no
backfill of any type may occur in this project.
7.A SEoq
titi •• V {
ti 74461 t a
op
®, STATE OF
Sedaghat, PE 03 1612pZ�
r�tufal Engineer
P.E.# 74461
Florida Engineering and Design Inc,
255 County Rd 555 South,
Bartow, F133830
Cell: 813-406-2566
Office: 863-665-6363
Email: ahmadreza.sedaghat@fedinc.com