HomeMy WebLinkAbout2004-0614 blower door-7-7777
Planning & Development Services
J, Building & Code Regulation Division
Fort Pierce, FL 34982
Phone: 772-462-2165 Fax: 772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
Construction:Job Address: tjL�+�Vj FL 3�9f2
(V)New Construction~~Complete ) —After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM Test Dote: �
~~~u..^- ~�
ACH(50)=CFM (50) x 60/ Volume Mechanical Ventilation required less than ACH
Passing results must be & AC.H (50) or less 4A Pass ( ) Fail
F0C,Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding Z air changes per
hour inClimate Zone 1,Zand 3air changes per hour inClimate Zones 3through 8' Testing shall beconducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section SS3993(E\or)(7,HoridaStatutes or�ndk�U
duo|scensedassetforthinSecbon4Q9.1O5(3)(�,(g)or(i)oran
-ird ` ' '' party. A««renrepo written rtofthe results ofthe test shall besigned bythe pa�yconducting the test and
provided tothe code c�f�ix.Testingshall
approved third
beperformnedatanytimeaftercneadonofa||penetrationsofthebuilding
thermal envelope.
FBC,Remidemtia\
Where the air |nfi|tratonrate ofadoxeUingun��less than Iair changes per hour when tested w�hablower door ata
in
filtration
pressure ofO.2inch Vx.c.(5OPa) inaccordance with SectionR4OZ,4-1-2oftheRorida Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M15073.
Testing Company Hro-DuctSBrviceS
Company Name:
1915Rio Vista Drive, Ft. Pierce, FL3494S
|here��r����ob�Ho�|�h���u|�demo���m�ia�v�F�����r��
' requirements in accordance with Section R4O2.412Climate Zone 2.
Signature:
u���|M Klein
Printed Name: ^^~~'�
Ucense/Ce
�0H1H��
�Uio��m#k��������