HomeMy WebLinkAboutCreekside Lot 39-Mullion.pdf6 Universal
Engineering
Sciences
y� P� Company
'�RNaT10N
Inspection Date: S -46 - z /
Project: Gr/1Qees-iA
Address: 3338 -TG/' i7zi �°i
3q
Check one:
K Regular Inspection:
INSPECTION RESULTS
Permit No. "2-0// — d/ 6 3
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
MECHANICAL
Footing
Underground
d
Duct Rough -In
Slab
Floor Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
SPLUM
& Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
g & Test
CHW Piping & Test
Framing
Panel/Feeder
Test
Cond. Piping & Test
Structural
Service/Ground
Storm Pipin& Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
I Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: M 7 olck(z/op
Inspection Results: 4xI AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: I)dT uL Aj --Fc7 zti l udaD 5:
1. v
2.
3.
4.
5.
6.
7.
Inspector's Name: ti ���— Lic.#: Xo 4 b S7
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com