HomeMy WebLinkAboutHoban Contract3921 S. US Hwy 1 Licensed & Insured
Fart Pierce, FL 34982
All 14 Area _;z
RoofingCCC1330649
Phone: (772) 464-6800 tea( cam^-r_�
Fax: (772) 464-6600 rw:�.•:�so/,c.:,�:r. www.AIIAReaRoofingFTP.com
PROPOSAL SUBMITTED TO:
PHONE:
DATE:
TIM HOBAN
772-519-0184
14/28/21
STREET:
OTHER:
6803 SANTA ROSA PKWY
TMH966@COMCAST.NET
CITY, STATE AND ZIP CODE:
JOB LOCATION:
FORT PIERCE, 34951
SALES PERSON:
DATE OF PLANS:
JOB NAME:
JOB NUMBER
JEREMY DONALDSON
# STORIES 1 PITCH 4:12
SCOPE OF WORK FOR RE -ROOF:
#LAYERS MANSARD-
" Provide permit from local building dept if required HIP XXX GABLE
• Remove existing (1) one layer roof down to decking (add'[ layers extra)
" Replace rotten decking at $120 per sheet (2) sheets included
" Any additional wood replacement will be billed at time and material
' Re -nail wood deck using 2 1 /2" 8d R/S fasteners 6" o.c. and 4" o.c. at perimeter
• Install self -adhered underlayment over entire roof deck
" Install 3" x 3" roof edge (White) 1 l
" Install new valley metal, plumbing boots and galvalume roof vents • Install GAF Timberline HDZ Dimensional Shingles Colorsi
1 1 /4" RS Nails 6
using at nails per shingle: (Standard
" Install 401f ridge veltilation
" Remove all roof related debris from project site
" GAF MASTER ELITE CONTRACTOR SILVER PLEDGE WARRANTY 50 YEARS MATERIAL Et LABOR AND 10 YEAR WORKMANSHIP
Disclaimer Unpredictable and Other Conditions Include But Not Limited To:
1. Fascia that is covered by aluminum or vinyl, sub fascia, and rotten beams where replacement is required
2. Soffit work that is integral to fascia
3. Structural gutters that must be removed to facilitate replacement of drip edge, rotten fascia or sub fascia
4. Roof decking not sufficient to code
5. Any work not included in Proposal/Contract will require a change order to be paid at that time
6. Additional work due to unpredictable and unforeseen conditions will be invoiced as follows:
Material plus 25% and Labor at $75 per man hour for carpentry work
7. Not responsible for reinstalling satellite dish
We propose hereby to furnish material and/or labor -- complete in accordance with above specifications, for the sum of:
FOURTEEN -THOUSAND FIVE -HUNDRED dollars $ 14,500.00 )
Payment to be made as follows: 40% DEPOSIT AND BALANCE DUE UPON COMPLETION
All material is guaranteed to be as specified. All work to be completed in a workmanlike
manner according to standard practices. Any alteration or deviation from above specifi-
cation involving extra costs will be executed only upon written orders, and will become
an extra charge over and above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to carry fire, tornado and other necessary
insurance. Our workers are fully covered by Workmen's Compensation Insurance.
Authorized
Signature
JEREMY DONALDSON
Note: This proposal may be
withdrawn by us if not accepted within
lid
Acceptance of Proposal -- The above prices, specification �—
and conditions are satisfactory and are hereby accepted. You are
authorized to do the work as spepified._ Payment will be made as Signature
outlined above. ��-`�7 1
Date of Acceptance' / '�L::: � �`" Signature
�
LJ - 1/) 6 1
days.