HomeMy WebLinkAboutAPPROVED 2 - Site Development PlanMWCK84CK84COMPACTORDUMPSTERFC23FC23FA44MWMWMWMWMW
T
DITCH
FC23FA44CK-90CYCLONECR-180BAGHOUSEFC37CK120CR34421-1761 OF 1PROPOSED BAGHOUSE
PLOT PLAN
LIBERTY TIRE RECYCLING
PORT ST. LUCIE FLORIDA
REVISION COMMENTS
DRAWN BY
DESIGNED BY
SNO
RWF
07-24-2017
21-176 (03-08-2021).dwg
FILENAME
AS SHOWN
SCALE
DATE
MATERIAL
LAYOUT
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY EDC, INC. SHALL BE WITHOUT LIABILITY TO EDC, INC.
DATE 8 www.edc-inc.comF.B.P.E. CERTIFICATE OF AUTHORIZATION 9935L.B. CERTIFICATE OF AUTHORIZATION 8098ENGINEERS SURVEYORSJ.R. HARRISON, P.E.#82270(DATE)EX. METALBUILDING 4FFE = 27.23EX. METALBUILDING 6FFE = 28.08EX. METALBUILDING 5FFE = 27.94EX. METALBUILDING 1FFE = 28.53EX. METALBUILDING 3FFE = 28.03EX. METALBUILDING 2FFE = 27.95S 00°00'54" W 660.00' (D)
S 00°02'17" W 660.03' (M)S 89°59'06" E 696.98' (D)S 89°59'01" E 696.97' (M)N 89°58'55" W 1319.88' (M)N 89°59'06" W 1320.00' (D)10250 SW VILLAGE PARKWAY, SUITE 201PORT SAINT LUCIE, FL 34987' 772-462-2455PORT SAINT LUCIE OFFICE10250 SW VILLAGE PARKWAYSUITE 201PORT SAINT LUCIE, FL 34987' 772-340-4990' 772-462-2455ADDED BAGHOUSE & CYCLONES TO BUILDING #610-08-2014
ADDED (2) DUMPSTER/COMPACTOR PADS TO BUILDING #604-23-2015
ADDED BAGHOUSE, CYCLONE, & DUMPSTER/COMPACTOR TO BUILDING #408-05-2015
ADDED PIPE BRIDGE BETWEEN BUILDINGS #4 & #608-20-2015
ADDED BAGHOUSE TO BUILDING #608-02-2017
ADDED BAGHOUSE TO BUILDING #208-21-2018 BAGGED FINISHEDPRODUCTSA6 - WHOLE TIRE AREASA7 - WHOLE TIRE OVERFLOW SA5 - WHOLE TIREHOLDING AREASA2 - WORK IN PROCESSAREA WITH CONCRETESEPARATION WALLSFINISHED PRODUCTIN BUILDINGFINISHED PRODUCTIN BUILDING50'
STORAGE LAYOUT09-11-201870'40'
60'50'50'50'50'50'50'50'SWALERANGE LINE RD.50'50'50'50'50'50'50'SA1 - WORK INPROCESS AREA185'148'70'
60'
70'70'70'
50'50'SA3 - WORK INPROCESS STORAGE50'50'120'19'50'120'50'25'8'25'50'50'30'30'50'50'60'REVISE CALL-OUTS ON PLAN09-21-2018SA4 - WORK INPROCESS STORAGESA8 - WASTE TIRESTORAGE AREASA9 - WASTE TIRESTORAGE AREASA10 - WASTE TIRESTORAGE AREASA11 - WASTE TIRESTORAGE AREALEGENDSTORAGE AREA NUMBERSA#APPROX. LOCATIONOF EX. D-CURBAPPROX. LOCATIONOF EX. D-CURBAPPROX. LOCATIONOF EX. FENCEAPPROX. LOCATIONOF EX. BERMAPPROX. LOCATIONOF EX. BERMAPPROX. LOCATIONOF EX. BERMAPPROX. LOCATIONOF EX. BERMAPPROX. LOCATIONOF EX. BERMREVISE PLAN PER FDEP COMMENTS10-25-2018 APPROX. LOCATIONOF EX. BERMEXISTINGBAGHOUSESRELOCATED BAGHOUSE TO NORTH END OF BUILDING #211-12-20181873'1283'PROPOSED BAGHOUSE TO BE PLACED ONEXISTING CONCRETE SLAB. EX. BUILDING WASREDUCED TO HALF SIZE DUE TO FIRE IN 2019.REFER TO PLANS BY: KICE INDUSTRIES DWG. #'S: 4-39683C, 4-39834C, AND 5-2698C