When you submit your building permit application for a new single-family residence or duplex, you should use the following
checklist to determine if your application submittal is complete. Only complete applications filled out with ink can be accepted for
processing. 4_eiur�&r L101
ITEM"
HOWMANY� `
CO ' NTSa " r
Building Permit
1
A completely filled out building permit application must be
Application
submitted, including all required information. The
application must be signed by the applicant(s) and the
HON IYPVJI-5
signatures must be notarized.
Notice of Commencement
1
A recorded Notice of Commencement for all construction
with a value exceeding $2,500 has to be submitted at time
of building permit application.
Construction Plans
2 sets
All proposed construction must be accurately shown on the
plans including but not limited to electrical wiring,
0�,Oe,
plumbing, heat/air-conditioning, gas piping, windows and
doors. The minimum plot size for these plans is 8 %Z by 11
inches - maximum size is 24 by 36 inches: Both sets of
plans need to be signed and sealed by a Florida registered
Engineer or Architect and include truss plans. Both sets of
plans must be stamped by the Health Department, if a
septic permit is required.
Vegetation Removal Permit
1
All residential properties of any size require a completed,
Application �/�
signed, and notarized vegetation removal application. A
vegetation removal plan is required, including plans for
Need (1) Survey or Plot Plan
preservation, re -planting, and tree mitigation as applicable.
?
A survey and a landscape plan (if applicable per Land
11
Development Code Sections 7.09.03 & 7.09.04.1) must
fl� �j�6N
accompany the application. If you have any questions
please contact the Environment Resources Dept at 772-
462-2526.
Surveys
2
Surveys are required for all building permits involving a
177
primary structure or for accessory structure with a
be
C
construction value exceeding $10,000. All copies must
M �
1
stamped by the Health Department if a septic permit is
required. The surveys must be signed &/sealed by a
registered Florida surveyor.
Lot Splits
Any parcel or parcels not meeting the minimum
Non Conforming Lots of
requirements of the lot size and dimensional requirements
Record (NCLOR)
must be reviewed by the Zoning Department. Any division
of property not subject to Site Plan review through the
Growth Management Department will require review by
the Zoning Department. Please contact 772-462-1553.
Wind Load Calculation
2
This form must be signed/sealed by a Florida
Form
registered Engineer or Architect
ITEM
.77
HOW MANY?%
COlVIlVIENTS� ' , °4 ,
Subcontractor Agreement
1 each
One subcontractor agreement with original signature is
�1 J J
required for each subcontractor on the job. The building
permit cannot be issued until it has been determined that all
y a p101
subcontractors are properly licensed and registered.
(LOON
The use of unlicensed contractors is strictly prohibited.
Energy Calculation Form
2 each
Both forms must bear the original signatures of both the
&
creator and contractor.
Manual J's
V
Filled Land Affidavit
1
This form is required for all construction, except for
interior renovation. It must bear the original notarized
signature of the property owner. This affidavit serves to
notify the property owner of their responsibility not to
adversely impact their neighbor's properties with
stormwater drainage and runoff.
Product Review Affidavit
2
The Engineer or Architect of Record must certify all
components listed on the product affidavit per the
submitted plans. To be accepted for review this affidavit
must be completely filled out and signed and sealed. The
actual design pressures must be noted on the sealed
drawings for each component opening.
Recorded Warranty Deed
1
If the property has been purchased within the last six
months, the Property Appraiser records may not be to date.
�0
In this case we must see a recorded warranty deed in your
name to verify ownership.
Owner/Builder Affidavit
1
When the application is applied for under the owner/builder
provisions of Chapter 489.103(7), F.S., the applicant for
this building permit must personally appear to sign the
appropriate affidavit.
Health Department Septic
2
If you are planning to use an existing or new septic system,
Approval
you must first obtain Health Department approval for the
i 3 w 1 g 31
system. Surveys and the construction plans must bear the
original Health Department approval stamp.
Driveway Permit
1
When you directly access a State or County road, you are
required to obtain a driveway permit from the Florida
Department of Transportation or the St. Lucie County
Road & Bridge Department.
Flood Elevation Certificate
2
If your property is located within a designated flood zone
you are required to file an original flood elevation
certificate signed/sealed by a Florida registered surveyor.
NOTES:
❖ Additional information beyond that contained in the checklist may be required in order to ensure a complete review of
your building permit application.