Loading...
HomeMy WebLinkAboutAPPROVED 3 - SS-Concrete Foundation Letter for Keith Bloomer-10-30-17FL.QI<IDA ENGINEERING AND DESIGN. INC To: Keith Bloomer Sr. Project Manager- Port St. Lucie Liberty Tire Recycling, LLC 9675 Range Line Rd Port St, Lucie, F134987 Phone:(772)-645-0477 Email: kbloomer@libertytire.com Date: 03/16/2021 Project Number: 21-1951 Project Name: Equipment Foundations at Liberty Tire Recycling Drawing Numbers: 21-1951-CS-001; 21-1951-GA-001; 214951-GA-002; 21-1951-C-001; 214951-S-001;21-1951-E-001 It appeared to the Engineer of Record (Ahmadreza Sedaghat) responsible for foundation design of this project that the note appeared as " Compact Backfill to 95% proctor before pouring the concrete foundation" is not required to be executed by the concrete contractor since there is no backfill of any type may occur in this project. o��ZA SFpq �i�� i .tt*•• �ceNs •, cy i� 74461 STATE OF ' o _ s R1 e g , dPE %IfiX 3 Engineer P.E.# 74461 Florida Engineering and Design Inc; 255 County Rd 555 South, Bartow, F133830 Cell: 813-406-2566 Office: 863-665-6363 Email: ahmadreza.sedaghat@fedinc.com