HomeMy WebLinkAboutAPPROVED 3 - SS-Concrete Foundation Letter for Keith Bloomer-10-30-17FL.QI<IDA ENGINEERING AND DESIGN. INC
To: Keith Bloomer
Sr. Project Manager- Port St. Lucie
Liberty Tire Recycling, LLC
9675 Range Line Rd
Port St, Lucie, F134987
Phone:(772)-645-0477
Email: kbloomer@libertytire.com
Date: 03/16/2021
Project Number: 21-1951
Project Name: Equipment Foundations at Liberty Tire Recycling
Drawing Numbers: 21-1951-CS-001; 21-1951-GA-001; 214951-GA-002; 21-1951-C-001;
214951-S-001;21-1951-E-001
It appeared to the Engineer of Record (Ahmadreza Sedaghat) responsible for foundation design
of this project that the note appeared as " Compact Backfill to 95% proctor before pouring the
concrete foundation" is not required to be executed by the concrete contractor since there is no
backfill of any type may occur in this project.
o��ZA SFpq �i��
i
.tt*•• �ceNs •, cy i�
74461
STATE OF '
o _ s
R1 e g , dPE
%IfiX 3
Engineer
P.E.# 74461
Florida
Engineering and Design Inc;
255 County Rd 555 South,
Bartow, F133830
Cell: 813-406-2566
Office: 863-665-6363
Email: ahmadreza.sedaghat@fedinc.com