Loading...
HomeMy WebLinkAboutCreekside Lot 78 W- Door Bucks.pdf®UNIVERSAL` ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: S Z / Permit No Project: C (Le-2-/z Address: Z 9 -7;?-/ Al I Ty L i e 7� Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): v/I - 0/7V BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: /3 3 Cu�C�oo2 �uc/C, Inspection Results: HAP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: 14 AJ g G p j- OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com