Loading...
HomeMy WebLinkAboutDrawingZ g 0 , 'des x Plan ter Bath 0 Scope of Work: 1- Remove shower file, Mures, cabinets and tops 2- Remove non -load bearing partitions as noted 3- Replace shower valve, sinks, faucets and tub with new. 4- Frame new non -load bearing partitions as noted 5- Install new fighting fudures as noted 6- Install new tile backer in shower, lower curb and reconfigure shower for seat 7- Install new non-skid tile on shower floor 8- Install new file an shower walls 9- Install new cabinets as per plans 10- Supply and install new countertops 11- Add new frameless glass above short shower wall 12- Repair drywall as necessary and paint walls and ceiling 13- Note:"AII new fixtures to remain in same position as epstir Zgroup, 772.E design & remod, Plan th