Loading...
HomeMy WebLinkAboutMiramar I Condominium_178245_Structural Analysis_2021-04-264907 NW 43rd Street, Suite D, Gainesville, FL 32606 Pass-Fail Evaluation of the Existing Platform & Antenna Frame Attachment Verizon Wireless Cell Site Equipment Platform and Antenna Upgrades Site located at: Miramar 1 Condominium Verizon Site #178245 9950 South Ocean Drive Jensen Beach, FL 34957 St. Lucie County December 14, 2020 Designed in accordance with the requirements of 7th Edition (2020) Florida Building Code, Wind Loading requirements within Chapter 16. Analysis Prepared for: Tower Engineering Professionals, Inc. Matthew K. Lackey, PE 3401 St. Vardell Lane Suite A Charlotte, NC 28217 Analysis Prepared by: Waylon Francis, EI #EI1100019320 Analysis Reviewed by: John Wayne Mishoe, PhD PE #PE25349 Stephen Matthew Belser, PE #PE67514 JWM Engineering, LLC #CA28619 Signature Date Seal: 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 1 of 99 12/14/2020 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 Table of Contents Page Part 1: Platform Pass-Fail Evaluation Structural Report 4 TEP Proposed Site Plan 10 Selected Pages of Existing Building Construction Documents 11 Wind Loads-Roof Top Equipment 18 RISA 3D Equipment Frame Model 22 Equipment Frame Connections 50 Equipment Frame Base Plate Analysis 52 Hilti Anchor Bolt Checks 55 Frame Knee Brace Checks 59 Building Influence Calculations for Columns 67 Part 2: Antenna Anchor Attachment Evaluation MECA Wind Loads for Antenna 68 TEP Antenna Mount Mapping 70 RISA 3D Equipment Mount Model & Anchor Loading 75 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 2 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 HILTI HIT-HY 150 Anchor Check for Concrete 90 HILTI HIT-HY 270 Anchor Check for Grout Filled Masonry 96 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 3 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 Project Scope of Work and General Conditions Part 1: Scope of Work The scope of work for this part of the project is to structurally evaluate an existing elevated equipment platform on the rooftop of an existing building and its ability to support the installation of a new outdoor equipment cabinet and associated equipment. The existing frame is attached to steel base plates anchored directly over existing concrete building columns. The following evaluations are based upon load requirements of the 2020 Florida Building Code (FBC). This is a Verizon Wireless site located at 9950 South Ocean Drive, Jensen Beach, Florida in St. Lucie County. The photo below shows the platform in its existing conditions prior to equipment addition: Figure 1- Existing Platform at Site Part 2: Scope of Work The scope of work for this project is to evaluate the attachment method used and the anchors ability to support the installation of the proposed antennas and associated equipment. The existing antennas are located at antenna rad center elevation of 184 feet. These evaluations are used to determine loading requirements based upon the TIA-222-H standard and the 2020 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 4 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 Florida Building Code (FBC). This is a Verizon Wireless site located at 9950 South Ocean Drive, Jensen Beach, Florida in St. Lucie County. The photo below shows a typical antenna mount in its existing conditions prior to equipment addition: Figure 2 - Existing Antenna Mounts at Site PART 1 REPORT Structural Analysis The analysis is based upon the following documentation provided to JWME from TEP: 1. Lease Exhibit of the proposed equipment layout, prepared by TEP, dated 12 -07-2020. 2. Proposed Verizon RFDS for the Dune Walk site dated, 11-9-2020. 3. Previous structural design & evaluation of the Miramar 1 site completed by JWME on 08-28-2015. JWME used the best information available to analyze the impact on the building and to determine the required loading. The proposed equipment information was provided by Tower 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 5 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 Engineering Professional, Inc. (TEP) and the data used to determine the required platform loads. Loads considered in the analysis include the following: 1. Wind loads were computed using ASCE 7-16 methods assuming a wind speed of 163 MPH, Building Category II, Exposure D. 2. Dead weight, Live loads and associated wind loads were included based upon code minimum requirements for the roof area. 3. The table below lists the proposed equipment being added to frame and the equipment to remain: Equipment Type Dead Weight (lbs.) Dimension (in) (1) Cabinet: CUBE Large SS 1915 32” x 32” x 84” (1) Raycap OVP12 20 21” x 19” x 6” 4. Other known dead weights, such as grating weights, were also added . Evaluations were conducted on the following major components: 1. Member stresses including the beams, girders, and knee braces. 2. Worst case loaded connections were checked using record drawings and model analysis. 3. Base plate analysis. 4. Anchor bolt connection to existing building analysis. 5. Site photographs and in-field measurements provided to JWME by TEP. Because this is an existing structure, no consideration was given to the continuous load path to the foundation. A building influence of the concrete columns was performed in accordance with the 2020 Florida Building Code: Existing Building 707.2. The contractor must verify any assumptions presented in this report and contact engineering if the assumptions are different from conditions existing in the field. However, with this installation, the additional equipment it not expected to change the overall loading of the structure. Results of Analyses The equipment frame has been evaluated and meets the minimum requirements of the 7th Edition (2020) FBC. The specifications are provided by JWME in the attached calculations. This evaluation assumes the current structure has been kept in good repair, code compliant and 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 6 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 built in accordance with the record drawings. The contractor must verify these assumptions and report to the engineer any discrepancies as it may affect the results of this evaluation. PART 2 REPORT Structural Analysis The analysis is based upon the following documentation provided to JWME from TEP: 1. Lease Exhibit of the proposed equipment layout, prepared by TEP, dated 12-07-2020. 2. Proposed Verizon RFDS for the Dune Walk site dated, 11-9-2020. 3. Previous structural design & evaluation of the Miramar 1 site completed by JWME on 08-28-2015. 4. Site photographs and in-field measurements provided to JWME by TEP. JWME used the best information available to analyze the impact on the building and to determine the required anchor loading. The proposed antenna mount and antenna information was provided by Tower Engineering Professional, Inc. (TEP) and the data used to determine the required anchor loads. Loads considered in the analysis include the following: 1. Wind loads were computed using ASCE 7-16 methods assuming a wind speed of 163 MPH, Building Category II, Exposure D. 2. Dead weight, live loads and associated wind loads were included based upon code minimum requirements for the roof area. 3. The table below lists the proposed equipment being added and the equipment to remain: Mount Elevation (ft) Equipment Elevation (ft) Quantity Manufacture Model Status 177.88 184.00 3 - VZE01 Added 3 Ericsson 4449 3 Ericsson 8843 1 Raycap RHSDC-6627-PF-48 6 JMA Wireless X7CQAP-FRO-645-VR0 Retained 1 30kW Generator - 1 EBRE Battery Cabinet - 1 Raycap OVP Box 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 7 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 This evaluation was conducted using the information provided from TEP to JWME for the Verizon Wireless VZE01 antenna having dimensions 30.4”x15.9”x8.1” and weighs 81.6 lbs . as listed in the above table. This evaluation does not cover antennas with larger dimensions or are of heavier weight. This analysis evaluates the anchorage only and does not evaluate the mount/frame of which the antenna is attached. Results of the Mount Analysis There are three different anchorage/attachment methods evaluated in this report. The first method assumes that the antenna mount anchors were installed into a concrete wall. The second method assumes that the antenna anchors were installed into grout filled CMU and the third assumes that the mount was attachment using thru bolts with backer plates. Method 1: Anchor into Concrete This evaluation was completed using the HILTI HIT-HY 150 Anchor Epoxy systems using a total of four (4) 3/4"Ø threaded rods with a embedment depth of 3-3/8” into the concrete as stated in the previous Verizon CD’s with signed and sealed date 10/19/2015 provided to JWME by TEP. JWME used the RISA finite element program to generate a model of the existing antenna mount provided by TEP. The anchor loads from the RISA model were compared against the loads from the HILTI HIT-HY 150 loads tables and maximum unity code of 0.33 was recorded meaning that the anchor is loaded to 33% of its overall capacity. The calculations can be found on page 90 of this report. Based upon the results of our analysis, the antenna frame anchors WILL support the proposed antenna and mount if installed into concrete. The following evaluations are based upon loading requirements of the TIA-222-H standard and the 2020 Florida Building Code (FBC). Method 2: Anchor into Grout Filled CMU This evaluation was completed using the HILTI HY 270 Anchor Epoxy systems using a total of four (4) 3/4"Ø threaded rods with an embedment depth of 6-3/4” into the grout filled CMU. JWME used the RISA finite element program to generate a model of the existing antenna mount provided by TEP. The anchor loads from the RISA model were then transferred to the HILTI PROFIS Engineering software where maximum unity code of 0.56 was recorded meaning that the anchor is loaded to 56% of its overall capacity. The calculations can be found on page 96 of this report. Based upon the results of our analysis, the antenna frame anchors WILL support the proposed antenna and mount if installed into concrete. The following evaluations are based upon loading requirements of the TIA-222-H standard and the 2020 Florida Building Code (FBC). 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 8 of 99 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 Method 3: Thru Bolts with Backer Plate(s) This attachment method assumes the uses (4) 5/8"Ø threaded rods (thru bolts) with 6”x6”x1/2” backer plates through ungrouted CMU as stated. The details of this method were documented in the previous Verizon CD’s dated 10/19/2015 provided to JWME by TEP. The method of using thru bolts with backers plates have been used and has been proven to work in multiple applications including antenna mount attachments. From pass experiences, JWME believes that because a smaller and lighter antenna is replacing a larger antenna , the existing thru bolt attachment method will support the proposed antenna and associated equipment. 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 9 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 10 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 11 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 12 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 13 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 14 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 15 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 16 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 17 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County 12/10/2020Equipment CabinetsWind Load Calculations EQUIPMENT CABINET WIND LOAD CALCULATIONS ASCE 7-10 (CH 29) Unit Definition LEGEND INPUT CALCUATIONS RESULTS Define Miscellaneous Unit Variables. plf lbf ft:=psf lbf ft2:=pcf lbf ft3:=kip 1000lbf:=ksi kip in2:=SF ft 2:=CF ft 3:= Site Location Verizon Site Name: Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County Codes Design Codes: 7th Edition (2020) Florida Building CodeReference Codes: ASCE 7-16, ACI 318-14 and AISC Steel Construction Manual, 14th Ed. Assumptions: Assume cabinets and frame are analyzed using Ch. 29 Chimneys, Tanks, Rooftop Equipment, & SimilarStructures Method as modified by FBC 2020 CH 16 Section 1620Assume cabinets are only carried by primary beams.Assume loading from cabinets is equivalent to point load at the center of each cabinet on each beam. Verizon Cabinet Information Modular Cell Cabinets CS 4:=*i 0 CS 1-( )..:=*j 0 CS 2-( )..:=* T:\JWME\Jobs\Tower Engineering Professionals Designed by: WM-SB MathCAD Page 1 of 4 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 18 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County 12/10/2020Equipment CabinetsWind Load Calculations Code "Cabinet Type" Lo Wo Ho lbs CSTotal number of cabinets CABINETS 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 "EBRE Battery Cabinet" "BTS Cabinet - Mod 4.0B" "CUBE Cabinet Large SS Series" "Generator-trans" "Emerson Microwave" "Lucent Battery Cabinet" "LTE-ODE 6201 Ericsson" "SSC-Delta-Med. (ESOA) " "FCOA-Nokia Siemens" "10kw Fuel Cell-black hand" "15kw Fuel Cell-black hand" "Storage - Large - Fuel Cell" "Storage - Med - Fuel Cell" "LTE ODE 6201 w BRAM Bat." "MOD 4.0B w BRAM Bat." "(2) SSC-Small-Stacked " "(1) SSC - Small" "Generac 30kW NG" "Generac 30kW NG-Transp." "RBA72 Cabinet" "Back Fibre Cabinet" "LP Tank" "LP Tank Trans" 36 35.4 32 72 30 31 36 29.5 30.3 26.2 26.2 39 27 36 35.4 26 26 40 92.9 30 30 37 120 38 40 32 30 31 30 36 34.1 30.3 43.2 43.2 39 39 36 40 26.75 26.75 92.9 40 39 18 120 37 78 72 84 56 98 60 72 54 61 72 94 72 72 88 88 74 37 71.2 71.2 72 36 37 37 4960 1424 1915 2750 1200 3000 715 1500 789 974 1461 1353 929 1600 2308 1574 787 2750 2750 3000 1000 940 940 21 21 60 30 21 21 21 20.3 21 21 21 21 21 21 21 21 21 35.5 85 21 14 30 100   := Rc rows CABINETS() 23=:= ii 0 Rc 1-..:= iii 0 1..:= Cabcodeii iii, CABINETSii iii, := Chose your Cabinets based off the Cabinet Code Cabinet Type &Layout for Site Cabinet Locationon Beams SITE 0 1 17 18   :=LOCATION 9 12 18 20   ft:= Equipment Name EquipVei CABINETSSITEi 1, :=EquipVe "EBRE Battery Cabinet" "BTS Cabinet - Mod 4.0B" "Generac 30kW NG" "Generac 30kW NG-Transp."   = T:\JWME\Jobs\Tower Engineering Professionals Designed by: WM-SB MathCAD Page 2 of 4 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 19 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County 12/10/2020Equipment CabinetsWind Load Calculations HIDDEN AREA: Calculations Building Information Lbuilding.normal.beam 90ft:=Depth of building perpendicular to cabinets support beams Lbuilding.parallel.beam 90ft:=Depth of building parallel to cabinets support beams BuildingTop.AGL 167ft:=Height of Building above grade hcab.clear 1.5ft:=Vertical distance from roof top to bottom of cabinet Lstructure 18ft:=Width of Structure perpendicular to equipment cabinet face Select Building Exposure Category as define in ASCE 7 or FBC Beamspacing 2.5ft:=Spacing Between Beams Beambf 8in:=Flange Width of Beams V 163:=Ultimate Wind Speed HIDDEN AREA: Calculations Loads Load Path Cabinet vertical loads carried by beams to girders to columns to building frame.Frame vertical loads carried by beams to girders to columns to building frame. Determine wind load on Cabinets and Frame Assume Rooftop Structures and Equipment For Buildings w/ Height <= 60 ft (ASCE 7-16 29.5.2) and Height > 60 ft (Eq29.5.1. HIDDEN AREA: Calculations SUMMARY OF CABINET REACTIONS DEAD LOADS BEAM #1 BEAM #2 EQUIPMENT RAy.DLi 2480 712 1375 1375   lbf=RBy.DLi 2480 712 1375 1375   lbf=EquipVei "EBRE Battery Cabinet" "BTS Cabinet - Mod 4.0B" "Generac 30kW NG" "Generac 30kW NG-Transp."   = T:\JWME\Jobs\Tower Engineering Professionals Designed by: WM-SB MathCAD Page 3 of 4 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 20 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County 12/10/2020Equipment CabinetsWind Load Calculations WIND LOADS VERTICAL REACTIONS (CASE A AND B) EQUIPMENT UPLIFT DOWN FORCE EquipVei "EBRE Battery Cabinet" "BTS Cabinet - Mod 4.0B" "Generac 30kW NG" "Generac 30kW NG-Transp."   =RAy.WLi 3948.6 3443.2 4880 8877.4   lbf=RBy.WLi 2581.1- 2027.8- 1165.4- 5162.9-   lbf= LATERAL REACTIONS (CASE A AND B)EQUIPMENT EquipVe "EBRE Battery Cabinet" "BTS Cabinet - Mod 4.0B" "Generac 30kW NG" "Generac 30kW NG-Transp."   =RAx.WLi 1590.6- 1443.8- 1613.2- 3746.7-   lbf=RBx.WLi 1590.6- 1443.8- 1613.2- 3746.7-   lbf= Horizontal(Load Case C&D)Moment Reactions(Load Case C&D) Rzmax 3746.7 lbf=Mmax 11115.3 lbf ft= HIDDEN AREA: Calculations Distributed Wind Loading on frame members Beamd 12in:=Beam Depth Girderd 12in:=Girder Depth Columnd 4in:=Column Width Columnw 4in:=Column Depth BeamPLF max Pz Beam d( ) 163.1 plf=:=Distributed Wind Load along Beam GirderPLF max Pz Girderd( ) 163.1 plf=:=Distributed Wind Load along Girder Columnd.plf max Pz Columnd()54.4 plf=:=Distributed Wind Load along Column (Depth side) Columnw.pdf max Pz Columnw()54.4 plf=:=Distributed Wind Load along Column (Width side) T:\JWME\Jobs\Tower Engineering Professionals Designed by: WM-SB MathCAD Page 4 of 4 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 21 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 22 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 23 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 24 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 25 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 26 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 27 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 28 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 29 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 30 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 31 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 32 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 33 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 34 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 35 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 36 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 37 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 38 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 39 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 40 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 41 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 42 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 43 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 44 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 45 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 46 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 47 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 48 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 49 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 50 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 51 of 99 Company :JWME December 10, 2020 Designer :W. FRANCIS Miramar 1- Equipment Frame BPJob Number :178245 Checked By:_____ 12 in 12 inZ X 1 2 3 4 Bolt X (in) Z (in) 1 4.5 4.5 2 -4.5 4.5 3 4.5 -4.5 4 -4.5 -4.5 Geometry and Materials Length Column Shape Anchor Bolt Diameter Width Column eX Anchor Bolt Material Thickness Column eZ Anchor Bolt Fu Base Plate Fy Column to Edge Min (X)Anchor Bolt Fy Base Plate E Column to Edge Min (Z)Anchor Bolt E Bearing Fp AB Stretch Length Bearing Fc'AB to AB Min Spacing Pedestal Length AB to Stiffner Min Spacing AB to Column Min SpacingPedestal Width Pedestal Height AB to Edge Min Spacing AB Row Min Spacing Steel Code: Concrete Code: AB Head: Total AB Length: Seismic Reduction %: Tension Anchor Reinf Bar Fy: Shear Anchor Reinf Bar Fy: 12. in HSS4x4x4 .75 in 12. in 0. in A307 .75 in 0. in 60. ksi 36. ksi 1. in 36. ksi 29000. ksi 1. in 29000. ksi 3.683 ksi HSS Tube X-sides welded 6. in 4. ksi HSS Tube Z-sides welded 3 in 20 in Plain Base Plate Connection 1.5 in 20 in Vx Shear Lug NOT present 1.5 in Vz Shear Lug NOT present20 in 1.5 in Analyze Base Plate as Flexible 3 in Pp Based on AISC J8 Criteria Priority is AB to Edge Spacing AISC 14th:LRFD Include Threads for AB Design ACI 318-11 AB Fv, Ft based on AISC Criteria Square NW Concrete 16. in 25.Concrete NOT Cracked NO Supp. Reinforcement NO Anchor ReinforcementABs NOT Welded to Base Plate N.A. N.A. Loads P (lb)Vx (lb)Vz (lb) Mx (lb-ft) Mz (lb-ft) DL LL WL OL1 5678.301.51. 5822.2260.-2.5 -1686.-7831.-28. -7842.-423.-7045. Base Plate Stress and Bearing Result Base Plate Stress (ksi)Bearing Pressure (ksi) Combination Load Sets Allowable ASIF U.C. Allowable ABIF U.C. ASCE Strength 1 (1)1.4DL 48.6 1. .011 3.683 1. .082 ASCE Strength 2 (a) (2) 1.2DL+1.6LL 48.6 1. .023 3.683 1. .165 ASCE Strength 3 (b) (3) 1.2DL+.5WL 48.6 1. .008 3.683 1. .063 (4)1.2DL+.5OL1 48.6 1. .004 3.683 1. .033 ASCE Strength 4 (a) (5) 1.2DL+.5LL+1WL 48.6 1. .011 3.683 1. .083 (6)1.2DL+.5LL+1OL1 48.6 1. .003 3.683 1. .023 ASCE Strength 6 (7) .9DL+1WL 48.6 1. .005 3.683 1. .038 (8).9DL+1OL1 48.6 1. .068 3.683 1. .222 RISABase Version 2.10 [T:\JWME\Jobs\Tower Engineering......LCULATIONS\Miramar- Equipment BasePlate 178245.rbs] Page 1 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 52 of 99 Company :JWME December 10, 2020 Designer :W. FRANCIS Miramar 1- Equipment Frame BPJob Number :178245 Checked By:_____ Bearing Contours .303 (ksi) .004 1.4DL Allowable U.C. : 3.683 ksi : .082 .607 (ksi) 0. 1.2DL+1.6LL Allowable U.C. : 3.683 ksi : .165 .232 (ksi) .007 1.2DL+.5WL Allowable U.C. : 3.683 ksi : .063 .121 (ksi) .012 1.2DL+.5OL1 Allowable U.C. : 3.683 ksi : .033 .306 (ksi) .004 1.2DL+.5LL+1WL Allowable U.C. : 3.683 ksi : .083 .085 (ksi) .014 1.2DL+.5LL+1OL1 Allowable U.C. : 3.683 ksi : .023 .14 (ksi) .011 .9DL+1WL Allowable U.C. : 3.683 ksi : .038 .818 (ksi) 0. .9DL+1OL1 Allowable U.C. : 3.683 ksi : .222 Base Plate Stress Contour .533 (ksi) .000840549 1.4DL Allowable U.C. : 48.6 ksi : .011 1.115 (ksi) .051 1.2DL+1.6LL Allowable U.C. : 48.6 ksi : .023 .4 (ksi) .000631331 1.2DL+.5WL Allowable U.C. : 48.6 ksi : .008 .194 (ksi) .000305864 1.2DL+.5OL1 Allowable U.C. : 48.6 ksi : .004 .539 (ksi) .000850002 1.2DL+.5LL+1WL Allowable U.C. : 48.6 ksi : .011 .126 (ksi) .000199066 1.2DL+.5LL+1OL1 Allowable U.C. : 48.6 ksi : .003 RISABase Version 2.10 [T:\JWME\Jobs\Tower Engineering......LCULATIONS\Miramar- Equipment BasePlate 178245.rbs] Page 2 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 53 of 99 Company :JWME December 10, 2020 Designer :W. FRANCIS Miramar 1- Equipment Frame BPJob Number :178245 Checked By:_____ Base Plate Stress Contours (continued) .23 (ksi) .000362075 .9DL+1WL Allowable U.C. : 48.6 ksi : .005 3.286 (ksi) 0. .9DL+1OL1 Allowable U.C. : 48.6 ksi : .068 Anchor Bolt Results Note: Fnt and Fnv shown below include phi factors. Combination Load Sets Bolt Tens.(lb) Vx (lb) Vz (lb) Fnt (ksi) ft (ksi) Fnv (ksi) fv (ksi) Unity ASCE Strength 1 (1)1.4DL 1 0. -105.35 -17.85 45. 0. 27. .242 .012 (S) 2 0. -105.35 -17.85 45. 0. 27. .242 .012 (S) 3 0. -105.35 -17.85 45. 0. 27. .242 .012 (S) 4 0. -105.35 -17.85 45. 0. 27. .242 .012 (S) ASCE Strength 2 (a) (2) 1.2DL+1.6LL 1 48.549 -994.3 -14.3 45. .11 27. 2.251 .111 (S) 2 48.549 -994.3 -14.3 45. .11 27. 2.251 .111 (S) 3 48.549 -994.3 -14.3 45. .11 27. 2.251 .111 (S) 4 48.549 -994.3 -14.3 45. .11 27. 2.251 .111 (S) ASCE Strength 3 (b) (3) 1.2DL+.5WL 1 0. 888.575 -11.8 45. 0. 27. 2.011 .099 (S) 2 0. 888.575 -11.8 45. 0. 27. 2.011 .099 (S) 3 0. 888.575 -11.8 45. 0. 27. 2.011 .099 (S) 4 0. 888.575 -11.8 45. 0. 27. 2.011 .099 (S) (4)1.2DL+.5OL1 1 0. -37.425 865.325 45. 0. 27. 1.96 .097 (S) 2 0. -37.425 865.325 45. 0. 27. 1.96 .097 (S) 3 0. -37.425 865.325 45. 0. 27. 1.96 .097 (S) 4 0. -37.425 865.325 45. 0. 27. 1.96 .097 (S) ASCE Strength 4 (a) (5) 1.2DL+.5LL+1WL 1 0. 1584.95 -7.987 45. 0. 27. 3.588 .177 (S) 2 0. 1584.95 -7.987 45. 0. 27. 3.588 .177 (S) 3 0. 1584.95 -7.987 45. 0. 27. 3.588 .177 (S) 4 0. 1584.95 -7.987 45. 0. 27. 3.588 .177 (S) (6)1.2DL+.5LL+1OL1 1 0. -267.05 1746.26 45. 0. 27. 3.999 .197 (S) 2 0. -267.05 1746.26 45. 0. 27. 3.999 .197 (S) 3 0. -267.05 1746.26 45. 0. 27. 3.999 .197 (S) 4 0. -267.05 1746.26 45. 0. 27. 3.999 .197 (S) ASCE Strength 6 (7) .9DL+1WL 1 0. 1890.02 -4.475 45. 0. 27. 4.278 .211 (S) 2 0. 1890.02 -4.475 45. 0. 27. 4.278 .211 (S) 3 0. 1890.02 -4.475 45. 0. 27. 4.278 .211 (S) 4 0. 1890.02 -4.475 45. 0. 27. 4.278 .211 (S) (8).9DL+1OL1 1 924.947 38.025 1749.77 45. 2.094 27. 3.961 .196 (S) 2 924.868 38.025 1749.77 45. 2.093 27. 3.961 .196 (S) 3 924.857 38.025 1749.77 45. 2.093 27. 3.961 .196 (S) 4 924.779 38.025 1749.77 45. 2.093 27. 3.961 .196 (S) RISABase Version 2.10 [T:\JWME\Jobs\Tower Engineering......LCULATIONS\Miramar- Equipment BasePlate 178245.rbs] Page 3 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 54 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 1 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condominium Page: Specifier: E-Mail: Date: 1 WF 12/10/2020 Specifier's comments: 1 Input data Anchor type and diameter: HIT-HY 200 + HAS-V-36 (ASTM F1554 Gr.36) 3/4 Item number: 2198028 HAS-V-36 3/4"x6" (element) / 2022793 HIT-HY 200-R (adhesive) Effective embedment depth: hef,opti = 3.500 in. (hef,limit = 15.000 in.) Material: ASTM A 1554 Grade 36 Evaluation Service Report: ESR-3187 Issued I Valid: 4/1/2020 | 3/1/2022 Proof: Design Method ACI 318-14 / Chem Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in. Anchor plateR : lx x ly x t = 12.000 in. x 12.000 in. x 0.500 in.; (Recommended plate thickness: not calculated) Profile: Square HSS (AISC), HSS4X4X.25; (L x W x T) = 4.000 in. x 4.000 in. x 0.250 in. Base material: cracked concrete, 2500, fc' = 2,500 psi; h = 420.000 in., Temp. short/long: 32/32 °F Installation: hammer drilled hole, Installation condition: Dry Reinforcement: tension: condition B, shear: condition B; no supplemental splitting reinforcement present edge reinforcement: none or < No. 4 bar R - The anchor calculation is based on a rigid anchor plate assumption. Geometry [in.] & Loading [lb, in.lb] 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 55 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 2 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condominium Page: Specifier: E-Mail: Date: 2 WF 12/10/2020 1.1 Design results Case Description Forces [lb] / Moments [in.lb]Seismic Max. Util. Anchor [%] 1 Combination 1 N = 4,361; Vx = 570; Vy = 9,281; Mx = 0; My = 0; Mz = 0; Nsus = 0; Mx,sus = 0; My,sus = 0; no 35 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 56 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 3 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condominium Page: Specifier: E-Mail: Date: 3 WF 12/10/2020 2 Proof I Utilization (Governing Cases) Design values [lb]Utilization Loading Proof Load Capacity bN / bV [%]Status Tension Concrete Breakout Failure 4,361 12,477 35 / -OK Shear Pryout Strength (Concrete Breakout Strength controls) 9,298 26,874 - / 35 OK Loading bN bV z Utilization bN,V [%]Status Combined tension and shear loads 0.350 0.346 5/3 35 OK 3 Warnings • Please consider all details and hints/warnings given in the detailed report! Fastening meets the design criteria! 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 57 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 4 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condominium Page: Specifier: E-Mail: Date: 4 WF 12/10/2020 4 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific application. • You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or programs, arising from a culpable breach of duty by you. 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 58 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design KNEE BRACE CONNECTION DESIGN AISC 15TH Ed. LRFD Unit Definition LEGEND INPUT CALCUATIONS RESULTS Define Miscellaneous Unit Variables. plf( )1 lbf ft=psf( )1 lbf ft2=pcf( )1 lbf ft3=kip( )1 10 3lbf=ksi( )1 kip in2=SF ft 2:=( )CF ft 3:=( )pi 3.142:= Site Location INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County NOTES: This procedure is based on Chapters J&K of AISC 15th Edition.1.Any Unity Code (UC) above 1.0 represents a failed design check.2. Column Information Girder/Beam Information Bolt Information Column0 "HSS "4x4x1/4":=Girder "W12x26":=Girder Type Bolt "A490X":=Bolt TypeColumn Type Fy.c 46ksi:=Fy.g 50ksi:=()Yield Strength of Member NominalShearStrength Member Yield Strength Fnv.b 84ksi:= Fu.c 58ksi:=Member Tensile Strength Fu.g 65ksi:=()Tensile Strength of Member Bc 4in:=Column Width CMD 12:=Member Nominal Depth Fnt.b 113ksi:=NominalTensionStrength CMW 26:=Member Nominal Weighttc1 4 in:=Column Thickness Es 29000ksi:=()Modulus of ElasticityAc3.37in2:=Area of Coulmn Sx.g 33.4in3:=Section Modulus of W-SectionSc3.90in3:=Section Modulus of Column HIDDEN AREA: Calculations Load Information ORIGIN 0:=() Pu 0kip:=Required Design Shear Strength of Connector (Y Axis From RISA Model) Zshear 0kip:=Required Design Shear Strength of Connector (Z Axis From RISA Model) T:\JWME\Jobs\Tower Engineering 1 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 59 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design Lev.min 1in:=Minimum Edge Distance Table J3.4 b 45deg:=Angle of knee brace from the Y axis(XY Plane)Dbolt 3 4 in:=Bolt Diameter HIDDEN AREA: Calculations Lcc 0in:=Must be >/= L.cc.min Required Design x Tensile Strength Axial force in bracemember Array. Set up for two cases LFRD FORCES.Faxial.b 19.4 0 kip:= HIDDEN AREA: Calculations Determine The Number of Bolts 3.1 0.75:=()LRFD Factor Rn3.1 3.1 Fnv.bAb27.836 kip=:=()Design Shear Strength of A Snug-Tightened Bolt (Eq. J3-1) Nbolt.req ceil Faxial.b Rn3.1 1 0 =:=Number of Bolts Required Nbolt 1:=Design Number of Bolts Nhole 1:=Number of Holes perpendicular to tension load Connector Information Connector "Angle 4"x4"x1/4":=Connector Type Nc 1 1 :=Number of Braces Per Connector Fy.b 36ksi:=Connector Yield Strength Fu.b 58ksi:=Connector Tensile Strength tb 1 4 in:=Thickness connector Ag.b 1.93in2:=Area of Connector rz 0.783in:=Radius of Fillet xbar.b 1.08in:=Center of Gravity X axis ybar.b 1.08in:=Center of Gravity Y axis Lb.total 1.42ft:=Total Brace Length T:\JWME\Jobs\Tower Engineering 2 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 60 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design lb 4in:=Width of Connector Lec 2.0in:=Distance From Center of Connection To Edge HIDDEN AREA: Calculations lb.check "OK" l b lb.minif "Width of Angle too small" otherwise "OK"=:= Tensile Yielding In The Gross Section d.2.1 0.90:=LFRD HIDDEN AREA: Calculations Unity Code Check on Tensile Tielding Angle (Eq. D2-1)UC Pn.d.2.1 Faxial.b N c Pn.d.2.1 0.3 0.0 =:= Tensile Rupture In The Net Section HIDDEN AREA: Calculations d.2.2 0.75:=LFRD HIDDEN AREA: Calculations UC Pn.d.2.2 Faxial.b N c Pn.d.2.2 0.5 0.0 =:=Unity Code Check on Tensile Rupture Angle (Eq. D2-2) Block Shear Strength of Brace HIDDEN AREA: Calculations Unity Code Check on Block Shear Angle (Eq. J4-5)UC R.n.4.5.b Faxial.b N c Rn4.5.b 0.4 0.0 =:= Bearing Strength at Bolt Hole in Brace 3.6 0.75:=()LFRD( ) HIDDEN AREA: Calculations Unity Code Check on Bearing Strength Angle (Eq. J3-6a)UC Rn.3.6a.b Faxial.b Nc Nbolt Rn.3.6a.b 0.99 0.00 =:= T:\JWME\Jobs\Tower Engineering 3 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 61 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design Connector Plate Design ASTM A36 (Plate Material) Holetype "STD":=Hole Type (Table 10-9) Fy.p 36ksi:=Plate Yield Strength Fu.p 58ksi:=Plate Tensil Strength Lcc 0in:=Spacing Between Bolts (1 bolt used) Dp 10in:=Design Plate Height Dcp Lcc sin b( ) 0 in=:=Vert. Distance Between Bolts Det 5in:=Distance Center of Bolt to Plate Vert. Edge Dep Dp Det Dcp+( ) -5 in=:= Wp 10in:=Design Plate Length Wep 5in:=Distance Center of Bolt to Plate Horz. Edge Wcp Lcc cos b( ) 0 in=:=Horz. Distance Between Bolts Wet Wp Wcp-Wep-5 in=:= tp 3 8 in:=Thickness Plate Single Plate Connection Design Checks: HIDDEN AREA: Calcuations tp.check "Plate thickness OK"=Plate Thickness Check HIDDEN AREA: Calculations Plate Connection Calculations HIDDEN AREA: Calculations Rn.t.dgn.UC.p Pr.tension.plate min Rn.4.1.p.t Rn.4.2.p.t, ()0.1 0.0 =:=Unity Code of Connector Strength in Tension(Eq. J4-1 & J4-2) Strength of Plate in Shear HIDDEN AREA: Calculations UC R.n.4.3.p Pr.shear.plate Rn4.3.p 0.2 0.0 =:=Unity Code Check of Connector in Gross Shear (Eq. J4-3) HIDDEN AREA: Calculations T:\JWME\Jobs\Tower Engineering 4 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 62 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design UC R.n.4.4.p Pr.shear.plate Rn4.4.p 0.2 0 =:=Unity Code Check of Connector in Net Shear (Eq. J4-4) Block Shear Strength of Plate HIDDEN AREA: Calculations UC R.n.4.5.p Pr.shear.plate Rn4.5.p 0.1 0.0 =:=Unity Code Check on Block Shear (Eq. J4-5) Bearing Strength at Bolt Hole in Connector Distance in Direction of Force Between Edges of Bolt Holes. If Just One Bolt Is Used, ItBecomes The Distance From the Edge of The Bolt Hole To The Edge of The Material (Eq. J3-6a) Leh.plate.edge 2.0in Dbolt 2 -1.625 in=:=Distance From Hole Edge To Edge of Material. Ls.1.p min Leh.plate.edge()lp 1Dhole-( ) , 1.625 in=:=Input Number of Bolts HIDDEN AREA: Calculations Unity Code Check at Bolt Hole in Connector (Eq. 3-6a)UC Rn.3.6a.p F axial.b N bolt Rn.3.6a.p 0.7 0.0 =:= Weld Design tweld 3 16 in:=Weld Size in Sixteenths of An Inch HIDDEN AREA: Calculations Cexx 1:=Electrode Strength Coefficient (Table 8-3) HIDDEN AREA: Calculations aecc ex lweld 0.5=:= b 45 deg=k tp lweld 0.038=:= Cecc 2.87:=Eccentrically Loaded Weld Group With Angle (Table 8-4) HIDDEN AREA: Calculations T:\JWME\Jobs\Tower Engineering 5 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 63 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design UC Rn.8.13 Faxial.b Rn.8.13 0.3 0 =:=Unity Code for Stregth of Weld (Eq. 8-13) HSS Shear Rupture Welds HIDDEN AREA: Calculations tmin.HSS.check "OK" t c tmin.HSSif "HSS Wall thickness too thin, resize" otherwise "OK"=:= HSS Member Thickness Check tmin.connector.check "OK" tmin.connector tptp.maxif "Shear Plate thickness, resize" otherwise "OK"=:= Connector Thickness Check Available Strengths of Plate-to-Rec. HSS Connections (Table K1.2 Functions): HIDDEN AREA: Calculations CheckK1.3 "OK" t p Fu.p Fy.p tcif "Fails Eq. K1-3" otherwise "OK"=:=Plate Thinkness Check Table K1.2 (K1-3) HIDDEN AREA: Calculations UC Rn.k.1.12 Faxial.b0 Rn.k.1.12 0.5 0.5 0.5  =:=Unity Code for HSS Member Plastification (1) UC Rn.k.1.12 Faxial.b1 Rn.k.1.12 0 0 0  =:=Unity Code for HSS Member Plastification (2) UC Rn.k.1.13 Faxial.b0 Rn.k.1.13 0.2 0.2 0.2  =:=Unity Code For HSS Member Punching Shear (1) UC Rn.k.1.13 Faxial.b1 Rn.k.1.13 0 0 0  =:=Unity Code For HSS Member Punching Shear (2) HIDDEN AREA: Calculations K1.3 "OK, for Plate Limit States and HSS Punching Shear"= T:\JWME\Jobs\Tower Engineering 6 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 64 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design Summary of Design Bolt Information Bolt( )"A490X"=Bolt Type Dbolt( ) 0.75 in=Bolt Diameter Nbolt( ) 1=Number of Bolts Dhole( ) 0.812 in=Bolt Hole Diameter Plate Information Wp 10 in=Plate Length Wet 5 in=Distance from Edge Col. To Center of Hole Wcp 0 in=Horz.Spacing Between Holes Wep 5 in=Distance from Center of Hole To Fwd Edge of Plate Dp 10 in=Plate Height Det 5 in=Distance from Top Edge Col. To Center of Hole Dcp 0 in=Vert. Spacing Between Holes Dep 5 in=Distance fron Center of Hole To Lower Edge of Plate Dhole 0.812 in=Diameter of Hole tp 0.375 in=Plate Thickness Connector Information Connector( )"Angle 4"x4"x1/4"= Nc 1 1=Number of Braces Per Connector Dhole( ) 0.812 in= Leh 2.406 in= Lcc 0 in= Lec 2 in= tb 0.25 in= T:\JWME\Jobs\Tower Engineering 7 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 65 of 99 INLAND TOWERST-Mobile Site #6MD1673M2075 NE 164TH StreetNorth Miami Beach, FL 33160Miami-Dade County 12/10/2020Knee Brace Connection Design Design Force Faxial.b 19.4 0 kip= Fillet Weld of Plate to HSS Member (All Around) Using An E70XX Electrode tweld 0.187 in=Fillet Weld Thickness lweld 10 in=Fillet Weld Length T:\JWME\Jobs\Tower Engineering 8 of 8 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 66 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/10/2020Building Influence Check BUILDING INFLUENCE CHECK ON EXISTING CONCRETE COLUMN LEGEND Unit Definition INPUT CALCUATIONS RESULTS Define Miscellaneous Unit Variables. plf 1 lbf ft=psf 1 lbf ft2=pcf 1 lbf ft3=kip 1 10 3lbf=ksi 1 kip in2=SF ft 2:=CF ft 3:= Site Location Verizon Site Name: Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County NOTES: This mathcad sheet checks the influence of the imposed verticle load on an existing building concrete1.column axial axis per 2020 FBC:EB 707.2. n 1:=Number of Columns Checked i 0 n 1-..:= Lcol 28( )in:=Length of Concrete Column Wcol 16( )in:=Width of Concrete Column HIDDEN AREA: Calculations fc 3000psi:=Concrete Strength frebar 60ksi:=Rebar Strength Fy.max 14390( )lbf:=Maximum Vertical Load from RISA at worse case column, worst case loadcombination (LFRD Value) 10.2 0.65:=LFRD Factor HIDDEN AREA: Calculations Loadchecki Fy.max i Pn.10.2i  := Loadcheck 1.977( ) %=Percent Increase in of Load on Column's Capacity HIDDEN AREA: Calculations Result "Less than 5% increase in Column Capacity, no further analysis needed per 2020 FBC:EB 707.2."()= T:\JWME\Jobs\Tower Engineering Professionals JWM Engineering, LLC 1 of 1 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 67 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 68 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 69 of 99 FCC # UNKNOWN Tower Owner: Site Name: Site Number or ID: Mapping Contractor:This antenna mapping form is the property of TES and under PATENT PENDING. The formation contained herein is considered confidential in nature and is to be used only for the specific customer it was intended for. Reproduction, transmission, publication, modification or disclosure by any method is prohibited except by express written permission of TES. All means and methods are the responsibility of the contractor and the work shall be compliant with ANSI/ASSE A 10.48, OSHA, FCC, FAA and other safety requirements that may apply. TES is not warrantying the usability of the safety climb as it must be assessed prior to each use in compliance with OSHA requirements. Antenna Mount Mapping Form (PATENT PENDING) PRIVATE Mapping Date:8/27/2020 VZW: Miramar I Condominium Tower Type:Other VZW: 151 Tower Height (Ft.):171.25 RKS Design & Engineering LLC.Mount Elevation (Ft.):187.42 Please Insert Sketches of the Antenna Mount 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 70 of 99 Please Insert Sketches of the Antenna Mount, cont'd178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 71 of 99 Please Insert Sketches of the Antenna Mount, cont'd 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 72 of 99 Please Insert Sketches of the Antenna Mount, cont'd 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 73 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 74 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 75 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 76 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 77 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 78 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 79 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 80 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 81 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 82 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 83 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 84 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 85 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 86 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 87 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 88 of 99 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 89 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/11/2020HILTI HY 150 EPOXY ANCHOR CHECK HILTI HIT-HY 150 EPOXY LEGEND UNIT DEFINITION INPUT CALCUATIONS RESULTS plf 1 lbf ft=psf 1 lbf ft2=pcf 1 lbf ft3=kip 1 10 3lbf=ksi 1 kip in2=SF ft 2:=CF ft 3:= Site Location Verizon Site Name: Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957St. Lucie County Codes Design Codes: 7th Edition (2018) Florida Building CodeReference Codes: ASCE 7-16, ACI 318-19 and AISC Steel Construction Manual, 15th Ed. DHY150 3 4 in:=Anchor Diameter fc.ccrete 3000psi:=Existing Concrete Column Lembedment 3.375in:=Embedment Depth of Bolt Trisa.max 1424( )lbf:=Maximum Factored Tension Load on Single Bolt (From RISA BASE Model) Vrisa.x.max 261( )lbf:=Maximum Factored X Shear Load on Single Bolt (From RISA BASE Model) Vrisa.y.max 349( )lbf:=Maximum Factored Y Shear Load on Single Bolt (From RISA BASE Model) Vrisa.max Vrisa.x.max2 Vrisa.y.max2+0.436( ) kip=:=Maximum Shear Component on Single Bolt T:\JWME\Jobs\Tower Engineering Professionals\178245 - Miramar 1 Condominium\CALCULATIONS\Antenna 1 of 6 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 90 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/11/2020HILTI HY 150 EPOXY ANCHOR CHECK T:\JWME\Jobs\Tower Engineering Professionals\178245 - Miramar 1 Condominium\CALCULATIONS\Antenna 2 of 6 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 91 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/11/2020HILTI HY 150 EPOXY ANCHOR CHECK Linear Interpolation of Allowable Adhesive Bond Tension Loads Tension: Crtical Spacing TSpacingdgn 6.75in:=Critical Spacing TSpacingmin TSpacingdgn 0.251.688in=:=Minimum Spacing TSpacingallow 6.75in:=Currenting Spacing (Shall be Equal to Critial Spacing if Greater) THY150.dgn 2947lbf:=Allowable Design Tension Capacity for HILTI HY 150 Epoxy at Critical Spacing T:\JWME\Jobs\Tower Engineering Professionals\178245 - Miramar 1 Condominium\CALCULATIONS\Antenna 3 of 6 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 92 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/11/2020HILTI HY 150 EPOXY ANCHOR CHECK fs.STension 0.70:=Adjustment Factor of Allowable Load At Minimum Spacing THY150.min THY150.dgn fs.STension2062.9lbf=:=Allowable Design Tension Capacity at Minimum Spacing THY150.allow THY150.min THY150.dgn THY150.min-()TSpacingallow TSpacingmin-() TSpacingdgn TSpacingmin-()+2947lbf=:= UCT.HY150 Trisa.max THY150.allow 0.48( )=:=Unity Code for HILTI HY 150 Epoxy for Tension Loading (Spacing) Tension: Edge Distance TEDistance.dgn 5in:=Critical Edge Distance TEDistance.min TEDistance.dgn 0.331.65in=:=Minimum Edge Distance TEDistance.allow 5in:=Currenting Edge Distance (Shall be Equal to Critial Edge Distance if Greater) TED.dgn 2947lbf:=Allowable Design Tension Capacity for HILTI HY 150 Epoxy at Critical Edge Distance fsED.Tension 0.60:=Adjustment Factor of Allowable Load At Minimum Edge Distance TED.min TED.dgn fsED.Tension1768.2lbf=:=Allowable Design Tension Capacity at Minimum Edge Distance TED.allow TED.min TED.dgn TED.min-()TEDistance.allow TEDistance.min-() TEDistance.dgn TEDistance.min-()+2947lbf=:= UCT.ED Trisa.max TED.allow 0.48( )=:=Unity Code for HILTI HY 150 Epoxy for Tension Loading at Edge Distance Linear Interpolation of Allowable Adhesive Bond Shear Loads Shear: Crtical Spacing VSpacingdgn 6.75in:=Critical Spacing VSpacingmin VSpacingdgn 0.251.688in=:=Minimum Spacing VSpacingallow 4in:=Currenting Spacing (Shall be Equal to Critial Spacing if Greater) T:\JWME\Jobs\Tower Engineering Professionals\178245 - Miramar 1 Condominium\CALCULATIONS\Antenna 4 of 6 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 93 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/11/2020HILTI HY 150 EPOXY ANCHOR CHECK VHY150.dgn 4380lbf:=Allowable Design Shear Capacity for HILTI HY 150 Epoxy at Critical Spacing fs.SShear 0.70:=Adjustment Factor of Allowable Load At Minimum Spacing VHY150.min VHY150.dgn fs.SShear3066lbf=:=Allowable Design Shear Capacity at Minimum Spacing VHY150.allow VHY150.min VHY150.dgn VHY150.min-()VSpacingallow VSpacingmin-() VSpacingdgn VSpacingmin-()+3666.222lbf=:= UCV.HY150 Vrisa.max VHY150.allow 0.12( )=:=Unity Code for HILTI HY 150 Epoxy for Shear Loading at Spacing Shear: Edge Distance VEDistance.dgn 5.0in:=Critical Edge Distance VEDistance.min VEDistance.dgn 0.331.65in=:=Minimum Edge Distance VEDistance.allow 5.0in:=Currenting Edge Distance (Shall be Equal to Critial Edge Distance if Greater) VED.dgn 4380lbf:=Allowable Design Shear Capacity for HILTI HY 150 Epoxy at Critical Edge Distance Load Towards Edge fsED.Shear1 0.20:=Adjustment Factor of Allowable Load At Minimum Edge Distance (Load Towards Edge) VED.min1 VED.dgn fsED.Shear1876lbf=:=Allowable Design Shear Capacity at Minimum Edge Distance VED.allow1 VED.min1 VED.dgn VED.min1-()VEDistance.allow VEDistance.min-() VEDistance.dgn VEDistance.min-()+4380lbf=:= UCV.ED1 Vrisa.max VED.allow1 0.10( )=:=Unity Code for HILTI HY 150 Epoxy for Shear Loading at Edge Distance T:\JWME\Jobs\Tower Engineering Professionals\178245 - Miramar 1 Condominium\CALCULATIONS\Antenna 5 of 6 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 94 of 99 Miramar 1 CondominiumVerizon Site #1782459950 South Ocean DriveJensen Beach, FL 34957 12/11/2020HILTI HY 150 EPOXY ANCHOR CHECK Load Not Towards Edge fsED.Shear2 0.60:=Adjustment Factor of Allowable Load At Minimum Edge Distance (Load Not Towards Edge) VED.min2 VED.dgn fsED.Shear22628lbf=:= VED.allow2 VED.min2 VED.dgn VED.min2-()VEDistance.allow VEDistance.min-() VEDistance.dgn VEDistance.min-()+4380lbf=:= UCV.ED2 Vrisa.max VED.allow2 0.10( )=:=Unity Code for HILTI HY 150 Epoxy for Shear Loading at Edge Distance Unity Codes For Combined Loading Unity Code Combined Loading for SpacingUCCombined.Loading1 UCT.HY150()5 3 UCV.HY150()5 3+0.33( )=:= Unity Code Combined Loading for EdgeDistance (Perpendicular)UCCombined.Loading2 UCT.ED( ) 5 3 UCV.ED1( ) 5 3+0.32( )=:= Unity Code Combined Loading for EdgeDistance (Parallel)UCCombined.Loading3 UCT.ED( ) 5 3 UCV.ED2( ) 5 3+0.32( )=:= T:\JWME\Jobs\Tower Engineering Professionals\178245 - Miramar 1 Condominium\CALCULATIONS\Antenna 6 of 6 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 95 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 1 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condo Page: Specifier: E-Mail: Date: 1 WF 12/11/2020 Specifier's comments: 1 Input data Anchor type and diameter: HY 270 + threaded rod 5.8 3/4 Item number: 385432 HAS 5.8 3/4"x10" (element) / 2194247 HIT-HY 270 (adhesive) Effective embedment depth: hef = 6.750 in. Material: 5.8 Evaluation Service Report: ESR-4143 Issued I Valid: 1/1/2020 | 1/1/2021 Proof: Design Method ASD Masonry Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in. Anchor plateR : lx x ly x t = 12.000 in. x 12.000 in. x 0.500 in.; (Recommended plate thickness: not calculated) Profile: no profile Base material: Grout-filled CMU, L x W x H: 16.000 in. x 8.000 in. x 8.000 in.; Joints: vertical: 0.375 in.; horizontal: 0.375 in. Base material temperature: 68 °F Installation: Face installation Seismic loads no R - The anchor calculation is based on a rigid anchor plate assumption. Geometry [in.] 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 96 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 2 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condo Page: Specifier: E-Mail: Date: 2 WF 12/11/2020 Geometry [in.] & Loading [lb, in.lb] 1.1 Design results Case Description Forces [lb] / Moments [in.lb]Seismic Max. Util. Anchor [%] 1 Combination 1 N = 1,424; Vx = 261; Vy = 349; Mx = 0; My = 0; Mz = 0; no 56 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 97 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 3 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condo Page: Specifier: E-Mail: Date: 3 WF 12/11/2020 2 Proof I Utilization (Governing Cases) Design values [lb]Utilization Loading Proof Load Capacity bN / bV [%]Status Tension Bond strength 712 1,914 38 / -OK Shear Bond strength --- / 19 OK Loading bN bV a Utilization bN,V [%]Status Combined tension and shear loads 0.372 0.116 1.000 56 OK 3 Warnings • Please consider all details and hints/warnings given in the detailed report! Fastening meets the design criteria! 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 98 of 99 www.hilti.com Hilti PROFIS Engineering 3.0.65 Input data and results must be checked for conformity with the existing conditions and for plausibility! PROFIS Engineering ( c ) 2003-2020 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan 4 Company: Address: Phone I Fax: Design: Fastening point: JWME 4907 NW 43rd Street, Suite D, Gainesville, FL 32606 | 178245 - Miramar 1 Condo Page: Specifier: E-Mail: Date: 4 WF 12/11/2020 4 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific application. • You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or programs, arising from a culpable breach of duty by you. 178245 Miramar 1 Condominium Platform Pass-Fail Report 12/14/2020 99 of 99