HomeMy WebLinkAboutDrawingZ g 0
, 'des
x Plan
ter Bath
0
Scope of Work:
1- Remove shower file, Mures, cabinets and tops
2- Remove non -load bearing partitions as noted
3- Replace shower valve, sinks, faucets and tub with new.
4- Frame new non -load bearing partitions as noted
5- Install new fighting fudures as noted
6- Install new tile backer in shower, lower curb and
reconfigure shower for seat
7- Install new non-skid tile on shower floor
8- Install new file an shower walls
9- Install new cabinets as per plans
10- Supply and install new countertops
11- Add new frameless glass above short shower wall
12- Repair drywall as necessary and paint walls and
ceiling
13- Note:"AII new fixtures to remain in same position as epstir
Zgroup, 772.E
design & remod,
Plan
th