Loading...
HomeMy WebLinkAbout2004-0614 blower door-7-7777 Planning & Development Services J, Building & Code Regulation Division Fort Pierce, FL 34982 Phone: 772-462-2165 Fax: 772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method Construction:Job Address: tjL�+�Vj FL 3�9f2 (V)New Construction~~Complete ) —After Addition House Infiltration Test Results SLC Climate Zone 2 CFM Test Dote: � ~~~u..^- ~� ACH(50)=CFM (50) x 60/ Volume Mechanical Ventilation required less than ACH Passing results must be & AC.H (50) or less 4A Pass ( ) Fail F0C,Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding Z air changes per hour inClimate Zone 1,Zand 3air changes per hour inClimate Zones 3through 8' Testing shall beconducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section SS3993(E\or)(7,HoridaStatutes or�ndk�U duo|scensedassetforthinSecbon4Q9.1O5(3)(�,(g)or(i)oran -ird ` ' '' party. A««renrepo written rtofthe results ofthe test shall besigned bythe pa�yconducting the test and provided tothe code c�f�ix.Testingshall approved third beperformnedatanytimeaftercneadonofa||penetrationsofthebuilding thermal envelope. FBC,Remidemtia\ Where the air |nfi|tratonrate ofadoxeUingun��less than Iair changes per hour when tested w�hablower door ata in filtration pressure ofO.2inch Vx.c.(5OPa) inaccordance with SectionR4OZ,4-1-2oftheRorida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M15073. Testing Company Hro-DuctSBrviceS Company Name: 1915Rio Vista Drive, Ft. Pierce, FL3494S |here��r����ob�Ho�|�h���u|�demo���m�ia�v�F�����r�� ' requirements in accordance with Section R4O2.412Climate Zone 2. Signature: u���|M Klein Printed Name: ^^~~'� Ucense/Ce �0H1H�� �Uio��m#k��������