Loading...
HomeMy WebLinkAboutRoof plansP ST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B, C 1,2,9,4,6,6,7 Prescriptive BUR RAS 1S0 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B, D . 1,2,4,SA7 Concrete or Clay Tile A, B, D, E 12,%4,5,6,7 Metal Roofs A, B, D i 2A4A67� Wood Shingles and Shakes A, B,D 1,24A67 Other As Applicable ATTACHMENTS REQUIRED As Aoolicablel- 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval S. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': Zone 1: _ Zone 2: _Zone 3: _ Max. Design Pressure, from the specific product approval system: Deck: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: _ Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':_" oc @ Lap, # Rows_ ® — W Zone 1_" oc @ Lap, # Rows _ ®= ao Zone 2:_"oc@ Lap, # Rows _®_°m Zone 3:—" oc @ Lap, # Row,_ ®_'oo Number of Fasteners Per Insulation Board: Zone 1':_Zone 1:_Zone 2:_Zone 3:_ Illustrate Components Noted and Details as Applicable: Woodblockin& Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. ST. LUCIE WORKS Section D (Steep Slope Roof System) Roof synem Manufacturer: OWENS CONRING DURATION Notice of Acceptance Number: FL#10674.1 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1:-67.Zone 2e: -67 Zone 2n:-42one 2r:-74 Zone 3e:-115 Zone 3r: Deck Type: PLYWOOD Type Undeflayment PEEL&STICK-O NS CORNING TRI-BUILTFIfi34639.1 Roof Sbpe: 8 ip Insulation: Fire Bander: Ridge Ventilatlon7 Fastener Type&Spacing: WFIELD/C'PERIMETER, 80 RING SHhNK NAILS Adhesiea type: �— Type Cap Sheet:---� Mean RaaPHeigM:15' FT Roof Covering: SHINGLES Type & Sim Drip Edge: ST. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. If the Mr values are greater than or equal to the Mrvalues, for each area of the roof, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: _xy __ _)- Mg: _=Md_ Product Approval Mi (Zone 2e: _x A_v __)_ Mg: _= Product Approval M. (Zone 2n: _x 3L_= _)_Mg;_=Mm,_ Product Approval Mr (Zone 2r: _.x)._c _)- ;_=Mz- Product Approval Mr (Zone 3e: _x 1_=-)-Mg;_=M,_ Product ApprovalM (Zone 3r: _x2._=_1-M9;-v M,y_ Product Approval Mr Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Pi-d-t e.,.,.,..,.,i e.. r required Moment Resistance' used' 35' 20' 25' 30' 40• 4.4 36.5 38.2 39.7 42.2 M 2.2 34.4 36.0 37.4 39.8 0.4 32.2 33.8 35.1 37.3 8.4 30.1 31.6 32.8 34.9 6.4 28.0 29.4 30.5 32.4 •Must he 4.4 25.9 27.1 28.2 30.0 In conJuncnon with a list of moment based the systems For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, If the F'values are greater than or equal to the F, values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: _x L_=x W:= _� -W; cos r= Fa Product Approval F' (Zone 2e: _x L x W:=_) _W._ cos r =Fr2e Product Approval F' (Zone 2n:_x Lx W:=_)_W:_ cos r_Fa„_ Product Approval F' (Zone 2r: _x L =x W:=_-)-W: cos r= Frar Product Approval F' (Zone 3e:_ (Zone =xWr=_J_W;_cosr=Fr3 Product Approval F' (Zone3r:_x L_x Wes_)-W: Cos r=Frs,_ Product Approval F' Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis Prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope B Job Sae Aerodynamic Muaiplier a Product Approval Restoring Moment due to Gravity Mt Product Approval Attachment Resistance Mr Product Approval Required Moment Resistance Mr Calculated Minimum Attachmem Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L=length W=width Product Approval All calculations must be submitted to the building official at the time of permit application.