Loading...
HomeMy WebLinkAbout980 gopher ridge fatyrrt�:. APPLICATION #:�P1481_g02 � '- .,�"� STATE OF FLORIDA ,� PERMIT #:56-SF-2059570 � :i�` � DEPARTMENT OF HEALTH �t`�; ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM DOCUMENT # : F11590860 ,: ',y ,+. �' CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:O4I3OI2O2O FEE PAID:66O.00 RECEIPT #:56-PID-4388549 APPLICANT: Port St. Lucie Properties, Inc AGENT: Richard Laventure (Laventure &Associates Inc) PROPERTY ADDREss: 980 Gopher Ridge Fort Pierce, FL 34982 LOT: 24, 25, 26, 27 BLOCK: SUED IVI s ION: ID # : 3404-805-0024-000-4 CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ ] [O1] TANK SIZE [1] 1090.00 [2] [ ] [27] SURFACE WATER FT [ ] [02] TANK MATERIAL Polypropylene [ ] [28] DITCHES FT [ ] [03] OUTLET DEVICE [ ] [29] PRIVATE WELLS $2 FT [ ] [04] MULTI -CHAMBERED [ Y N ] [ J [30] PUBLIC WELLS FT [ ] [05] OUTLET FILTER Polylok PL-68 [ ] [31] IRRIGATION WELLS FT [ ] [06] LEGEND 1. 70-143-11DC4 2, [ ] [32] POTABLE WATER 5g FT [ ] [07] WATERTIGHT [ ] [33] BUILDING FOUNDATIONS 7 FT [ ] [08] LEVEL [ ] [34] PROPERTY LINES 12 FT [ ] [09] DEPTH TO LID [ ] [35] OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ ] [10] AREA [1] 679.2 [2] SQFT [ ] [36] DRAINFIELD COVER [ ] [11] DISTRIBUTION BOX HEADER X [ ] [37] SHOULDERS [ ] [12] NUMBER OF DRAINLINES 1, 6.00 2. [ ] [38] SLOPES [ ] [13] DRAINLINE SEPARATION [ ] [39] STABILIZATION 05/07/2021 [ ] [14] DRAINLINE SLOPE [ ] [15] DEPTH OF COVER ADDITIONAL INFORMATION [ ] [16] ELEVATION [ ABOVE / BELOW ]BM 6,00 [ ] [40] UNOBSTRUCTED AREA [ ] [17] SYSTEM LOCATION [ ] [41] STORMWATER RUNOFF [ ] [18] DOSING PUMPS [ ] [42] ALARMS [ ] [19] AGGREGATE SIZE [ ] [43] MAINTENANCE AGREEMENT [ ] [20] AGGREGATE EXCESSIVE FINES [ ] [44] BUILDING AREA [ ] [21] AGGREGATE DEPTH [ ] [45] LOCATION CONFORMS WITH SITE PLAN FILL / EXCAVATION MATERIAL [ ] (46] FINAL SITE GRADING [ ] [22] FILL AMouNT [ ] [47] CONTRACTOR MICHAEL W STUHR (ASHTO [ ] [48] OTHER INFILTRATOR Quick4 Plus EQ36 LP [ ] [23J FILL TEXTURE [ ] [24] EXCAVATION DEPTH ABANDONMENT [ ] [25] AREA REPLACED [ ] [49] TANK PUMPED [ ] [26] REPLACEMENT MATERIAL [ ] [50] TANK CRUSHED & FILLED Comments: Comments are on page 2. � � CONSTRUCTION [ APPROVED / St. Lucie CHD DISAPPROVED ) ' nvironmental Specialis I Brian J Ingram (ENVIRONMENTAL HEALTH) FINAL SYSTEM [ APPROVED / DISAPPROVED ]: �'� St. Lucie CHD Environmental Sp cialist I Nico Montane lorida Department of He (Explanation of Violations on Following page) DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC EH Database v 1.0.1 APisII1F302 F_ID2059570 DATE : 03/11 /2021 DATE : 05/07/2021 Page 2 of 3 �r� �, � . „�"� STATE OF FLORIDA �- %�' DEPARTMENT OF HEALTH ,L'�} ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM ',y CONSTRUCTION INSPECTION AND FINAL APPROVAL 4.,,ca, wr.��' Violation Number Comment Comments APPLICATION # : 'tr-i�` � �;-8'� 8OZ PERMIT #:56-SF-2059570 DOCUMENT #: F11590860 DATE PAID:O4/3O�ZOZO FEE PAID:66O.00 RECEIPT #:56-PID-4368549 The system is sized for 4 bedrooms with a maximum occupancy of 8 persons (2 per bedroom), for a total estimated flow of 400 gpd. New ST, filter, and 6x10 long BED DF installed. No violations, system ok to cover. Contractor notified by phone. Needs final inspection for mound system, gutters, and final site grading. Final inspection completed. Mound system checked, gutters added, and final site grading completed. DH 9016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 69E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 gP14Fi1l302 EID2059570